UEC Meeting: May 6, 20061 Remote Operations Center Erik Gottschalk.

Slides:



Advertisements
Similar presentations
Auger Project Management H. Glass Director’s Review15-Dec-2011 Fermilab (Technical Division) has hosted Auger Project Management office since collaboration.
Advertisements

1 Federal Communications Commission (FCC) Communications Security, Reliability and Interoperability Council (CSRIC) Working Group 1A - Public Safety Consolidation.
Accelerating Science and Innovation. Science for Peace CERN was founded in 1954 as a Science for Peace Initiative by 12 European States Member States:
From Olivier to commissioning team plans for the start-up of regular operations of LHCb 30/06 to 4/07 : Global commissioning week, all detectors, full.
J. Patrick - Major Challenges/MOPA021 – a new Remote Operations Center at Fermilab J. Patrick, et al Fermilab.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
US CMS Collaboration Meeting: April 7-8, LHC Remote Operations Center Erik Gottschalk Fermilab.
Global accelerator TTF Raimund Kammering DESY MVP TTF2 Review Meeting at Salzau, January 2003.
LHC Accelerator Coordination Meeting: March 28, Remote Operations for CMS Erik Gottschalk.
Brochure: Lucas Taylor CHEP 2009, Prague1CMS Centres Worldwide : A New Collaborative.
J. Patrick - Major Challenges/MOPA021 – a new Remote Operations Center at Fermilab J. Patrick, et al Fermilab.
Presentation to OHEP, OFES, OASCR: Nov 7, Remote Operations and Collaborative Technologies for Distributed Science --- HEP & FES --- Erik Gottschalk.
Requirements Review – July 21, Requirements for CMS Patricia McBride July 21, 2005.
Fermilab User Facility US-CMS User Facility and Regional Center at Fermilab Matthias Kasemann FNAL.
1 Kenneth Osborne, 9/14/07 Inter Group communications at the Advanced Light Source. Overview of the different methods of communication between different.
Nov. 5th, 2007CMS Tier1 visit to FNAL, “Commissioning, Global Runs & ROC”, Kaori Maeshima 1 Commissioning, Global Runs & ROC CMS Tier1 visit to FNAL November.
US CMS/D0/CDF Jet/Met Workshop – Jan. 28, The CMS Physics Analysis Center - PAC Dan Green US CMS Program Manager Jan. 28, 2004.
A.Golunov, “Remote operational center for CMS in JINR ”, XXIII International Symposium on Nuclear Electronics and Computing, BULGARIA, VARNA, September,
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
Collaborating at a Distance: Operations Centers, Tools, and Trends, Erik Gottschalk 1 Collaborating at a Distance: Operations Centers, Tools, and Trends.
GLAST LAT ProjectFace to Face Managers Meeting 04/14/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to Face to Face Managers.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
J. Mnich GDN Status and Plans Global DetectorNetwork Status and Plans Joachim Mnich DESY March 21 st, 2005 What is the Global Detector Network? Summary.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Accelerator Physics Department Meeting July 26, 2006 Jean slaughter1 Status Report APD Meeting July 26, 2007 Jean Slaughter.
IAEA International Atomic Energy Agency. IAEA Outline LEARNING OBJECTIVES REVIEW TEAM AMD COUNTERPARTS Team Composition Qualification PREPARATORY PHASE.
News Y2K June 25, Summary of June 12 Face-to-Face Meeting.
Randall Sobie University of Victoria IHEPCCC - HEPiX April International HEP Computing Coordination Committee Randall Sobie.
LARP Collaboration Meeting April BNL -FNAL - LBNL - SLAC Status Report E. Harms 28 March 2006.
John Womersley 1/13 Fermilab’s Future John Womersley Fermilab May 2004.
Remote Monitoring for Hardware & Beam Commissioning E. Harms/FNAL 7 April 2005 Port Jefferson, New York bnl - fnal- lbnl - slac US LHC Accelerator Research.
Projects, Tools and Engineering Patricia McBride Computing Division Fermilab March 17, 2004.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
11/3/2010 CM15 Controls for LARP and LAFS - 1 Terri Lahey LARP/LAFS/CERN and SLAC.
CD Strategy Session/Briefing on Collaboration Tools: Sept. 12, Collaboration Tools Erik Gottschalk.
Your-own-afs-password CMS Centre CMS System Login: Password: N.B. you must.
Visit to CERN/CMS Jan 2006 Patricia McBride Fermilab Slides taken from presentations by Hans Hoffmann and Werner Jank.
Committee – June 30, News from CERN Erik Gottschalk June 30, 2005.
Remote Operations Committee – May 12, Subgroups and Scenarios Erik Gottschalk May 12, 2005.
Communication Tools Used For Commissioning the 12 GeV CEBAF Accelerator Brian Freeman WAO (Mainz, Germany) October 2014.
Remote Operations Committee – May 26, Committee News Erik Gottschalk May 26, 2005.
CMS ROC Report Patricia McBride May 26, 2005.
CMS Centre Project - Green Light Meeting
The CMS Experiment at LHC
Distributed Collaborations
LHC Science Goals & Objectives
Remote Operations Erik Gottschalk Fermilab
JRA3 Introduction Åke Edlund EGEE Security Head
Remote Operations For High Energy Physics
CMS Centres for Control, Monitoring, Offline Operations and Analysis
Erik Gottschalk for Jean Slaughter
Remote Operations Erik Gottschalk 5 October, 2005
Assessment of Our Status After 183 Days (6 months)
CMS Centres Worldwide CMS Centres Worldwide
Remote Operations for CMS & LHC Erik Gottschalk Fermilab
Remote Operations at Fermilab
Update Erik Gottschalk.
Remote Operations Erik Gottschalk 7 September, 2005
CMS Centres for Control, Monitoring, Offline Operations and Analysis
EPPCN European Particle Physics Communication Network
Operations Model Thursday, October 20, 2005 October 13, 2005 Jean Slaughter.
HCAL Commissioning and Related Activities
Overview of the FEPAC Accreditation Process
GLAST Large Area Telescope Instrument Science Operations Center
Preparation of the CLAS12 First Experiment Status and Time-Line
Legislative Budget Office (LBO) 2-Year Workplan
Best Practices Program Contact – Role & Responsibility Overview
Imaging & Engineering STAP Meeting 12th-13th of April 2018
Preliminary Project Execution Plan
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

