Presentation is loading. Please wait.

Presentation is loading. Please wait.

Closing Plenary Meeting Report for SG 100G Group (1/3)

Similar presentations


Presentation on theme: "Closing Plenary Meeting Report for SG 100G Group (1/3)"— Presentation transcript:

1 Closing Plenary Meeting Report for SG 100G Group (1/3)
September 2013 Closing Plenary Meeting Report for SG 100G Group (1/3) Meeting was called to order at 8.05 am on September 17 and finished at September 19 at am. Number of meetings: 4 Total number of attendees :14 Total number of contributions: 4 Contributions on Tuesday AM1 Contribution #1 : Thomas Kürner, TU Braunschweig (Germany), SG Inauguration/Tasks of SG; (Document thz) Contribution #2 : Cai Yunlong, Huawei (China) ,“Data Center Traffic Characteristics and 100Gb/s Demand”; (Document thz) Contribution #3 : Rick Roberts, Intel (USA), A Terse Protocol Layer Tutorial; (Document thz) Thomas Kürner, TU Braunschweig

2 doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> September 2013 Closing Plenary Meeting Report for SG 100G Group (23) Contributions on Tuesday AM2 Contribution #4 : Rick Roberts, Intel (USA), “Suggested draft text for SG 100G PAR and 5C “; (Document thz) Tasks completed during the meeting: SG Leadership has been completed: Chair: Thomas Kürner (TU Braunschweig) – already appointed at July Plenary Vice-Chair: Iwao Hosako (NICT) – Straw Poll 9 yes/0 no /1 abstain Secretary: Cai Yunlong (Huawei) – Straw Poll 10 yes / 0 no / 0 abstain Technical Editor: Rick Roberts (Intel) – Straw Poll 10 yes / 0 no / 0 abstain Press Release on the formation of the new study group has been discussed. Initial Working Draft for PAR and 5C have been created (Documents thz and thz, supporting Document thz,) Work on the Technical Expectation Document (TED)“. The content of the TED has been discussed and updated (Document thz) Thomas Kürner, TU Braunschweig <author>, <company>

3 doc.: IEEE 802.15-<doc#>
<month year> doc.: IEEE <doc#> September 2013 Closing Plenary Meeting Report for SG 100G Group (3/3) Tentative Timeline for the SG November 2013 Plenary: 1st joint meeting with 802.1 January 2014 Interim: 2nd joint meeting 802.1 Finishing complete draft PAR and 5C ready for WG approval and submission to EC March 2014 Plenary: Adressing comments and getting PAR and 5C done May 2014 Interim Potential Kick-off of a Task Group Thomas Kürner, TU Braunschweig <author>, <company>


Download ppt "Closing Plenary Meeting Report for SG 100G Group (1/3)"

Similar presentations


Ads by Google