GROUP CAPITAL DIVISION Majuba Rail Project Clarification Meeting Boreholes Health and Safety Insert image here Lebo Ramoleko Date: 05 May 2016 Time: 10h00.

Slides:



Advertisements
Similar presentations
Safety Absolutes Green Lake
Advertisements

Managing the Health and Safety of Contractors
Background Presenters Work done in preparation for WHS changes
Health and Safety Committees RENZO BERTOLINI Canadian Centre for Occupational Health and Safety.
Ship Repair & Maintenance Occupational Health & Safety
Health and Safety - an update Ian Gillett Safety Director.
Employee Training February 12, Training Agenda Injury & Illness Prevention Program (IIPP) Ergonomics.
Contractor Safety Management
Contractor Induction Program Gippsland Southern Health Service is committed to a safe and healthy work environment.
Participant Challenge Pilot Program Participant Stage One Assess, Learn and Develop.
Cal/OSHA PSM Unit Activities in 2014 and a look at 2015
Health and safety at work
Safety and Health Programs
WHS Management Plans.
OH&S Management System
Occupational Health and Safety
THE NATIONAL SITUATION ON THE HEALTHAND THE SAFETY AT WORK in Poland prepared by: Małgorzata Żydło Danmar Computers.
Basics of OHSAS Occupational Health & Safety Management System
Rev:01 Visitor Induction Rail Health, Safety & Environmental “Name of Project” 1.
K RIEL C OLLIERY Anglo Coal Contractor Management.
Workplace Inspections by the Joint Occupational, Safety & Health (JOSH) Committee LIBRARY OF CONGRESS.
1 EMILIA ZAMFIRACHE HEAD OF OFFICE LABOUR INSPECTION EMPLOYER’S GUIDE FOR REDUCING EXPOSURE TO HAZARDOUS CHEMICAL AGENTS AT THE WORK PLACE.
Construction HSE Guideline _ 2005
The OSH Act, Standards, & Liabilities
Health and Safety Policy
Main contractor name – LTI# - Date of incident 1 Non Accidental Death Name of Company Date of Incident 1.
CONTRACTOR MANAGEMENT AT XSTRATA COAL. INDEX Location of sites Employees vs. Contractors Contractor selection phase Pre-engagement operational phase Engagement.
Prime Responsibility for Radiation Safety
IAEA International Atomic Energy Agency School of Drafting Regulations – November 2014 Government and Regulatory Body Functions and Responsibilities IAEA.
Program Implementation MM.DD.YY. To comply with the OHSA and regulations To demonstrate management's commitment to health and safety To show employees.
FINAL RULE 30 CFR PART 46 Training and Retraining of Miners Engaged in Shell Dredging or Employed at Sand, Gravel, Surface Stone, Surface Clay, Colloidal.
SEC 420 Entire Course (UOP) For more course tutorials visit  SEC 420 Week 1 Individual Assignment Responsibilities of Personal Protection.
Contractor Health & Safety Requirements Project :GSU Transformer System Date: 16 May 2014 A Stuart SHEQ Manager – Gx Coal 2.
13/01/2015 ANKERLIG & GOURIKWA POWER STATION STATION OCGT Tender Presented by Obert Mgwenya.
1 SHE Requirements Presented by : Diane Maunatlala SS: COHS.
SHEQ presentation Date 9 July SCOPE This applies to all contractors acquiring to conduct meter reading, disconnecting and reconnection work throughout.
ESKOM VEHICLE SAFETY SPECIFICATION Title: Eskom Vehicle Safety Specification Document Unique Identifier: (Revision 2) Effective date: April 2014.
Safety Audits An essential tool for active safety management April 2015 Dr Emer Bell Integrated Risk Solutions.
Environmental Requirements for Supply of inline Gas Filters on GIS balancing pipe Compiled by: Silindile Mbhele.
PROVISION OF FIT FOR PURPOSE GUARDING SERVICES AT MAJUBA RAIL PROJECT.
Adding value through health and safety. Introduction to Portakabin Part of the Shepherd Group - a family company with family values Cares for employees;
GROUP CAPITAL DIVISION Majuba Rail Project Clarification meeting Insert image here Marcel Meso Date: 04 Feb 2016 Time: 09h30 Venue: UCG.
PESH Update.
POWER DELIVERY PROJECTS Central Grids Simmerpan - Civil works. 10 July 2015 Vusi Mthimunye.
Safety Management Systems Session Four Safety Promotion APTA Webinar June 9, 2016.
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
Environmental Requirements for North West Grid Floodlight Project Compiled by: Silindile Mbhele.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
CAR WASH SHE PRESENTATION 19 September SHE Document for Evaluation SHE Policy signed by CEO SHE Plan aligned to Kusile SHE Specification and mostly.
GROUP CAPITAL DIVISION Majuba Rail Project Pre-Bid Horticulture and Maintenance Contract Health and Safety Presentation Insert image here Lux Mphela.
OH&S Management System
We always have time to work safely
Occupational Health and Safety Critical Injury Training
Health and Safety Policy
Safety Accountabilities
OH&S Management System
Risk management - HIRAC awareness presentation
People Responsible For Health and Safety
Life Saving Rules-Do it Right!
Contractor Control system
Contractor Control system
Roadmap to COR.
Oleh : Ir. Sjaifuddin Thahir, MSc.
Contractor Control system
Prevention through planning, control and monitoring Harold Chinogurei
CONTRACTOR MANAGEMENT AT XSTRATA COAL
Registration Policy and Practice First Aid Forward
Ensure safety devices are working prior to starting work
Contractor stand-down Western Region 2018
Presentation transcript:

GROUP CAPITAL DIVISION Majuba Rail Project Clarification Meeting Boreholes Health and Safety Insert image here Lebo Ramoleko Date: 05 May 2016 Time: 10h00 – 12h00 Venue: MRP UCG Hall

PURPOSE 1.To ensure the Health and Safety of all project participants 2. It incorporates the minimum requirements of: Occupational Health and Safety Act, Project specific requirements, and Best practices 3.Compliance to this is mandatory for the project participants 4.All Principal Contractor must be aligned to OSHAS 18001: 2007 requirements 5.Each contractor must make resources available for management of health and safety 05 May 20162

LIFE-SAVING RULES 05 May 20163

Occupational Hygiene programme All contractor must develop occupational hygiene programme to deal with occupational stressors in the workplace The contractors must conduct occupational hygiene monitoring and measurement for the work stressors and develop action plan on how to address those stressors. Ensure that medical surveillance is carried out to all employees. 05 May 20164

RESPONSIBILITIES Health and Safety – joint responsibility of management and employees Each position has defined responsibilities for the management of safety and integrity issues Safety within the project is a particular responsibility of the line managers and supervisors. 05 May 20165

PLANING AND OBJECTIVE The contractor shall: a) Develop b)Implement and c)Administer a Safety, Health & Environmental Plan (SHE Plan). The plan shall be in writing and shall be submitted to the Majuba SHE department. SHE Plan must complement Majuba Rail Project Safety Operational Plan and all applicable Eskom Safety Level 1 procedures The plan shall demonstrate management's commitment to safety. Contractor must align their safety procedures to MRP SHE Specification, Eskom Level 1 procedures and legal requirements. Contractors to develop Health risk assessment and baseline risk assessment inline with their scope of work 05 May 20166

VEHICLE AND EQUIPMENT INTEGRITY Contractor shall ensure that all equipment, power and hand tools brought onto the site by the contractor or sub-contractors are: Inspected by Majuba Rail Project health and safety department prior to mobilizing it to site Appropriate for the type of work to be performed Approve, inspected, tested, numbered and tagged in accordance with occupational health & safety Statutory regulation and etc. No employee must be transported at the back of LDV’s, unless those LDV’s fixed seats, safety belts, roller bars and be approved by the SABS for such purpose. 22 April 20167

INDUCTION TRAINING MRP Induction – Everyone (Eskom employees, Contractors and sub- contractors) prior to commencing work on site. Before commencing work: Majuba Rail SHE Induction Contractors’ Site Induction Proof of Man-job specific induction signed by inductor and employee must be submitted at the induction centre before a badge will be issued Pre-Employment medical examination and fitness to work certificate to be submitted. Contractor has to make arrangement with a Registered Occupational Medical Practitioner around Ermelo and Volkstrust 05 May 20168

Emergency MRP will provide ambulances for emergency services to cater for all contractors during working hours It’s the responsibility of the contractor to provide first aiders (with level 2 training) and first aid boxes. Contractor must have their own Emergency plan which must be aligned to MRP Emergency Plan. 05 May 20169

INCIDENT MANAGEMENT Incidents must be managed according to Eskom Incident Management Procedure. In which all contractors must align their incident procedure with procedure. 05 May

Thank you Insert image here