UEC Meeting: May 6, Remote Operations Center Erik Gottschalk

UEC Meeting: May 6, Historical Overview Initial concept for LHC remote operations center: Dan Green – ROC at Fermilab for CMS test beams, CMS commissioning and operations Alvin Tollestrup – remote operations center at Fermilab to apply accelerator expertise in the US to commissioning of the LHC (LARP: LHC Accelerator Research Program) Charge from Director Witherell (April 14, 2005) Kickoff meeting with approx. 30 participants (May 4, 2005) “A Vision for Fermilab” presentation to EPP2010 (May 16, 2005) Director Oddone: “Remote control/monitoring/data centers at Fermilab for both accelerator and detector(s)”

UEC Meeting: May 6, OverviewOverview What is CMS and LHC control rooms at CERN Remote operation of CMS Plans for ROC & 3D model of Summary (ROC web page) web page)

UEC Meeting: May 6, What is A Place That provides access to information in a manner that is similar to what is available in control rooms at CERN Where members of the LHC community can participate remotely in CMS and LHC activities A Communications Conduit Between CERN and members of the LHC community located in North America An Outreach tool Visitors will be able to see current LHC activities Visitors will be able to see how future international projects in particle physics can benefit from active participation in projects at remote locations.

UEC Meeting: May 6, Control Rooms at CERN Temporary CMS control room for the Magnet Test Cosmic Challenge (MTCC) – “green barrack” CMS control room at Point 5  Under construction CMS Control & Analysis Room (CCAR)  Future remote operations (and control) center at Meyrin  Described as the “heartbeat” of CMS at CERN New LHC control room – CERN Control Centre The CCC combines all of the control rooms for the accelerators, cryogenic systems and technical infrastructure into one room. The CCC began operations on February 1 st, 2006.

UEC Meeting: May 6, – LARP/LHC needs CCC Model of the CCC at CERN training prior to stays at CERN remote participation for studies ‘service after the sale’

UEC Meeting: May 6, Remote Operation of CMS Why does CMS need remote operations at CERN? SX5 is ~13 km from Meyrin SX5 lacks “infrastructure” available at Meyrin CMS control room, currently under construction, is not large CMS control room has a low ceiling SX5 does not have large and small meeting rooms that are necessary for daily/weekly meetings and expert space Paris Sphicas (CMS Management): Asymptotically, at sufficiently long times after startup, we will run CMS remotely This is not a question of whether this will happen – it’s a question of when.

UEC Meeting: May 6, Remote Operations in the U.S. The ROC (WH-11) is ready for operations! Planning for remote operations for CMS commissioning and operations, and LHC beam commissioning and operations Transition from the 11 th floor to the 1 st floor of Wilson Hall by Spring 2007  More visibility  Joint effort for CMS & LARP  Combine commissioning & operations efforts

UEC Meeting: May 6, ROC (WH-11)

UEC Meeting: May 6, (WH-1) 1) Dedicated facility to support both CMS and LHC commissioning and operations. Remote shifts for CMS 2) Facilitate communication with CMS and LHC control rooms. Call center for US-CMS collaborators to access information about CMS and the LHC accelerator. Introduce collaboration tools to improve communication 3) Take advantage of a unique opportunity to have detector and accelerator experts working together to solve problems.

