Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

J.P. Langston Brake Retrofit
Build Your Own Future RC2 Serviceability. Build Your Own Future Safety and Ground Rules Before servicing, always remove A/C power from the unit and disconnect.
CHAPTER 45 Engine Lubrication.
NORTH POWERED AIR-PURIFYING RESPITATOR (PAPR) INSTRUCTIONS FOR USE Preventive Medicine Industrial Hygiene Service.
Instructions for making plunger fork tool. Drawing for the trigger assembly.
Step-by-step assembly instructions
Manual Flo-tap Installation Instructions
Compression Fittings Internal nut type. Compression fittings Rugged and durable. Firm joint using all brass construction For use with plastic and metal.
Frame Assembly Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team
Optical Manufacturing Solutions 1 Probe Assembly.
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
Here is the broken line. Step 5: Break loose encasing seal. With bar in vice as show, hit with hammer to break loose. Usually 2 or 3 hits will break loose.
Installation. Indoor Unit Installation Typical Installation.
ZIPP 404 BEARING REPLACMENT GUIDE Tools Needed:
Click on this image to open the full PDF document.
Flange-lok Installation Instructions Quick Installation Guide rev. DB.
Lucas Air Mass Meter Stripdown sequence and technical information.
Volvo 270 Outdrive R&R (for bellows replacement)
Yamaha oil pump rebuild
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
Step-by-step assembly instructions
MyLock 644D Service Seminar.
Engineer Training Inkjet Head Cleaning TJ8300 / TJ8500 Inkjet Head Cleaning.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
MINI BOX. STANDARD BOX MAGNUM BOX SPINDLE ASSEMBLY.
Cleaning of the Optical Block, Critical Orifice, and Focusing Nozzle of the Brechtel Model 1710 Mixing CPC.
Inside-, Depth-, and Height-Measuring Instruments
Hydraulic Digger Step-by-step assembly instructions (c) 2013 Mechanical Kits Ltd.1.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
Pneumatic Arm Assembly Instructions
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Specification section 3.3
External nut type series 43
Bacteriological Sampling Ken Morin, P.E. (based on slides prepared by: Bob Clement, EPA Region 8)
L.C. Technology ROBOT ASSEMBLY. Base Assembly BASE File off raised tabs on each side of Servo. Place Servo in vice between Fibre Clamps. Raised Tabs Repeat.
清华阳光 TSINGHUA SOLAR JB Series Solar Water Heater Assembly Manual Tsinghua Solar Ltd. Yangfang County, Changping District, Beijing, , China Tele:
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Manufacturing Assembly Plan P Mechanical Spine Test Platform.
Installation. Indoor Unit Installation Typical Installation.
How to Replace Your Desktop PC’s Power Supply Computer Based Training Objectives.
MC11000 Kit Replacement 1 1. Open the face plate and remove the 2 screws. Remove and discard the original face plate. 3. Remove the 2 white caps on the.
Installation. Indoor Unit Installation Typical Installation.
Lifter Step-by-step assembly instructions (c) 2010 National Fluid Power Association.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
LSM780 Live Cell Turn On/Turn Off Instructions Kim Peifley 07/13/15.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
Grapple Housing Top Sub Grapple Collet Seal Housing Bottom Sub Seal Housing Metal Seal Ring.
Adding to your Diagnostic Station Adding thermometry The temperature module attaches to the top of the BP module. It is made up of the following two.
Setting up correctly Different types and their use
Installing Hinges Created By M.Martin 9/05. Mark the hinge position on the door edge 150mm from the top of the door and 225mm from the bottom of the door.
Level 1 Diploma in Electrical Installation © 2014 City and Guilds of London Institute. All rights reserved. 1 of 13 PowerPoint presentation Stripping and.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
AVIVA™ ELECTRIC BIKES VIPER ASSEMBLY INSTRUCTIONS Aviva™ - For A New Way Of Life.
EnviroSCAN Flat Cap Probe Assembly, Normalisation & Installation Version 1.3 (01/03/2012)
Access Tube Installation for Diviner 2000 & EnviroSCAN
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
Installation Walkthrough Image Guide
Scorpion is a remote tester specifically designed for testing ASD systems. Scorpion is compatible with the FAAST aspirating smoke detector. It is particularly.
Bilge Pump Service Project Model Service Kit
Step-by-step assembly instructions
Step-by-step assembly instructions
Disassembly and Assembly of A07A-W1/W2 Electronic Governor Actuator for AD Fuel Injection Pump
Step-by-step assembly instructions
Step-by-Step Assembly Instructions – Cube Version
Step-by-step assembly instructions
Step-by-step assembly instructions
Presentation transcript:

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Sentek Sensor Technologies Installation of EasyAG 50 and EasyAG 80

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Items required for EasyAG Installation : EasyAG 50 or EasyAG 80 probe complete Soil sampling auger EasyAG installation kit -Stabilization plate -Polyguide -Long pins -Short pins -Dolley -Dolley rubber

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Normalizing the EasyAG ® probe 1.Connect to the logger with your PC and set up a new database or edit an existing database using the EnviroSCAN ® software (refer to Software Manual) 2.Connect to the logger with your PC and set up a new database or edit an existing database using the EnviroSCAN ® software (refer to Software Manual)

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Normalizing the EasyAG ® probe 3.Hold the EasyAG ® probe out in free air by the top cap to obtain air counts 4.Place the EasyAG ® probe in a large container full of water (at least 15 cm or 6 inch diameter of water around access tube at all sensor depths) to obtain water counts

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Assembling the stabilization brace 1.The stabilization brace can be used on flat ground and raised soil beds 2.Select the short stabilization brace pins for flat ground and long stabilization brace pins for raised beds Long pins Short pins

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Fixing the stabilization brace on flat ground 1.Place stabilization brace on ground 2.Insert short stabilization brace pins through the holes in the stabilization brace 3.Drive the stabilization brace pins all the way into the ground 4.Put the soil sampler polyguide in place

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Fixing the stabilization brace on raised soil beds 1.Insert the long stabilization brace pins into the holes in the stabilization brace 2.Tighten wing nuts with light finger pressure 3.Place assembled stabilization brace on the ground directly above the required position of the probe

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd 4.Apply gentle pressure directly onto stabilization brace to force pins into ground 5.Using sledgehammer alternately beat hitting points on stabilization brace to force it closer to ground 6.The stabilization brace should be firm to the ground without causing significant soil compression

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd 7.Insert the soil sampler polyguide

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Preparing the hole: 1.Insert the AMS™ soil sampler and force downward in a single smooth action 2.Use a sledgehammer to beat the AMS™ soil sampler until the base of the head protrudes by 25 cm for the EasyAG 50, or until the base of the head touches the stabilization plate for the EasyAG 80

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Preparing the hole: 3.Turn the AMS™ soil sampler one complete rotation 4.Carefully lift the AMS™ soil sampler directly out of the ground NOTE: If you experience difficulties at this point, remove the soil sampler in stages or obtain extra assistance to avoid back injury

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Assembling the EasyAG ® probe: Attach the cutting tip to the base of the probe with firm pressure. No glue is required

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Inserting the access tube: 2.Insert the probe into the stabilization brace and push into the ground in a single gentle movement 3.As the probe enters the prepared hole, it shaves off a residue that is eventually stored in the cutting tip at the base of the hole 1.Remove the lid of the top cap and extract the electronics. Place electronics to one side. Feed cable through FairRite Bead an cable gland into top cap.

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Inserting the access tube: 4.Place the dolly rubber onto the dolly, insert the EasyAG ® dolly into the top cap and position it on top of the internal access tube. Position the dolly rubber inside the top cap to hold the dolly firmly in place. 5.Continue to insert probe using a sledgehammer to hit on the dolly until there is a 2.5 cm (1 inch) gap between the base of top cap and edge of the stabilization brace tube guide

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Inserting the access tube: 6.Remove all of the stabilization brace wing nuts and remove the stabilization brace pins 7.Separate both halves of the stabilization brace and remove

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Inserting the access tube: 8.Continue tapping the EasyAG ® dolly with the sledgehammer until the base of the top cap is level with the ground NOTE: This will place the top sensor 10 cm (3.9 inches) below the ground surface

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Inserting the electronics: 1.Re-install the sensor circuitry and attach the connector or attach wiring as required 2.Tighten the cable gland and seal around the inside threaded section with silicone glue

Sentek Training Presentation © 2003 All rights reserved Sentek Pty Ltd Fitting the top cap lid: 1.Replace the lid of the top cap 2.Ensure that the sealing gasket is in good condition and positioned correctly 3.Tighten screws completely to ensure an effective seal