DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.

Slides:



Advertisements
Similar presentations
Third Energy Package for Change of Supplier 2009/73/EC.
Advertisements

Funding UKLink Process changes (User Pays). 2 Purpose of Presentation  Review of User Pays  Principles  Application to date  National Grid NTS observations.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Commercial Arrangements For Gas Quality Service – Process UNC Transmission Workstream 23 rd April 2007.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
UNC Modification Proposal Revised Timescales for LDZ Shrinkage Arrangements Simon Trivella – 25 th September 2008 Distribution Workstream.
Exit Reform Review Transmission Workstream 07 January 2010.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
1 CODE MODIFICATION PROPOSAL No 0243 Amendments to the process for initialisation of Enduring NTS Exit (Flat) Capacity at the Moffat NTS Exit Point Presentation.
Amendments to NTS Shrinkage Reporting Process Nick Reeves.
“Introduction of a New Shipper Obligation in Relation to the Procurement of Gas Below the Gas Safety Monitors” Transmission Workstream 4 th Jan 2007 Chris.
Transfer & Trades Special Transmission Workstream
Capacity Release Processes and Investment Planning Transmission Planning Code Workshop 2 1 st May 2008.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Review of the UNC Post-emergency Arrangements Workshop 1 March 2009.
DN Update 24 th May 2007 LDZ System Charges Capacity/Commodity Split and Interruptible Discounts.
Mod 116B Steve Rose - on behalf of RWE Trading. 2 Background Mod 116 B was raised after discussion with a number of shippers about aspects Mod 116 which.
Ofgem’s Gas SCR – Background on the DSR mechanism Stephen Jarvis 02/07/14.
Revision of the UNC Post-Emergency Arrangements draft proposal July 2009.
Transfers and Trades Transmission Workstream
Mod 0333: Update of default System Marginal Prices Review Group August 2010 Transmission Workstream 07/10/2010.
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
National Grid UK Distribution Update Gas Customer Forum 29 th January 2007 Kerri Matthews.
UNC Proposal 329 – Review of Industry Charging & Contractual Arrangements - DM SHQs and DM SOQs Joel Martin – 21/09/10.
Review Group Modification Proposal Introduction of Enduring NTS Exit Capacity Arrangements.
Governance and Charging Methodology for User Pays Services 10 th January 2007.
DN Interruption Reform Distribution Workstream 23 rd July 2009.
Presented by : Steven J Edwards, Head of Income and Pricing, Wales & West Utilities GDN Allowed and collected revenue awareness presentation for Shippers.
Distribution Network Interruption - Initialisation 28 September 2010.
1 UNC Modification 429 Customer Settlement Error Claims Process – Guidance Document.
Exit Capacity Substitution and Revision Transmission Workstream meeting, 3 rd December 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Proposed DN Pensions Deficit Charge Transmission Workstream 2 November 2006.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
1 v1 iGT CSEP Billing Solution ScottishPower Proposals April 08.
Implementation of Trades and Transfers National Grid NTS 5 th June 2008.
11 User Pays User Committee 14th September Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
11 User Pays User Committee 16th February Agenda  Minutes & Actions from previous meeting  Agency Charging Statement Update  Change Management.
Emergency Cashout Prices and Emergency Curtailment Quantity (ECQ) Adjustment Ritchard Hewitt Gas Code Development Manager.
Transmission workstream 6 April Overview of TPCR Third Consultation UNC transmission workstream – 6 April Mark Feather.
Agency Charging Statement Overview of Consultation 11 th February 2008.
1 Review Group 264 Rules & Options Analysis for BSSOQ Methodology Changes Post MOD th September 2009.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th March 2009.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Transfers and Trades Special Transmission Workstream
DN Interruption Reform (UNC Mod 90) Liz Spierling Commercial Manager, Transportation.
Gemini Release 4 UKLC Update 8 th February Gemini Release 4 – UKL13820  UK Link Committee is requested to approve the following:  Implementation.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
NTS Exit Regime Transmission Workstream – 6 th July 2005.
Distribution workstream 29th January 2009
Transmission Workstream February 2009
Transmission Workstream 4th July 2007
NTS Entry Charging Review Update
Simon Trivella – 22nd May 2008 Distribution Workstream
Exit Capacity Substitution and Revision
Modification 501 slides for Workgroup
DN Interruption & Charging
DNPC07 Proposal DNPC07 proposed that Capacity/Commodity split of the LDZ System Charges should be changed to 100/0 The percentage of the Firm Capacity.
Proposed Transitional Gas Exit Arrangements
Revised Tender Timescale for DN Interruption Arrangements
Gas Customer Forum DN Interruption Update - Introduction
Mark Freeman 29th January 2007
Optimisation of Entry Capacity Modification Proposal
Information Provision for Transitional Exit Capacity
Transmission Workstream DN Interruption Update - Introduction
DN Interruption Phase II
Revised Tender Timescale for DN Interruption Arrangements
30th November 2007 Beverley Grubb SGN
Presentation transcript:

DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007

Content 1. Background 2. Useful sources of information 3. Key Milestones 4. Types of Interruption 5. Key Features of the Regime 6. Interruptible Capacity Methodology 7. Tender Process 8. Dates to Remember

Background  Revised DN Interruption Arrangements – Modification Proposal 0090 implemented  Ofgem decision 15 March 2007  Implementation Date 1 April 2008  New regime significantly different from existing regime  DNs determine interruption requirements three years ahead (e.g. Feb 2008 for 2011 onwards)  DNs publish interruption requirements (May 2008)  Users value interruption - bid into DN tender process  DNs select bids (offers) based on interruption requirements  Successful Users receive payment for being interruptible  Transition Arrangements in place to 2011 (based on existing arrangements)

Key Information Sources  Uniform Network Code  New rules in section G6  Transition Arrangements – Transition Document  Interruptible Capacity Methodology  published by each DN  Pricing Methodology papers  Removal of capacity discounts (issued 02/02/07)  Change of capacity/commodity split  Cost recovery of NTS charges  Ofgem Consultations  DN incentives – initial proposals (Mar 07 ?)

Key Milestones (Apr 08 implementation) Feb MarAprMayJunJulyAug /11 Ofgem decision on Mod 0090 DN Incentives Initial Proposals Publish Results Bid Analysis Sale of Rights Buy NTS Offtake Capacity Publish Interruption Requirements DN Incentives Final Proposals Final Impact Assessment Licence Mods SepOctNovDecjan Feb MarAprMayJunJulyAug /12 10/11 11/1210/11 11/12

Types of Interruption  Commercial Interruption  Unchanged by reform  Emergency Interruption  Unchanged by reform  Test Interruption  Unchanged by reform  Volume Interruption  Location Interruption

Key Features of Regime (1)  Users pay firm charges from 2011 onwards  Users successful in tender receive payment for being interruptible in the interruptible period  Receive option payment (monthly in arrears)  Receive exercise payment each time interrupted  Interruption Allowance is the number of days in an interruptible period (Gas Year) that a supply point can be interrupted  Interruptible period is a Gas Year or other period that supply point capacity is designated as being interruptible  Eligibility  LDZ Supply Point, AQ > 200,000 therms, daily metered (at time interruptible capacity is used)

Key Features of Regime (2)  Interruptible supply point capacity can be designated in tranches  Each tranche shall not be less than the minimum interruptible amount  Number of interruptible tranches shall not exceed 9  Aggregate amount of interruptible tranches shall not exceed the amount of registered supply point capacity  Supply point transfer  Contract details supplied by DN within two days of submission of confirmation for an existing supply point  Same contract terms transfer to incoming shipper (prices, interruption allowance, interruption period etc)  Increase/decrease in capacity (SOQ)  Increase supply point capacity shall be deemed as firm  Decrease in capacity shall decrease the interruptible supply point capacity tranches (highest price first)

Key Features of Regime (3)  Tender processes  Annual process (May-July)  Ad-hoc process (dependent on requirements)  Failure to Interrupt:  Charge calculated by:  2 * the quantity exceeding the effective capacity * the greater of the annual LDZ capacity rate or the overall interruption price  Redesignation as Firm  A User can apply (other than during the tender process) to redesignate an interruptible supply point as firm  Similar process to the existing provisions  Interruption Notices  Similar to existing UNC provisions

