1 CMS Centre Project - Green Light Meeting
18th June 2007 18 June 2007 Lucas Taylor

2 Participants From CMS Sergio Cittolin CMS TriDAS Project Manager
Lucas Taylor Participants 18 June 2007 From CMS Sergio Cittolin CMS TriDAS Project Manager Michel Della Negra Former CMS Spokesman Patricia McBride CMS Computing (co-) Project Manager Achille Petrilli CMS Resource Manager David Stickland CMS Control Room Project Manager Lucas Taylor CMS Centre Project Manager From TS Dept. Mauro Nonis Facilities Management, Head Yannic Body Cooling and Ventilation Alain Louis Favre Electrical Richard Morton Civil Engineering

3 Aim of the Meeting Present the “CMS Centre” Baseline Plan
Lucas Taylor Aim of the Meeting 18 June 2007 Present the “CMS Centre” Baseline Plan WBS, costs, and schedule Focus mostly on Technical Services Discuss, clarify, make adjustments Assuming general consensus … CMS gives a green light to start agreed program of work Budget authorization to TS-FM

4 CMS Centre Requirements
Lucas Taylor CMS Centre Requirements 18 June 2007 “CMS Centre” RTAG (Requirements & Technical Assessment Group) CMS NOTE / 010 CMS Centre is the main centre for Offline data quality monitoring, calibrations, alignment, rapid analysis Computing operations for CMS Communication with P5 Control Room and offsite collaborators Crucial to CMS success

5 Overall Vision similar to CCC or LHC@FNAL
Lucas Taylor Overall Vision similar to CCC or 18 June 2007 FNAL Already operational CMS Centre is similar in design and functions (3 times bigger)

6 Development of Baseline Plan
Lucas Taylor Development of Baseline Plan 18 June 2007 Based plans on CMS requirements from RTAG And ongoing discussions with CMS community Learned from other similar projects CERN Control Centre (CCC) – also for CMS so aim to be consistent Erich Keller AG - control room design and construction Explored alternatives to reduce costs HVAC options, cheaper materials, simpler consoles… A lot of help from CERN / AB, IT, PH, SC, TS …

7 Schedule and Milestones
Lucas Taylor Schedule and Milestones 18 June 2007 Specification of Requirements Mar 2007 CMS NOTE / 010 Technical evaluation / design studies Mar–June 07 Baseline plan complete Jun 2007 WBS, schedule, costs “Green Light Review” 18th Jun 07 TS work starts Jun 2007 Technical Services work complete Nov 07 IT systems installation Nov–Dec 07 Commissioning of applications Jan–Feb 07 CMS Centre ready for LHC data-taking Mar 2008 Currently we are 2 weeks ahead of our schedule "CMS Centre Green Light Meeting" Lucas Taylor, 18 June 2007

8 Width from pillar to console: 0.5 m
Lucas Taylor CMS Centre Layout 18 June 2007 buildings 6,8,9 Projector 26.0 m Width from pillar to console: 0.5 m Meeting Room (AB) 11.4 m 1m x 2m 1m x 2ms 1m x 2m Corridor width: 1.2 m Corridor width: 1.2 m Outreach Projector Projector Corridor width: 1.4 m Corridor width: 1.4 m Projector Office / Small Meeting Room CMS Centre Office Meeting Room (CMS) Office / Small Meeting Room / kitchen Rest area "CMS Centre Green Light Meeting" Lucas Taylor, 18 June 2007

9 Computing Consoles 2-3 monitoring screens
Lucas Taylor Computing Consoles 18 June 2007 2-3 monitoring screens (e.g. displays from Control Room) 2-3 screens for interactive work Services cabinet PCs, cables, ventilation Projector 26.0 m Width from pillar to console: 0.5 m 1m x 2m 1m x 2ms 1m x 2m Corridor width: 1.2 m Corridor width: 1.2 m Outreach Projector 24 Operations / Monitoring Consoles Corridor width: 1.4 m Corridor width: 1.4 m "CMS Centre Green Light Meeting" Lucas Taylor, 18 June 2007

10 Technical Evaluations Completed
Lucas Taylor Technical Evaluations Completed 18 June 2007 Radiation AB / SC: measured PS stray radiation, simulations PS reconfigured, backup plan (concrete) Safety Commission and Ergonomics Inspection / report re: noise, temperature, entrances, workstations, furniture, air-conditioning, ventilation … Lighting levels measured - need to meet norms Acoustics Measurements by expert consultant (too noisy) Simulations, proposals for improvements TS Department - FM, CV, EL, CE expert advice

11 WBS Level 2 Cost Summary (kCHF)
Lucas Taylor WBS Level 2 Cost Summary (kCHF) 18 June 2007 Focus of today’s meeting

12 1. Technical Services 18 June 2007 Lucas Taylor

13 1.1 Technical Services / Refurbishment and Safety
Lucas Taylor 1.1 Technical Services / Refurbishment and Safety 18 June 2007

14 1.1 Technical Services / Refurbishment and Safety
Lucas Taylor 1.1 Technical Services / Refurbishment and Safety 18 June 2007 kCHF

15 1.2 Technical Services / Noise Reducing Insulation
Lucas Taylor 1.2 Technical Services / Noise Reducing Insulation 18 June 2007

16 1.3 Technical Services / Electrical Services
Lucas Taylor 1.3 Technical Services / Electrical Services 18 June 2007

17 1.3 Technical Services / Electrical Services
Lucas Taylor 1.3 Technical Services / Electrical Services 18 June 2007

18 1.4 Technical Services / Network and Telephone
Lucas Taylor 1.4 Technical Services / Network and Telephone 18 June 2007