UEC Meeting: May 6, Task Force Erik Gottschalk – Chair (FNAL-PPD) Kurt Biery (FNAL-CD) Suzanne Gysin* (FNAL-CD) Elvin Harms* (FNAL-AD) Shuichi Kunori (U. of Maryland) Mike Lamm* (FNAL-TD) Mike Lamont* (CERN-AB) Kaori Maeshima (FNAL-PPD) Patty McBride (FNAL-CD) Elliott McCrory* (FNAL-AD) Andris Skuja (U. of Maryland) Jean Slaughter* (FNAL-AD) Al Thomas (FNAL-CD) The task force had its last meeting on March 29, * Accelerator Subgroup Task force was charged by the Fermilab Director in April, Task force wrote a requirements document and WBS. Work completed in March, 2006.

Requirements Review – July 21, Planning for The task force developed a plan with CMS collaborators. Most of our input came from CMS HCAL and tracker groups, with some input from CDF, D0, MINOS, and MiniBoone. We worked with CMS and US-CMS management, as well as members of LARP (LHC Accelerator Research Program), LARP management, and the LHC machine group at all steps in the process. A requirements document for was prepared and reviewed last summer. We visited 9 sites (e.g. Hubble, NIF, ESOC) to find out how other projects do remote operations. The goal is to have ready before the start of beam (end of 2006).

UEC Meeting: May 6, – Floor plan

UEC Meeting: May 6, New Location & Layout Operations Center (Phase 1) Office Space (Phase 2) Conference Room (Phase 1)

UEC Meeting: May 6, – renderings

UEC Meeting: May 6, – Floor plan

UEC Meeting: May 6, – Isometric view

UEC Meeting: May 6,

UEC Meeting: May 6,

UEC Meeting: May 6, Possible CMS Activities Operations Center: Online shifts (DQM, trigger monitoring) Offline shifts (data processing, data distribution, GRID) Miscellaneous (shift training, DB maintenance) Call center for US-CMS Conference Room: Daily & weekly meetings Office Space: Two small meeting rooms (3 – 5 people each) Expert space Rest area for shifters

UEC Meeting: May 6, Possible LHC Activities Operations Center: Commissioning (hardware, beam) LHC Instrumentation (Schottky, luminosity, PLL/BBQ) Training (control system) Conference Room: Daily & weekly meetings Office Space: Small meeting rooms Expert space

UEC Meeting: May 6, SummarySummary We have developed plans for a joint CMS and LHC remote operations center, and are working on finalizing the construction drawings. We expect to begin construction by June 2006, and complete construction by October We believe that will be a place that actively supports commissioning and operations of both the LHC and CMS, and will help to keep the HEP community actively engaged in activities at CERN. We welcome comments and suggestions.

UEC Meeting: May 6, Additional Slides

UEC Meeting: May 6, AssumptionsAssumptions For CMS CMS will have a shift schedule, a run plan, and a protocol that defines responsibilities and roles of shift personnel. We assume that a shift leader is responsible for CMS shift activities. will have shift operators who will be able to assist US-CMS collaborators with CMS activities during commissioning and operations. will participate in CMS shifts. Neither the duration nor the frequency of the shifts has been determined. The CMS Collaboration will have a protocol for access to the CMS control system (PVSS), and a policy for how access to the control system will vary depending on the physical location of an individual user. The CMS Collaboration will have a policy that defines how DAQ resources are allocated. This includes allocation of DAQ resources to various detector groups for calibration and testing. The CMS Collaboration will have a protocol that defines how on-demand video conferencing will be used in CMS control rooms and The CMS Collaboration will provide web access to electronic logbook and monitoring information to collaborators worldwide The CMS Collaboration will maintain a call tree that lists on-call experts worldwide for each CMS subsystem during commissioning and operations For both CMS & LHC will comply with all CERN and Fermilab safety and security standards.

UEC Meeting: May 6, Site Visits Technology Research, Education, and Commercialization Center (TRECC) – West Chicago, Illinois (Aug. 25, 2005) Gemini Project remote control room – Hilo, Hawaii (Sept. 20, 2005) Jefferson Lab control room – Newport News, Virginia (Sept. 27, 2005) Hubble Space Telescope & STScI – Baltimore, Maryland (Oct. 25, 2005) National Ignition Facility – Livermore, California (Oct. 27, 2005) General Atomics – San Diego, California (Oct. 28, 2005) Spallation Neutron Source – Oak Ridge, Tennessee (Nov. 15, 2005) Advanced Photon Source – Argonne, Illinois (Nov. 17, 2005) European Space Operations Centre – Darmstadt, Germany (Dec. 7, 2005)