DEVELOPING A STATUS REPORT: A HYPOTHETICAL EXAMPLE Tong Wang P463-468, Chapter 13 Process and performance Measurement and Evaluation, Project Management.

Slides:



Advertisements
Similar presentations
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
Advertisements

© The McGraw-Hill Companies, Software Project Management 4th Edition Monitoring and control Chapter 9.
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Monitoring and Controlling
Project Evaluation and Control
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Project Management Chapter 3 BUSI 2106 – Operations Management.
Microsoft Office Project 2007: Managing Projects.
Project Evaluation and Control Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Project Evaluation and Control
Project Management 6e..
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Management Methodology Project monitoring and control.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 13: Progress and Performance Measurement and Evaluation
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall13-1 Project Evaluation and Control Project Termination and Closeout Chapter
12-1 ELC 347 project management Week Agenda Integrative Project –5 th part corrected Feed back sent –IP part 6 Due (will be corrected and returned.
PROJECT BUDGETING The overall goal in the budgeting process of a project is to determine how much money is to be spent each week or each month. PERT /
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Project Management Part 6 Project Control. Part 6 - Project Control2 Topic Outline: Project Control Project control steps Measuring and monitoring system.
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Day 23.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall13-1 Project Evaluation and Control Chapter 13.
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
Project Management 6e..
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
Using MS-Project INFS MS-Project: 3 Major Parts 1. Project Planning 2. Project Execution & Tracking 3. Project Reporting.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Developing the schedule – Tracking Gantt charts Critical path method – Longest path, earliest time Schedule trade-offs using CPM – Free slack, total slack.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
TOPIC-8B- PROJECT COST CONTROL
PROJECT MANAGEMENT AND CONTROL
CHAPTER:7 Project Cost Management
Project Planning & Scheduling
Project Communication, Tracking, and Reporting
Project evaluation and control
5. Cost resources & PLAN DURATION
Progress and Performance Measurement and Evaluation
Project Planning & Scheduling
Project Management 9. Performance Management
Progress and Performance Measurement and Evaluation
Chapter 6: Project Time Management
Monitoring and Reporting Project Progress
ENGINEERING MANAGEMENT (GE 404)
In this tutorial you will:
Project Evaluation and Control
5. Cost resources & PLAN DURATION
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
5. Project PLAN & cost estimation
MS Project Add-on for Earned Value Analysis Reporting
Fine-Tuning your plan and obtaining approval
Exercise – A small building.
Project Management Life Cycle
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Monitoring and Controlling
Managing Project Work, Scope, Schedules, and Cost
Project Evaluation and Control
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Presentation transcript:

DEVELOPING A STATUS REPORT: A HYPOTHETICAL EXAMPLE Tong Wang P , Chapter 13 Process and performance Measurement and Evaluation, Project Management Fifth Edition, McGraw-Hill 2011.

Assumptions Assume each cost account has only one work package, and each cost account will be represented as an activity in the network. The project network EST will serve as the basis for assigning the baseline values. From the moment work on a activity begins, some actual costs will be incurred each period until the activity is completed. How to add cost factor to network

Baseline Development From the figure13.6, there are six deliverables in the project and five departments in the firm. Plan Value (cost account) = $320,000. From the Gantt chart (Figure 13.7), we can write down the network chart. And we can find this planning schedule is according to the early start time planning. 11 here is the minimum duration of the critical path.

Baseline Development AC B D E F end start

Baseline Development For example activity A, Design and Specifications, is planned to finish by Department of Design to finish in the first two weeks with the cost of $20,000. So activity (PV, DUR, ES, LF, SL) is known now. (Schedule information of figure 13.8)

Baseline Development Another kind of information we need is Baseline budget needs in each time period with this early start Baseline. (Baseline Budget of Figure 13.8) They are assigned as managers plan to monitor and measure schedule and cost performance.

Development of Status Report Work packages are in one of three conditions on a report date (Not-started, Finished, In-process). We use EV to measure schedule and cost performance.

Development of Status Report EV= Total PV *percentage of complement budgeted cost of work performed CV=EV-AC(cumulative cost) Budgeted cost minus actual cost with the same work performance. SV=EV-PV (cumulative cost) Work performed minus work scheduled with the same cost, not the same time. It is possible to have negative SV, when the activity in ahead on the critical path.

Development of Status Report For each period, we can calculate the EV, CV, and SV. (Table 13.2) By period 7, Tasks A, B, D are finished, but all are over budget. Task C is 90% complete. Task E is late and hasn’t started because Task C is delayed. At the end of period 7, the project is over budget $70,000 (CV=-70), with a schedule budget over $40,000 (SV=-40).

Development of Status Report Next we should give the Tracking Gantt bar Chart, which could give accurate assessment of schedule performance. (Figure 13.10) Activity B, C, and D are delayed. The delay of 2weeks of Task C will delay Tasks E and F, and result in the project being late in 2 weeks.

Development of Status Report We could also give a project rollup at the end of period 7 by deliverables and organization unites.(Figure 13.11) Each responsible department should give an explanation for these variances.

Summary 1. Assumption 2. Baseline Development Scheduling Planed Value 3. Status Report Actual Cost, Percentage of Complement, Earned Value, Schedule Variance, Cost Variance Gantt Bar Chart Project Rollup