Www.Channelcoast.org Southeast strategic regional coastal monitoring programme Phase 2 Current phase ends in 2007Current phase ends in 2007 Need to maintain.

Slides:



Advertisements
Similar presentations
The Implementation Structure DG AGRI, October 2005
Advertisements

Moving to a Unified Grants Process and a Single Monitoring Framework Jim Gray Acting Head of Community Planning, Corporate Services Dept, Glasgow City.
1 Headteacher Conference Future Provision for School Improvement through the BSP 29 April 2015 Grims Dyke Hotel Kay Charles, BSP Chair and Director Farzana.
SUMMER 2005 JUNE Preparing an Organizational Change Management Plan Org Change Management Activities by Project Phase.
Hepatitis C Action Plan: Phase II Programme Management Approach.
Copywrite C 1999 PMi HUMAN RESOURCES MANAGEMENT SYSTEMS Staffing Chapter 9.
Lean Supply Chain Action Learning Program September 2007.
Treatment Optimization in Latin America and the Caribbean: How can the GF contribute?
Session No. 3 ICAO Safety Management Standards ICAO SMS Framework
A Skills and Learning Observatory for Wales Building on best practice A review of Observatory development in the UK and beyond.
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points in Asia May 2008, Manila.
Iowa’s Teacher Quality Program. Intent of the General Assembly To create a student achievement and teacher quality program that acknowledges that outstanding.
DEFRA 1 st IMPACT Workshop - 16/17 May 2002 How does this research fit within the UK? Dr Mervyn Bramley Flood Defence Development Manager, Environment.
STRATEGIC PLAN & ANNUAL PERFORMANCE PLAN Templ ref: PPT-ISO-.001 Doc Ref no: STRAT-APP-PCWEA
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Reformed Partnership and Multi-Level Governance Ana Maria Dobre Political Administrator General Council Secretariat
Current condition and Challenges for the Future Report s (Scotland and Solway Tweed)
1 Dan Widner VGIN Coordinator VGIN Advisory Board January 9,
Endangered Species Act Counterpart Regulations for National Fire Plan Projects Bureau of Land Management Forest Service June 9, 2004.
Ministry of the Environment and Territory Directorate for Development and Environmental Research Ministry of Economy and Finance Department for Development.
Briefing on the Implementation of ASPA-WRM By Engr. Jorge M. Estioko OIC, Deputy Executive Director National Water Resources Board Philippines Agenda 6.6.
The Commission's Impact Assessment system 18 September 2014 María Dolores Montesinos Impact Assessment unit Secretariat General 1.
M&E requirements for grant signing: M&E Plan Workshop on effective Global Fund Grant negotiation and implementation planning January 2008 Manila,
Future Perspectives of Ocean Observatories in Germany [Name of the infrastructure / site / time series…] Contact person: [name, ] [Institution(s)
MEDIN Work Plan for By March 2011 MEDIN will be 3 years into the original 5 year development plan started in Would normally ask for continued.
Information Security 14 October 2005 IT Security Unit Ministry of IT & Telecommunications.
1 ARENA Workshop Renewables for Industrial Processes.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
TRANSBOUNDARY DIAGNOSTIC ANALYSIS 1.DIAGNOSIS - ASSESSMENT IDENTIFICATION OF WATER-RELATED ENVIRONMENTAL ISSUES & PROBLEMS QUANTIFICATION OF IDENTIFIED.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Strategic Regional Coastal Monitoring Programme in England
