MI/RR Status January 3, 2014 D. Capista. MI Preformance.

Slides:



Advertisements
Similar presentations
First Operation of MI8 Collimation Bruce C. Brown All Experimenters Meeting 22 January 2007.
Advertisements

Main Injector Gap clearing kickers Phil Adamson (#) AEM 14th March 2011.
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
AGS pp Status Feb. 6, 2015 RSC Meeting Haixin Huang.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Re-commissioning the Recycler Storage Ring at Fermilab Martin Murphy, Fermilab Presented August 10, 2012 at SLAC National Laboratory for the Workshop on.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Proton Plan Director’s Review 8/15/06 Prebys 2006 Shutdown Eric Prebys, FNAL Accelerator Division.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
RHIC Status Haixin Huang Time Meeting 01/18/2011.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
F All Experimenters' Mtg - 28 Jul 03 Week in Review: 07/21/03 –07/28/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
RR Barrier bkt Chandra, Bob and Ming-Jen MI  RR Injection Phase and Energy Mismatch: Measurements using W24 Chandra Bhat, Bob West & Ming-Jen MI Group.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Run II Operational Status and Plans Run II Meeting October 28, 2004 Dave McGinnis.
RHIC Run14 Time Meeting. Run14 Status – Apr. 15 Operations running well, 12 stores over the past 7 days with 1 lost to another “super quench”. Testing.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
RHIC Run14 Time Meeting. Run14 Status – Apr. 22 Operations running well, 12 stores over the past 7 days with 1 “super store” of 17 hours. Repositioned.
Proposal for LHC Microwave Schottky Pickups Ralph J. Pasquinelli 3/9/2005.
Accelerator Issues Fermilab Antiproton Experiment Keith Gollwitzer Antiproton Source Department Accelerator Division Fermilab.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
AGS/Booster PP Setup Status Feb. 5, 2013 Time Meeting Haixin/Vincent.
Recent Work Towards Increasing the AP2 & Debuncher Aperture – Keith Gollwitzer – May 9, Recent Work Towards Increasing the AP2 & Debuncher Aperture.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Booster Losses Keith Gollwitzer PIP and MI 700 kW review January 2015.
Antiproton Acceptance Keith Gollwitzer Dept. of Energy Review March 30, 2005.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
July 15, 2013 Photo by Greg Vogel. Shutdown Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster.
All Experimenters’ Meeting September 23, Accelerator Operation Summary Calendar Week # 38 NuMI Weekly Integrated Intensity 4.57 E18 protons BNB.
F Possible Proton Capabilities at Fermilab Dave McGinnis April 16, 2007.
August 12, Machine Status: 2013  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac : Roof hatch installed Booster : Magnet.
F All Experimenters' Mtg - 6 Jan 03 Week in Review: 12/30/02 –1/05/03 Ron Moore – FNAL Store Summary – Best week! > 7 pb -1 Machine Studies/Maintenance.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
All Experimenters’ Meeting November 25, 2013 Photo by Martin Murphy.
Run 10 Start-up Status
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
All Experimenters’ Meeting November 4, Accelerator Operation Summary Calendar Week # 44 NuMI Weekly Integrated Intensity 5.97 E18 protons BNB.
July 29, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Trying to.
MI/RR Operation Status Ioanis Kourbanis August 21, 2014.
Summary of Working Group 3: Rings Ioanis Kourbanis and Valeri Lebedev PIP-II Collaboration Meeting 9-10 November 2015.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Slip stacking in Recycler Ioanis Kourbanis 9/14/11.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
Maximum Credible Beam Loss in the Main Injector D. Capista January 26, 2012.
Weekly Pbar Report 10/26 → 11/2. Stacking This Week …
Proton Economics Eric Prebys FNAL Accelerator Division.
TBT Data & Lattice Measurement for Recycler Ming-Jen Yang December 17, 2014.
Proton PMG May 7 th 2015 Cons Gattuso AD Shutdown Manager.
Pre-Meeting Meeting Brian Drendel Accelerator Shift Plot.
Operation Status of the RF Systems and Taiwan Photon Source
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
Presentation transcript:

MI/RR Status January 3, 2014 D. Capista

MI Preformance

Recycler Status Injected 6 Booster batches and cleanly transferred to MI Slip Stacked 2 Booster batched and transferred to MI Calibrated tune, chromaticity, tune intensity offsets, and injection closure Commissioned LLRF and HLRF Commissioned available instrumentation Many aperture scans

MI Operating point Change (SY120) Design Current  This change requires a retune of MI and Switchyard  Currently we do not have instrumentation to measure extraction efficiency from MI to the P1 line  The first instrumentation that can see the extracted beam is at F49

Operating Point Chance to RR Energy  A RF frequency change of -1Khz (or ~ -19Mev)  Will shift the tunes by ~ +.06 (currently the base tune is.38h.34v)  Change will require a retune of Booster, MI8, MI, RR, and BooNE

Recycler Beam Scrubbing So far Vacuum has recovered Concerns of depleting TSPs, some vacuums sectors only have ~15 fires left

RR MI30 Lambertson Circulating Extracted Need to replace the Lambertson flanges and beam box to increase circulating aperture Lambertson PS need to support ~ 750A Need a different power supply Need more cable or need to ramp PS

Tunnel Access (next) MI Vacuum at MI605 Recycler Vertical IPM installation Alignment Inspections for future jobs Everything else