Strategic Environmental Assessment Patrick White and Nelly Isyagi.

Slides:



Advertisements
Similar presentations
Strategic Environmental Assessment: Methodology Mary M. Matthews, Ph.D. SEA Consultant for European Delegation.
Advertisements

MODULE 1: Introduction to Environmental Assessment
Health impact assessment explained
Identify Problems, Planning Objectives and Constraints.
Presentation by Cambodian Participants Phuket, Thailand February 2012 Health Impact Assessment Royal Government of Cambodia.
Scoping in the EIA process Proposal Identification Screening
Strategic Environmental Assessment (SEA) Manual Environmental Protection Department H. M. Wong 18 June 2005.
ENVIRONMENTAL ASSESSMENT SEA Jamie Byfield SEA Technical Officer HRA & EIA Cara Davidson Policy Manager.
1 CEER How to balance the public’s concerns and critical infrastructure construction Matti Vainio, Deputy HoU DG ENV – C.5, European Commission.
Air Quality and Land Use Planning Land Use Consultants 11 th March 2008 Susanne Underwood.
EIAScreening5(Gajaseni, 2007) 1 EIA - Operating Principles.
AN INTRODUCTION TO STRATEGIC ENVIRONMENTAL ASSESSMENT
Capacity Enhancement for Air Quality Management John E. Hay Senior Advisor UNEP ROAP & IETC.
E nvironmental I mpact A ssessment Geog 456 – Spring 2008 Paul Fraser.
Marine Strategy Framework Directive Consultation on Good Environmental Status Descriptor 7 – Hydrographical Conditions Dr Alejandro Gallego Marine Scotland.
Deciding How To Apply NEPA Environmental Assessments Findings of No Significant Impact Environmental Impact Statements.
Presented by Utsala Shrestha, June 08, 2008 R-2007-COE-01 Department of Environmental science00.
INTEGRATED ASSESSMENT AND PLANNING FOR SUSTAINABLE DEVELOPMENT 1 Click to edit Master title style 1 Integrated Assessment and Planning for Sustainable.
Environmental Impact Assessment (EIA): Overview
Integrated Assessment and Planning
Objective- and Strategic Analysis
Energy Issues in Peru and the Andes: Environmental and Social Aspects George Washington University January 28, 2005 Dr. Robert H. Montgomery Head, Environmental.
UNEP Training Resource ManualTopic 15 Slide 1 Using EIA to move towards sustainability F EIA is a foundation tool F EIA is a tried and tested process F.
EIA: A framework for ESDM. EIA: A Framework for ESDM. Visit Defining EIA Environmentally Impact Assessment is A formal process for.
Performance Measurement and Analysis for Health Organizations
UNEP Training Resource Manual Topic 13 Slide 1 Aims and objectives of SIA are to: F analyse how proposals affect people F identify and mitigate adverse.
Wetlands and Poverty Reduction Project Anglophone regional practitioners training course MODULE 3 POLICY SETTING AND ADVOCACY By Teddy Tindamanyire, Isah.
UNEP Training Resource ManualTopic 1 Slide 1 Aims and objectives of EIA F modify and improve design F ensure efficient resource use F enhance social aspects.
PRESENTED BY: RAHIMA NJAIDI MJUMITA 3 RD APRIL 2012.
CHAPTER 1 FOUNDATION. 1.1 National Environmental Policy Act (NEPA) “An act to establish a national policy for the environment, to provide for the establishment.
1 Inter-American Development Bank Environment and Safeguards Policy - A Strategic Overview.
Strategic environmental assessment can help solve environmental impact assessment failures in developing countries Prof. Habib M. Alshuwaikhat.
Strategic Environmental Assessment – necessity, principles and specificities Monika Sabeva, University of National and World Economy, Sofia, Bulgaria
Integrated Assessment of Trade-Related Policies and Biological Diversity in the Agriculture Sector Introdution to Integrated Assessment Session 6 Geneva,