SOUTH WEST STRATEGIC REGIONAL COASTAL MONITORING PROGRAMME UPDATE ROB WEBBON OFFICE MANAGER.
Proposal on Revised Mechanism of Selecting Applications for Approval Presentation by Secretariat of Council for the AIDS Trust Fund in Sharing Session.
National Mapping Organisation Of South Africa Dr Derek Clarke National Geo-spatial Information NMO-Industry Forum 2011.
Polish National Rural Network Bureau of Technical Assistance Responsible for: -Technical Assistance in Programs of Rural Development for period.
SAON Operational Activities Draft proposal Jan René Larsen SAON Board Meeting, January 2012, Tromsø,
Map Viewer & Data Catalogue Map Viewer & Data Catalogue Tanja Cooper Channel Coastal Observatory.
Southeast strategic regional coastal monitoring programme Strategic Regional Coastal Monitoring Programme Procurement & Contract Management.
NATIONAL FLOOD FORUM PROJECT OFFICER Warwickshire Flood Resilience Community Pathfinder.
A BRIEF OVERVIEW OF THE POLICY ISSUES CONCERNING THE RCA PROGRAMME PRINATH DIAS RCA COORDINATOR.
SOUTH WEST STRATEGIC REGIONAL COASTAL MONITORING PROGRAMME Annual Partners Meeting 2012 Neil Baglow Regional Coordinator / Project Manager.
Review of 2013/14. Topographic surveys 31 post-storm surveys conducted over winter 2013/14.
Review of 2014/15. Topographic surveys Lidar surveys 2014/15 Partial areas only All signed off and loaded to website.
Southeast strategic regional coastal monitoring programme Andrew Bradbury Southeast strategic regional coastal monitoring programme.
Using Monitoring Data to Make a Difference: Cornwall Dune Management 6 th October 2009 Anne-Marie Moon, Dr Nigel Pontee, Dr Jonathan Rogers & Robert Webbon.
Project Team New Addition's Environment Agency Area Coastal Engineers Chair of South Devon and Dorset Coastal Authorities Group Chair.
Southeast strategic regional coastal monitoring programme Andrew Bradbury Review of Phase 1- where to next?
Nathan Sykes Plymouth Coastal Observatory
SOUTH WEST STRATEGIC REGIONAL COASTAL MONITORING PROGRAMME
SOUTH WEST STRATEGIC REGIONAL COASTAL MONITORING PROGRAMME
Annual Meeting 2015 South West Regional Coastal Monitoring Programme
Review of Phase ii & National Network
South East Regional Coastal Monitoring Programme
SWRCMP Progress Report and Programme Developments
Sex and Gender Goal Group
Programme delivery and development
Preparations for post-2020 Impact Assessment European Commission Directorate General for Regional and Urban Policy Unit DGA Policy.
Programme delivery and development
Aerial Photography 30th September 2004
MACHC CAPACITY BUILDING COMMITTEE MEETING REPORT
The partnership principle in the implementation of the CSF funds ___ Elements for a European Code of Conduct.
The Commission Communication on implementation (COM (2012) 95) in relation to Water Industry Directives (Urban Waste Water Treatment, Drinking Water,
Isle of Wight Centre for the Coastal Environment
Sex and Gender Goal Group
2012 Annual Call Steps of the evaluation of proposals, role of the experts TEN-T Experts Briefing, March 2013.
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points
Sex and Gender Goal Group
Status Report of the SPRWG of the Council
Jenny Watts Coastal Process Scientist, Plymouth Coastal Observatory
Presentation transcript:

Southeast strategic regional coastal monitoring programme Phase 2 Current phase ends in 2007Current phase ends in 2007 Need to maintain continuityNeed to maintain continuity Lengthy lead inLengthy lead in Application under preparationApplication under preparation

Southeast strategic regional coastal monitoring programme Review criteria Feedback from partner operating authorities through annual review meetings and one to one feedback from lead authorities.Feedback from partner operating authorities through annual review meetings and one to one feedback from lead authorities. Feedback from consultant and academic end users through workshopsFeedback from consultant and academic end users through workshops Discussion by project team, project board and South East regional coastal chairmenDiscussion by project team, project board and South East regional coastal chairmen Comparison with the key performance indicators outlined in the Phase 1 project planComparison with the key performance indicators outlined in the Phase 1 project plan Review of new legislation and national targetsReview of new legislation and national targets

Southeast strategic regional coastal monitoring programme Programme performance review The risk based approach to programme design has been fully implemented during phase 1The risk based approach to programme design has been fully implemented during phase 1 The survey programme has been completed to budget, following a delayed start.The survey programme has been completed to budget, following a delayed start. The programme management structure has been implemented successfullyThe programme management structure has been implemented successfully Modifications have been made to national (EA) survey standards and these have been adopted for the programmeModifications have been made to national (EA) survey standards and these have been adopted for the programme Common survey briefs have been adopted for surveysCommon survey briefs have been adopted for surveys Standardised procedures for data management, QA and archiving have been implementedStandardised procedures for data management, QA and archiving have been implemented Common data standards have been established, to remove ambiguity and improve accuracy and programme exchange.Common data standards have been established, to remove ambiguity and improve accuracy and programme exchange. A data warehouse and meta-database has been established at the Channel Coastal ObservatoryA data warehouse and meta-database has been established at the Channel Coastal Observatory SANDS databases have been developed and analysed annually, by the Coastal Group analysis teams for each of the coastal cellsSANDS databases have been developed and analysed annually, by the Coastal Group analysis teams for each of the coastal cells A website has been developed to deliver all programme dataA website has been developed to deliver all programme data An annual review has been conducted to critique the programmeAn annual review has been conducted to critique the programme

Southeast strategic regional coastal monitoring programme Economic review

Southeast strategic regional coastal monitoring programme Value of downloaded data over a six month period

Southeast strategic regional coastal monitoring programme Distribution of data downloads and benefits

Southeast strategic regional coastal monitoring programme

Proposed Programme Revisions Technical review

Southeast strategic regional coastal monitoring programme Aerial survey –No photogrammetric profiling to be conducted –Annual production of photographic scans –One set of orthophotos to be produced during 5 year period (year 4) Additional orthophotos to be produced on localised basis at sites where major works have been conducted or major natural change e.g. landslides.Additional orthophotos to be produced on localised basis at sites where major works have been conducted or major natural change e.g. landslides.

Southeast strategic regional coastal monitoring programme LIDAR –Conduct a single high resolution survey of the whole coast, including estuarine areas. –Replace photogrammetric elements of the ABMS programme with an annual LIDAR flight to cover inaccessible areas –Conduct LIDAR flights of estuarine areas every 3 years

Southeast strategic regional coastal monitoring programme Topographic surveys Baseline surveysBaseline surveys –50m profiles –Repeat baseline profiles will be used to reassess sampling used for subsequent profile surveys BMP sitesBMP sites –Additional sites to be added –All sites to be surveyed using ground based survey methods (revision to south downs only) Post storm surveysPost storm surveys –Unchanged Profile surveysProfile surveys –Unchanged ControlControl –Replace missing control and re-observe (estimate 40% existing) –Review requirement for aerial survey control

Southeast strategic regional coastal monitoring programme Bathymetry Reduction in bathymetric survey frequency from twice to once during 5 years (year 3 or 4)Reduction in bathymetric survey frequency from twice to once during 5 years (year 3 or 4) –Inlet mouth surveys to be maintained annually (as present) –Low tide range areas to be maintained annually at key sites (as present)

Southeast strategic regional coastal monitoring programme Waves –Renewals programme - provision for replacement of existing network. There is a possibility that some gauges will continue to function effectively. –New gauges WeymouthWeymouth SeafordSeaford SandwichSandwich

Southeast strategic regional coastal monitoring programme Tides Replacement gauge LittlehamptonReplacement gauge Littlehampton New gauge HastingsNew gauge Hastings

Southeast strategic regional coastal monitoring programme Project management structure Unchanged structureUnchanged structure Data management and analysisData management and analysis –No Changes –Allowance for sands development –Allowance for website development Develop online viewerDevelop online viewer

Southeast strategic regional coastal monitoring programme Environmental review Requirement for BAP habitat monitoringRequirement for BAP habitat monitoring Scoping study completeScoping study complete

Southeast strategic regional coastal monitoring programme Ecology (EA lead) –Baseline survey for BAP habitats to be completed –Data analysis system to be developed for central data archiving at the CCO –Data distribution system to be developed for local record centres

Southeast strategic regional coastal monitoring programme Funding and approval Sign up letters from partnersSign up letters from partners Expectation of 100% grantExpectation of 100% grant Uncertainty over priority scoreUncertainty over priority score Application to be completed within next monthApplication to be completed within next month