Option and Exercise Regime (1) Option price A Option price B Exercise price A Exercise price B Interruptible Allowance (days)

Option and Exercise Scheme (2) Application sequence Option PriceExercise PriceExercise sequence Accept lastP5P5 50E1E1 10Exercise first P4P4 40E2E2 20 P3P3 30E3E3 P2P2 20E4E4 40 Accept firstP1P1 10E5E5 50Exercise last

Interruptible Capacity Methodology  Will include:  The financial terms (including option price and exercise price) on which offers may be made  Basis for ranking interruptible offers for selection  The basis of defining interruption zones  The number of days in an interruptible period that may comprise an interruptible allowance  The basis for determining minimum interruptible amounts

Tender Process  Interruption Invitation  Interruption Offers  Acceptance of Interruption Offers  Publication of Results  Processes and Systems  managed by xoserve, DN decision making  manual System developed; considering automated system for 2008

Tender Process Interruption Invitations (1)  For annual invitation in Gas Year Y DN shall invite offers for Gas Years Y+4 to Y+8 inclusive  Invitation dates shall be 10 consecutive Business Days in June  First invitation date not less than 28 days after Interruption Invitation issued  For 2008  First invitation date shall 4 th June 2008  Invitation issued on 1 st May 2008

Tender Process Interruption Invitations (2)  Invitation shall specify:  Identity of DN Operator  Interruptible Period(s) for invitation  Interruption zone(s)  Invitation Dates  Minimum Amount per Interruption Zone  Available Interruption Allowances per Interruption Zone  Estimate of Interruptible Supply Point Capacity per Interruption Zone  Maximum number of offers for the interruptible period per:  Supply point  Tranche of supply point capacity  Any other terms required or permitted by the Interruptible Capacity Methodology

Tender Process Interruption Offers (1)  Interruption Offer shall specify:  The identity of the User  The interruption Invitation  Supply Point (within the interruption zone)  Interruptible Period  For each tranche:  The amount of supply point capacity  The interruptible allowance  The interruption option price  The interruption exercise price  If supply point already interruptible (from previous invitation)  Can specify additional proposed interruptible tranches  Can increase the interruptible allowance (if allowed by methodology)

Tender Process Interruption Offers (2)  User can submit, withdraw or modify an offer between 08:00 and 17:00 hrs on an invitation date  Can only have the permitted number of offers as per the Invitation, Supply Point, Interruptible Tranche and Interruption Period  DN can reject an interruption offer if:  Supply Point is not eligible  User is not a Registered user  Does not comply with:  Stipulations on tranches  Stipulations for submitting, modifying or withdrawing offers  Does not comply with Interruptible Capacity Methodology  DN will notify user of rejection of the offer within 2 days after the invitation date on which the offer was made

Tender Process Acceptance of Interruption Offers  DN will select offers in accordance with the Interruptible Capacity Methodology  DN will inform Users which offers have and have not been accepted not more than 28 days after the last invitation date  If accepted the applicable tranche becomes interruptible and the option is price is payable to the User by the DN (at the time the interruptible capacity is to be used e.g. typically three years time)

Tender Process Publication of Results  Published not more than 28 days after the last invitation date for the LDZ as a whole and where in each Interruption Zone offers were accepted by at least 3 Users:  The number of Interruption Offers received  The number of interruption offers accepted by the DN  Aggregate Supply Point Capacity for which offers were received  Aggregate Supply Point Capacity designated as Interruptible  Highest and lowest overall (option + exercise) interruption prices submitted by Users  Highest and lowest overall (option + exercise) interruption prices submitted by Users that were accepted by the DN

Dates to Remember  Proposal Implementation1 April 08  Interruption Requirements published1 May 08  Bid window opens (interruption offers)4 June 08  Bid window closes 15 June 08  Notification of successful bids13 July 08

DN Interruption Reform Transmission Workstream Any Further Questions ? Mark Freeman 5 th April 2007