Submission doc.: IEEE 11-13/1493r0 December 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 HEW SG Straw Polls Results Date: 2013-12-02 Authors:

Slides:



Advertisements
Similar presentations
Doc.: IEEE 802.EC-10/0015r0 Submission July 2010 Jon Rosdahl, CSRSlide EC Interim Meetings Proposal Date: Authors:
Advertisements

Sg-whitespace-09/0002r0 Submission January 2009 Steve Shellhammer, QualcommSlide 1 Possible TV White Space Coexistence Tasks Date: Authors:
Doc.: IEEE /0424r0 Submission March 2014 Osama Aboul-Magd, Huawei TechnologiesSlide 1 HEW SG PAR and CSD Comments and Resolutions Date:
Submission doc.: IEEE 11-13/1389r1 November 2013 Kiseon Ryu et.al, LG ElectronicsSlide 1 Discussion on HEW PAR Date: Authors:
Doc.: IEEE /1106r0 Submission September 2012 Osama Aboul-Magd, Huawei TechnologiesSlide 1 A Short-Header Frame Format Date: Authors:
Submission doc.: IEEE 11-13/1100r0 September 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 HEW SG Progress Review Date: Authors:
Doc.: IEEE hew Submission Sep 2013 Slide 1 PAR and 5C: Comments and some draft text based on n Date: Authors:
Submission doc.: IEEE 11-12/1447r1 December 2012 Donald Eastlake, Huawei TechnologiesSlide 1 Divide and Conquer Date: Authors: NameAddressAffiliationsPhone .
Submission doc.: IEEE /0609r2 May 2015 Yan Xin, Huawei TechnologiesSlide ay Timeline Date: Authors:
Doc.: IEEE /0699r0 Submission May 2015 Jonathan Segev (Intel Corporation)Slide 1 NGP SG May 2015 Closing Report Date: Authors:
Doc.: IEEE /1514r0 Submission November 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG November 2014 Closing Report Date: Authors:
Doc.: IEEE /0173r0 Submission January 2015 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG January 2015 Closing Report Date: Authors:
Doc.: IEEE /1301r0 Submission September 2014 Edward Au (Marvell Semiconductor)Slide 1 NG60 SG September 2014 Closing Report Date: Authors:
Doc.: IEEE /1536r0 Submission November 2014 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGax November 2014 Closing Report Date: Authors:
Doc.: IEEE /0677r0 Submission May 2015 Slide 1 IEEE ah Closing Report for May 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0015r0 Submission January January 2015 WG Motions Date: Authors: Dorothy Stanley, Aruba Networks.
Doc.: IEEE /0081r0 Submission January 2012 Osama Aboul-Magd, Huawei TechnologiesSlide 1 On Traffic Stream Setup for Audio/Visual Bridging Date:
Submission doc.: IEEE 11-14/0026r1 January 2014 Yong Liu, et al.Slide 1 Thoughts on HEW PAR Date: Authors:
Doc.: IEEE /430 March 2015 TGax MU ad-hoc groupSlide 1 TGax MU ad-hoc March 2015 Agenda Date: Authors:
Doc.: IEEE /0065r0 Submission January 2014 William Carney, SONYSlide 1 Comments on Draft HEW PAR Date: Authors:
Doc.: IEEE /0800r3 SubmissionHemanth Sampath, QualcommSlide 1 HEW Study Group Documentation Date: Authors: July 2013.
Doc.: IEEE /0616r2 Submission May 2013 Phillip Barber (Huawei Technologies)Slide 1 HEW Project Plan Discussion Date: Authors:
Doc.: IEEE /0547r0 Submission May 2009 Menzo Wentink, QualcommSlide 1 IEEE TGz Montreal Agenda Date: May 10, 2009 Authors:
Doc.: IEEE /0393r1 Submission March 2008 Eldad Perahia (Intel)Slide 1 Orlando Liaison Report Date: Authors:
Doc.: IEEE / Submission March 2013 Juho Pirskanen, Renesas Mobile CorporationSlide 1 Discussion On Basic Technical Aspects for HEW Date:
Channel Access in A-BFT over Multiple Channels
Doc.: IEEE /1506r2 Submission January 2014 Osama Aboul-Magd (Huawei Technologies)Slide 1 HEW SG January 2014 Meeting Agenda Date: Authors:
Doc.: IEEE /1583r1 Submission November 2011 Osama Aboul-Magd (Huawei Technologies)Slide 1 TGac November 2011 Closing Report Date: Authors:
Doc.: IEEE /0400r0 SubmissionZander Lei, I2R SingaporeSlide 1 ACK Transmission Date: Authors: March 2012.
Doc.: IEEE /1468r1 Submission July 2013 Adrian Stephens, Intel CorporationSlide November 2013 Motions to 802 EC Date: Authors:
Doc.: IEEE /0616r0 Submission May 2013 Phillip Barber (Huawei Technologies)Slide 1 HEW Project Plan Discussion Date: Authors:
Doc.: IEEE /0548r2 Submission May 2013 Rolf de Vegt, QualcommSlide 1 Strawpolls Regarding HEW Study Group Leadership Structure Date:
A Proposed Timeline for IEEE ba TG
AP discovery with FILS beacon
TGax March 2017 Closing Report
On High Efficiency WLAN (HEW) TG PAR Scope
PAD SG Closing Report Date: Authors: September 2012
PAD SG Closing Report Date: Authors: November 2012
PAD SG Closing Report Date: Authors: November 2012
Avoiding duplicated queries in 11aq
HEW Study Group Documentation
Closing Plenary Meeting Report for SG 100G Group (1/3)
Raising the PAR Date: Authors: January 2014 January 2014
Snapshot Slide for TGbc
May Liaison Report Date: Authors: May 2009
IEEE TGaf Los Angeles Opening Report
Taipei Liaison Report Date: Authors: January 2008
TGac Status and Timeline
ISD SG Closing Report Date: Authors: March 2012 March 2012
Raising the PAR Date: Authors: January 2014 January 2014
TGs LA Closing Report Date: Author: January 2011
802.11bd Timeline Date: Authors: January 2019
IEEE TGaf Los Angeles Closing Report
VHT SG November 2008 Closing Report
MArch 2019 doc.: IEEE /r0 March 2019
TGba January 2018 Closing Report
Timeline for the Light Communications TG
2019 March TGba Closing Report
TGba November 2017 Closing Report
Wake-up Radio (WUR) SG July 2016 Closing Report
March 2019 doc.: IEEE /r1 March 2019
EHT SG formation Motion
TGax September 2017 Closing Report
Task Group BA - January 2017 Since the last (November) F2F meeting
ISG SG Closing Report Date: Authors: January 2012
Management Frame Priority SG Input
EHT SG formation Motion
IEEE aj March Closing Report
BCS SG Closing Report Date: Authors: September 2018
TGax November 2017 Closing Report
Presentation transcript:

