2016-06-06 1 / 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version.

Slides:



Advertisements
Similar presentations
19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Advertisements

PANDA Mechanical Workshop Backward Endcap Calorimeter Geometry David Rodríguez Piñeiro GSI Darmstadt PANDA Mechanical Workshop GSI
Wine Cellar Split System Basics. Definitions Split System – A cooling unit that “splits” the cooling coil and the condenser apart into two remote pieces.
Excel Environ Racks Simon Robinson. Ranges Sizes Features Environ v. formal surround; enclose.
MICE Hall – South Mezzanine Jason Tarrant - STFC l Contents »Device checks with current South Mezzanine »South Mezzanine change summary »Conclusion.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
Installation. Indoor Unit Installation Typical Installation.
7/28/03P. Kroon AEROGEL Assembly of Cells into 80-cell Array: –8 cells wide by 10 cells high mm high (Y) by 2077 mm wide (Z) by about 335 mm deep.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
INSTALLATION & COMMISSIONING. 5WSS Installation Hanging the Unit Hanging the Unit Location Considerations Location Considerations Refrigerant Piping Refrigerant.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Building Plans.
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
INTEGRATION OF THE CBM SILICON TRACKING SYSTEM U. Frankenfeld for the CBM collaboration supported by BMBF, EU-FP7 HadronPhysics3 and CRISP.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Shashlyk FE-DAQ requirements Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA FE-DAQ workshop, Bodenmais April 2009.
ATLAS 1 Beam Pipe Support Structure (BPSS) Interface and Assembly Final Design Review, April 2003 E. Anderssen, N. Hartman LBNL.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
Routing of Cables and Tubes at the Target Spectrometer PANDA Mechanics Workshop, April 2015 J. Lühning, GSI Routing at the barrel.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
MVD COOLING STATUS COOLING PLANT UPDATE: -ADDITION of the NEW CIRCUITS FOR GBT AND DC-DC Converter BOARDS IN THE COOLING PLANT -THERMAL STUDY OF GBT AND.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
PANDA Yoke unsolved Interface problems Presented by E. Koshurnikov (Dubna) December 9, 2011, GSI.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
G. GIRAUDO - D. ORECCHINI Beam-Target line for PANDA – GSI – 4 February 2013 Beam-Target line for PANDA – GSI – 4 February 2013 Central Trackers assembly.
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
Kitakami Side AHCAL Assembly or anywhere in any detector.
Miscellaneous about Target Spectrometer PANDA Mechanics Meeting, September 2015 J. Lühning, GSI Space around Barrel Target Platform Cable Routing.
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Miscellaneous MEC Topics Mainz, CM September 2016, MEC Session J
Status of the forward tracker design
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
Some Updates on Mechanics CM-MEC Session Dec J. Lühning, GSI
CLIC Handling Engineering Update
Miscellaneous Topics MEC Session, CM March 2017 at GSI J. Lühning, GSI
Platform Design for the Target Spectrometer using Heavy-Weight Rollers J. Lühning, GSI Darmstadt, Three design goals for Platform: Low construction.
Target Spectrometer Updates CM-MEC Session Giessen, March 2015 J
Solenoid Yoke Door-Barrel Connection
Various Views From CAD Layout Emphasis on the relative locations of
Update of MVD services and requests
Beam
VELO-installation meeting CERN, January 17, 2006
- CT INSTALLATION PROCEDURE OVERVIEW -
Present status of the flux return yoke design
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
PANDA Yoke of the Magnet
MVD updates SUMMARY OF GSI OCTOBER 28th -29th
Cooling pipes and Space for Services
David Rodríguez Piñeiro GSI Darmstadt PANDA Collaboration Meeting Turin EMC BW Endcap.
Central Tracker Support Frame MEC Session, CM June 2017 at GSI J
IHEP group Shashlyk activity towards TDR
Actual Dimensions in the Forward Spectrometer
Integration issues at IHEP
EMC BWE PANDA Insertion
First of all we will remind some numbers:
The sport hall.
Detector hall in mountain regions
as a prototype for Super c-tau factory
Rack Placement Chopper Workshop
Presentation transcript:

/ 11 Updates of PANDA 3D Model CM June 2016 at GSI, MEC Session J. Lühning, GSI Updates for: Panda Hall Target Spectrometer Latest version of Panda detector and Panda hall (version 1602, compressed STEP format and 3D-PDF) can be found here:

/ 11 Panda Hall some cable & pipe routing added space for stair towers allocated There is not much space left Lower section of Panda hall (E10) north

/ 11 Panda Hall Detectors in beam position compensation solenoid (size not yet fixed) stair tower for access to target platform, upper stair height above floor 6.3 meters concrete gate rack for muon filter (east)

/ 11 Panda Hall Target Spectrometer and Forward Detectors in maintenance position cable routes stair tower for access to target platform concrete gate platform for detectors parked upstream man lock to maintenance area

/ 11 Panda Hall tentative cabling of Muon Filter (flexible festoon) western half of Muon Filter in open position conductors for dipole, 2 × 55 m, routed along western wall of cave stationary big dipole placement of rack for downstream End Cap FEE ? western half of downstream End Cap in open position Beam area, view from northwest (western downstream side) stationary rack for Muon Filter FEE

/ 11 Target Spectrometer Target Spectrometer, view from southwest (western upstream side) gangway around south (upstream) and east section of target platform placement of rack for downstream End Cap FEE ? access to this rack platform only via a steep ladder?

/ 11 Target Spectrometer Target Spectrometer, view from northwest (western downstream side) gangway design for west end of target platform ? racks for upper eastern barrel muon detectors

/ 11 Target Spectrometer Western half of Target Spectrometer, upstream view (backward End Cap hidden) FEE boxes for barrel EMC (7 in total, volume 7 × 66 dm³) new design of barrel DIRC read-out requires less space for barrel EMC cooling pipes there is little space in the ducts (diameter of thermal insulation might be critical) upstream lines for muon counters (brown colour), 8 ducts, request per duct 138 cm² < A < 425 cm² coolant line (drain) barrel-EMC coolant line (drain) BE-EMC coolant manifold for EMCs

/ 11 Target Spectrometer View from southwest a few apertures in the webs of this vertical beam would be very useful for routing screws mounted from front side of door, threaded nuts on barrel side (mounting in opposite direction almost impossible) this sloped part of barrel support frame takes a lot of space which would be valuable for racks and supply lines Some changes which would ease installation and handling

/ 11 Next Design Steps Target Spectrometer: Target platform west (pumping area) More cable routing (assignment of racks to detectors needed) Upstream routing of MVD, STT, and BE-EMC (dedicated designer needed for solving this puzzle) Panda Hall: Service platform for MVD, STT, and BE-EMC in maintenance area Installation facilities for cryostat and barrel-EMC

/ 11 Please study 3d models and send me objections and caveats. Thank you!