Gulana Hajiyeva Environmental Specialist World Bank Moscow Safeguards Training, May 30 – June 1, 2012.
UNEP Training Resource ManualTopic 2 Slide 1 The EIA process The EIA process comprises:  screening - to decide if and at what level EIA should be applied.
SECTION IV: GENERAL DESCRIPTION OF STEPS TAKEN OR ENVISAGED BY NON-ANNEX I PARTY TO IMPLEMENT THE CONVENTION Workshop on the Use of the Guidelines for.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
NEW APPROACH TO THE MEASUREMENT OF ENVIRONMENTAL IMPACTS: OBJECTIVITY AND REPLICABILITY Sofia Viegas, Portugal New Challenges in the European Area: Young.
Training Resource Manual on Integrated Assessment Session UNEP-UNCTAD CBTF Process of an Integrated Assessment Session 2.
Implementation and follow up Critically important but relatively neglected stages of EIA process Surveillance, monitoring, auditing, evaluation and other.
Policies and Procedures for Civil Society Participation in GEF Programme and Projects presented by GEF NGO Network ECW.
Mitigation and Impact management
Division of Technology, Industry, and Economics Economics and Trade Branch SESSION 7 - How to do Integrated Assessment Stage D: Issuing policy recommendations.
SEA in the Czech Republic Prague, 24 September 2008.
UNFCCC Workshop on the preparation of national communications from non-Annex I Parties General description of steps taken or envisaged by non-Annex I.
Environment and Disaster Planning Hari Srinivas, GDRC Rajib Shaw, Kyoto University Contents of the presentation: -What is the problem? -Precautionary Principles.
Program Evaluation Overview. Definitions of Program Evaluation systematic collection of information abut the activities, characteristics, and outcome.
Technology Needs Assessments under GEF Enabling Activities “Top Ups” UNFCCC/UNDP Expert Meeting on Methodologies for Technology Needs Assessments
UNEP EIA Training Resource ManualTopic 14Slide 1 What is SEA? F systematic, transparent process F instrument for decision-making F addresses environmental.
Linking SEA and City Development Strategy (CDS) in Vietnam Maria Rosário Partidário, Michael Paddon, Markus Eggenberger, Minh Chau, and Nguyen Van Duyen.
Sustainable Community EMS Design Including Pollution Prevention Michelle M. Wyman Reed Smith Shaw & McClay LLP EMS Models and Strategies: ISO & Beyond.
Pilot Project on implementation of SEA for regional planning in Ukraine Prof. Dr. Michael Schmidt Dmitry Palekhov Brandenburg University of Technology.
Stream A LEGISLATION AND POLICY report back. Main issuess Formal Aspects Experience and lessons learned Plans and visions for the future Actions.
LECTURE 2 EIA/EIS. Proposed Undertaking (> 10 hectares) Determine whether there are environmental, health and safety impacts Application for environmental.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Better regulation in the Commission Jonathon Stoodley Head of Unit C.1 Evaluation, Regulatory Fitness and Performance Secretariat General of the European.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Mitigation, Enhancement and Monitoring Session 9 Health in SEA.
Module 8 Guidelines for evaluating the SDGs through an equity focused and gender responsive lens: Overview Technical Assistance on Evaluating SDGs: Leave.
EIA approval process, Management plan and Monitoring
Business environment in the EU Prepared by Dr. Endre Domonkos (PhD)
ENVIRONMENTAL ASSESSMENT TOOLS
UK Marine Planning and the Ecosystem Based Approach
1.
Strategic Environmental Assessment (SEA)
EIA- Concept and Practice
© Fresh Thoughts Consulting
Presentation transcript:

Strategic Environmental Assessment Patrick White and Nelly Isyagi

Strategic Environmental Assessment (SEA) “A formalized, systematic, and comprehensive process for evaluating the environmental effects of a policy, plan or programme and its alternatives.” (Therivel et al., 1992)

What is SEA? SEA therefore encompasses procedures such as programmatic EA, regional EA, and sector EA. The core idea is that the collection of information relating to many actual or possible developments is used to inform a higher level strategic decision, in terms of management and mitigation measures for the sector, for a particular area, or in relation to a government program. The level at which SEA is undertaken is a key issue for more effective management of aquaculture development.

What is SEA? The strategic component of a SEA refers to the set of objectives, principles and policies that give shape to the vision and development intentions incorporated in a policy, plan or program SEAs deal with concepts and goals, not with particular activities SEAs aims to prevent unacceptable environmental damage

Lake Victoria May 2010 UTF/SAU/017 - Training

Distinction between SEA and Project-Level EIA SEA is broader in scope and used for strategic planning for development Project-level EIA addresses specific issues and impacts at specific locations SEAs do not replace project-level EIAs Project-level EIAs are necessary to provide detailed analysis

Promote sustainable development: By enhancing the integration of environmental concerns in policy and planning processes Address the limitations of Project EIA: Even when cumulative effects are incorporated in project- level assessments some potential impacts will likely be overlooked Need for SEA

Increases the level of scrutiny of environmental and social concerns (i.e., to a comparable level as economic, technological, and financial considerations) Provides an opportunity to proactively guide development in ways that are sustainable (e.g., incorporate sustainability considerations into upper levels of decision making, increases opportunities to affect projects) Assessment at the Policy Level

Provides an opportunity for genuine consideration of a broad range of alternatives which are often ignored or not feasible in project EIA (e.g., sites, technology, lifestyle choices, resource use) Improved analysis of cumulative, large-scale (i.e., regional, national and global), and non-project impacts (e.g., agricultural practices) Encourages consideration of environmental objectives within all government agencies (i.e., not just environmental departments)

Assessment at the Policy Level Facilitates and increases consultation between different government agencies Provides an opportunity to identify views of the public Strengthens project-level EIA (i.e., limitations are due primarily to the relative late stage in decision making at which EIA takes place when only limited consideration can be given to the need of the project and alternative possibilities, or to the cumulative effects of related actions)

Project-Level EIA and SEA EIA Is reactive to a development proposal Assesses the effect of a proposed development on the environment Addresses a specific project SEA Is proactive and informs development proposals Assesses the effect of the environment on development needs and opportunities Addresses area, regions or sectors of development

Project-Level EIA and SEA EIA Has a well-defined beginning and end Assesses direct impacts and benefits Focuses on the mitigation of impacts SEA Is a continuous process Assesses cumulative impacts and identifies implications for sustainable development Focuses on maintaining a chosen level of environmental quality

Project-Level EIA and SEA EIA Narrow perspective and a high level of detail Focus on project-specific impacts SEA Wide perspective and low level of detail Creates a vision and overall framework against which impacts and benefits can be measured

SEA occurs prior to project-level decision making SEAs are more variable in form and scope than project EIA wide range of strategic decisions to which SEA is applied from broad policies to specific plans SEA incorporates a greater scale of analysis (e.g., geographic area, environmental components considered, range of alternatives considered) General Differences

General Differences (Cont’d) Technical content and specificity are of lesser detail in a SEA Impact prediction uncertainties are greater for a SEA SEA may relate to geographical regions, industrial sectors or social issues Time scale is more variable in SEA (i.e., ranging from the immediate to the very long term)

Potential uses of SEA Identify proactive strategies for pursuing sustainable development - identify options and opportunities Assist in evaluating the need and feasibility of government initiatives and proposals Evaluate environmental issues and impacts associated with policies, plans and programs Establishing an appropriate context for project EIA, including the early identification of issues and impacts that warrant detailed examination

Application of SEA SEA can be applied to: Sectors (e.g., aquaculture, tourism) Geographic areas (e.g., land use or development plans at various scales - local, regional, national, international and global) Actions that do not give rise to projects but that may result in significant environmental impact (e.g., new technologies, privatization, aquacultural practices)

Application of SEA SEA occurs at all different scales from local regional global Different scales address different types of impacts (e.g., international-level SEAs focus on global issues while local SEAs address local issues) All SEAs address cumulative impacts Most common application of SEA has been the assessment of environmental impacts of land use plans at the municipal and regional level