Submission doc.: IEEE 11-13/1493r0 December 2013 Osama Aboul-Magd (Huawei Technologies)Slide 1 HEW SG Straw Polls Results Date: Authors:

Submission doc.: IEEE 11-13/1493r0 December 2013 Osama Aboul-Magd (Huawei Technologies)Slide 2 Abstract This submission summarizes the results of the HEW straw polls and provides a detailed SG timeline

Submission doc.: IEEE 11-13/1493r0December 2013 Osama Aboul-Magd (Huawei Technologies) Slide 3 SP #1 What type of PAR do you prefer? (choose one) 1. Qualitative PAR that includes words like “improve”, “higher”, “better”, etc. 2. Quantitative PAR that includes words like “x times improvement”. Etc. Majority is for quantitative PAR How to find the percentage improvement in metric(s) of interest?

Submission doc.: IEEE 11-13/1493r0 SP #2 Slide 4Osama Aboul-Magd (Huawei Technologies) December 2013 How many performance metrics should be included in the PAR scope? (choose one) 1. One metric 2. Two metrics 3. More than two metrics

Submission doc.: IEEE 11-13/1493r0 SP #3 If one performance metric, which metric should be included in the PAR scope? (choose one) 1. Link throughput (bps) 2. Area throughput (bps/m2) 3. Per STA throughput (bps) 4. Frame delay (msec) 5. Frame delay variations (jitter) (msec) 6. Power efficiency Slide 5Osama Aboul-Magd (Huawei Technologies) December 2013 Clear preference of per STA throughput and are throughput as performance metrics Both metrics are dependant on each other

Submission doc.: IEEE 11-13/1493r0December 2013 Osama Aboul-Magd (Huawei Technologies)Slide 6 SP #4 If more than one metric, which metrics should be included in the PAR scope? (Choose more than one) 1. Link throughput (bps) 2. Area throughput (bps/m2) 3. Per STA throughput (bps) 4. Frame delay (msec) 5. Frame delay variations (jitter) (msec) 1. Power efficiency The result is consistent with SP #3 result

Submission doc.: IEEE 11-13/1493r0 Detailed Timeline Slide 7Osama Aboul-Magd (Huawei Technologies) December 2013 DecJanFebMarch Dec 4 Telecon Dec 18 Telecon January Meeting Jan Reach consensus on PAR March Meeting March IEEE 802 EC Meeting Deadline for the PAR To be on the EC Agenda PAR Editing IEEE 802 WGs comments HEW Tutorial TG in May/July

Submission doc.: IEEE 11-13/1493r0 References Slide 8Osama Aboul-Magd (Huawei Technologies) December 2013