19 1.4 Technical Services / Network and Telephone
Lucas Taylor 1.4 Technical Services / Network and Telephone 18 June 2007

20 1.5 Technical Services / Air Conditioning
Lucas Taylor 1.5 Technical Services / Air Conditioning 18 June 2007

21 1.5 Technical Services / Air Conditioning
Lucas Taylor 1.5 Technical Services / Air Conditioning 18 June 2007 Fan coils around periphery of room Use existing iced water plant (6 degrees) buildings 6,8,9 Projector 26.0 m Width from pillar to console: 0.5 m Meeting Room (AB) 11.4 m 1m x 2m 1m x 2ms 1m x 2m Corridor width: 1.2 m Corridor width: 1.2 m Outreach Projector Projector Corridor width: 1.4 m Corridor width: 1.4 m Projector Office / Small Meeting Room CMS Centre Office Meeting Room (CMS) Office / Small Meeting Room / kitchen Rest area "CMS Centre Green Light Meeting" Lucas Taylor, 18 June 2007

22 1.5 Technical Services / Air Conditioning
Lucas Taylor 1.5 Technical Services / Air Conditioning 18 June 2007

23 Technical Services Cost Summary (kCHF)
Lucas Taylor Technical Services Cost Summary (kCHF) 18 June 2007

24 Technical Services Schedule
Lucas Taylor Technical Services Schedule 18 June 2007 M. Nonis, TS

25 2. Furniture and Consoles
18 June 2007 Lucas Taylor

26 2. Furniture and Consoles
Lucas Taylor 2. Furniture and Consoles 18 June 2007

27 2. Furniture and Consoles
Lucas Taylor 2. Furniture and Consoles 18 June 2007 2-3 monitoring screens (e.g. displays from Control Room) 2-3 screens for interactive work Services cabinet 2 PCs, cables, ventilation Projector 26.0 m Width from pillar to console: 0.5 m 1m x 2m 1m x 2ms 1m x 2m Corridor width: 1.2 m Corridor width: 1.2 m Outreach Projector 24 Operations / Monitoring Consoles Corridor width: 1.4 m Corridor width: 1.4 m "CMS Centre Green Light Meeting" Lucas Taylor, 18 June 2007

28 2.1 Furniture and Consoles / General Furniture
Lucas Taylor 2.1 Furniture and Consoles / General Furniture 18 June 2007

29 2.2 Furniture and Consoles / Computing Consoles
Lucas Taylor 2.2 Furniture and Consoles / Computing Consoles 18 June 2007

30 2.3 Furniture and Consoles / Infrastructure and Miscellaneous
Lucas Taylor 2.3 Furniture and Consoles / Infrastructure and Miscellaneous 18 June 2007

31 2. Furniture and Consoles Cost Summary (kCHF)
Lucas Taylor 2. Furniture and Consoles Cost Summary (kCHF) 18 June 2007

32 3. IT Equipment 18 June 2007 Lucas Taylor

33 3.1 & 3.2 IT Equipment / Interactive & Monitoring Computing
Lucas Taylor 3.1 & 3.2 IT Equipment / Interactive & Monitoring Computing 18 June 2007

34 3.3 IT Equipment / Miscellaneous IT Equipment
Lucas Taylor 3.3 IT Equipment / Miscellaneous IT Equipment 18 June 2007

35 3. IT Equipment Cost Summary (kCHF)
Lucas Taylor 3. IT Equipment Cost Summary (kCHF) 18 June 2007

36 CMS Centre – Related work
Lucas Taylor CMS Centre – Related work 18 June 2007 New CMS offices in PS area (B 354, 8, 6, 9, 10) Starting to move (Computing, Offline, HCAL DPG…) “Computing Operations Centre” for CSA07 Jul 07 Large operations room (8 / 1-016) + offices Refurbishment, networks, IT systems… Can test CMS Centre IT systems / applications and use for upcoming cosmic runs - Nov-Dec 07 General plan to (re-)furbish meeting rooms at CERN for phone- / video-conferencing Outreach displays for CMS Centre See backup slides for details "CMS Centre Green Light Meeting" Lucas Taylor, 18 June 2007

37 Lucas Taylor Cost Summary (kCHF) 18 June 2007

38 Backup Slides Covering preliminary cost estimates for activities related to CMS Centre – vidoeconferencing and outreach 18 June 2007 Lucas Taylor

39 CMS Centre – Related work
Lucas Taylor CMS Centre – Related work 18 June 2007

40 4. Phone and Video Conferencing
18 June 2007 Lucas Taylor

41 4.1 Phone and Video-Conferencing
Lucas Taylor 4.1 Phone and Video-Conferencing 18 June 2007

42 4.1 Phone & Video-Conferencing / PC, Projector, Screen
Lucas Taylor 4.1 Phone & Video-Conferencing / PC, Projector, Screen 18 June 2007

43 4.2 & 4.3 Phone and Video- Conferencing Equipment
Lucas Taylor 4.2 & 4.3 Phone and Video- Conferencing Equipment 18 June 2007

44 4.4 Phone and Video-Conferencing / Noise-reducing Insulation
Lucas Taylor 4.4 Phone and Video-Conferencing / Noise-reducing Insulation 18 June 2007

45 4. Phone and Videoconferencing Cost Summary (kCHF)
Lucas Taylor 4. Phone and Videoconferencing Cost Summary (kCHF) 18 June 2007

46 5. Outreach 18 June 2007 Lucas Taylor

47 Lucas Taylor 5.1 Outreach / Displays 18 June 2007 "CMS Centre Green Light Meeting" Lucas Taylor, 18 June 2007

48 5. Outreach Cost Summary (kCHF)
Lucas Taylor 5. Outreach Cost Summary (kCHF) 18 June 2007