SEA as a Tool For Environmental Planning Define goals and criteria Examine land/water-use trends for problems and ‘hot- spots’ Develop future scenarios Predict likely effects Evaluate impacts and value of alternatives Modify alternative goals with new constraints

Linkage between Environmental Planning and SEA Environmental Planning Objectives & Targets Actions (Strategies, Plans, Policies, Program) Monitoring & Evaluation Identification of Priority Issues Evaluation of Options and Alternatives Assessment of Cumulative Effects SEA

Requirements for effective SEA systems Political commitment and organizational support Clear provisions and requirements Use of appropriate methods Mechanisms for overview and monitoring, compliance and performance Follow-up and feedback capability

General Steps 1. Baseline study 2. Screening/scoping 3. Establish environmental indicators 4. Identify options 5. Impact analysis 6. Monitoring and follow-up

Baseline Study Identify the current state of the environment: Identify issues and concerns Establish a benchmark to evaluate impacts (i.e., the difference in the status of the environment with and without the project or activity)

Screening Simple procedure to initiate SEA or exempt proposals from further consideration Techniques: category lists, case-by-case evaluation, combination

Scoping Probably the most crucial step in ensuring that the SEA is feasible and useful Identify key environmental issues that will influence decision making and how they will be appraised

Scoping (Cont’d) Considerably more complex than for project-level EIA: because policy, plan or programs involve multiple activities, they are likely to have greater and more diverse impacts over a larger area be subject to more legislation and policies open to wider range of alternatives

Scoping Techniques Checklists Survey, case comparison Effects networks Public or expert consultation

Establish Environmental Indicators Indicators are used to: measure and describe baseline environmental conditions (e.g., Present state of the environment ) predict impacts compare alternatives monitor implementation of policy, plan or programs

Identify Options Comparing alternatives enables decision makers to determine which policy, plan or programs is the best option:  achieves objectives at the lowest cost or greatest benefit  achieves the best balance between contradictory objectives

Identify Options Options can include: ‘do nothing’ or ‘continue with present trends’ option different locations different types of development which address the same objective (e.g., inshore or offshore cages) different forms of management

Impact Prediction Determine the type and magnitude of impacts that a policy, plan or programs is likely to have on the baseline environment Often it is most effective to evaluate policy, plan or programs against each other - focus on relative costs and benefits rather than absolutes which are often difficult to quantify

Types of Impacts Impacts can be: large or small, affecting an international, national, regional or local area positive or negative short-term or long-term, reversible or irreversible direct, indirect or cumulative likely or unlikely to occur easy or difficult to mitigate

Impact Evaluation Evaluating impacts involves determining the significance of identified impacts Impact Characteristics (e.g., spatial extent, reversibility) Impact Importance (e.g., value, sensitivity of the environment) x x = = Impact Significance

Mitigation The aim of the SEA process is to minimize negative impacts to the point where they are no longer significant Mitigation measures attempt to avoid, reduce, repair or compensate for impacts

Mitigation Mitigations at the SEA level are typically more strategic, proactive and more varied than those at the project level Mitigation measures may include: planning to avoid sensitive areas placing constraints or establishing frameworks for lower-tier assessments establishing new protected areas creating guidelines for PPP implementation Once mitigation measures have been proposed, the potential impacts should be re-evaluated

Strategic Environmental Monitoring There is a need for SEM programs that look for longer- term changes in environmental quality for a whole sector of the industry SEM programs should be industry-specific (e.g., shrimp pond farms, marine cage farms) and be designed to determine whether unexpected adverse impacts are occurring SEM results would indicate whether existing industry regulations are sufficiently protective or whether more stringent regulations are needed

Monitoring and Follow-Up Objectives: Test whether the development is achieving its objectives and benchmarks Identify any negative impacts which require remediation Ensure that mitigation measures are implemented Provide feedback to assist future impact predictions

Thank you European Union Food and Agriculture Organization of the United Nations Co-implemented byFunded by