Update su sistema distribuzione laser: pannello del calorimetro C.Ferrari, A.Fioretti, C.Gabbanini, G.Venanzoni INO, UOS Pisa, Via G. Moruzzi 1, 56124.

Slides:



Advertisements
Similar presentations
Muon g-2 and SLAC Detector Test T-519 Momentu m Spin e David Hertzog University of Washington.
Advertisements

HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
PEP II Transverse Feedback System Ron Akre Anatoly Krasnykh Uli Wienands MAC April 15, 2004.
ECAL Spike Plot Approval ECAL Anomalous Signal Plots Approval Adi Bornheim for ECAL
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group 10th ICATPP Conference on Astroparticle,
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
RBX PRR - March 1-2, H C A L HCAL RBX PRR Readout Box (RBX) PRR Dan Green HCAL Project Manager.
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
SLC  Testbed Proposal Jeff Gronberg  working group SC Linear Collider Retreat June 26 – 29, 2002.
Walls crates cables gas chambers electronics CERN adb.
1 HF Laser/LED Calibration Studies L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH 1->9 light splitter w/ pulsed.
Laser Notcher Status Dave Johnson PIP Meeting April 29, 2014.
KM3NeTmeeting Pylos, Greece, April of 12 Mar van der Hoek et al. electronic department PROGRESS ON OPTICAL MODULATORS FOR KM3NeT Mar van der.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
1 to 7 fibres in240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara,
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
N 2 Laser 300  QQ 150m HF  HF + 9 PMT Boxes  QP Calib Box 1  4 Counting Room HF Calibration Optical Fiber Path 9 PMT Boxes / Quad 24 PMT Tubes.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Stabilization of Focus at ATF2 David Urner University of Oxford.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
1 Prototype Calibration System for Forward Hadron Calorimeter L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Flavio Gatti,Frascati-PSI, Jan 31 th, 06 1 TC status. Flavio Gatti UNIVERSITY and INFN of Genoa, Italy.
Kavita Lalwani, Pooja Saxena, Kirti Ranjan, Ashutosh Bhardwaj Department of Physics & Astrophysics University of Delhi Manoj Sharan High Energy Nuclear.
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
V. Sonnenschein, I. D. Moore, M. Reponen, S. Rothe, K.Wendt.
Light Loss Tests Update Aron Fish 22/02/06 Mice Tracker Phone Conference.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Gain stability and the LYSO beam radiation monitor measurements
Linearity Tests The laser induced high noise pulses on the APD rendering it useless. We tried several methods to shield and filter the noise. With a stabilized.
first results from EMCal test beam
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
DON LYNCH NOVEMBER 6, AGENDA November 4, BABAR Magnet Update Global Design Concept – Update Outer HCal Structural Analysis (2 nd pass) sPHENIX.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
LCGT Meeting Laser & Mirror 12 December, Laser Ordered fiber amplifiers made by Nufern will be shipped on 16 th December. After the amplifiers arrive.
Sistema distribuzione laser: pannello del calorimetro C.Ferrari, A.Fioretti, C.Gabbanini, G.Venanzoni INO, UOS Pisa, Via G. Moruzzi 1, Pisa LNF,
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
Energy and time resolution for a LYSO matrix
SESAME TL2 and SR Diagnostics
Profiler Mechanics Update
Calibration System Updates 27/4/2017
Why we need an improved LASER calibration system
Mu2e crystals qualification
INSIDE in-beam PET system assembly and test at INFN Torino
Claudia Cecchi University of Perugia and INFN
PMT cabling Gian Luca Raselli INFN Pavia
Plans from last meeting
Report on Working Group # 2 The MU2E detector
CMS ECAL Calibration and Test Beam Results
Instrumentation for Colliding Beam Physics 2017
Directional Optical Module Integration
Overview on calorimetry R&D for FACTOR (Messina/Trieste/Udine approach) (V. Bonvicini et al.) A. Penzo (June 4, 2008)
Injector Drive Laser Technical Status
Presentation transcript:

Update su sistema distribuzione laser: pannello del calorimetro C.Ferrari, A.Fioretti, C.Gabbanini, G.Venanzoni INO, UOS Pisa, Via G. Moruzzi 1, Pisa LNF, INFN Frascati

f DAQ, Slow Control laser1 laser2 laser3 laser4 laser5 laser6 Laser control Source Monitor Fiber collimator Laser hub Diffuser Calorimeter Local Monitor X 24 T80/R20 50/50 filter wheel PANEL Fibre lancio al centro ring – stazioni calorimetriche Sistema distribuzione laser

Impulso laser dopo fibra lancio 25 mt step-index silica fiber 1.5 ns attesi 0.8 ns osservato

Diffusore sphere no lens with lens no lens Engineered diffuser ED1-S20 by RPC Photonics – Thorlabs

Stability of distribution system (a few pJ/pulse at the PINs) Laser launching fiber (  600  m) Fibers PMMA 1mm diffuser PIN2+CREMAT PIN1+CREMAT CAEN DT5730B systematics ~ /h

Light sealed diffuser Silica launching fiber Diffuser enclosure POF bundle

Diffusore + bundle

+/- 5V Bias x 4 Comm HDMI breakout Air below Calorimeter and rack mounting (adapted from Dave, top view) Launching fiber (SMA connector) Laser diffuser (in light sealed tube) POF bundle (64 fibers) Light distribution panel Rigid aluminium/plastic enclosure For bundle and diffuser Local monitoring (PMT)

PMMA fiber Prism PbF 2 crystal SiPM Panello 1° prototipo PVC

2° prototipo in Delrin 1x9

Output power from panel n.fibra Red: output from fiber Blue: output after coupling Green: ratio blue/red Fibre 1 mm PMMA Prismi 8 mm senza a.r. coating

Output power from two fibers

Light distribution out of crystal Fiber 1mm PMMA NA=0.49 Disomogeneity 3% on 12 mm 1D

Distribution system transmission: 6 lasers/ 24 diffusers Required value of the output of each crystal: 0.01 pJ/pulse (el. 2GeV); for each calorimeter: 0.6 pJ/pulse Element Transmiss ion Energy (pJ) Notes Laser Picoquant output750100% current intensity Source monitor sampling80% pJ/pulse for the source monitor (2 PD and 1 PMT) Filter wheel100%600 Division into four fibers 25% 150 Fiber coupling + 25 mt quartz fiber 70% 105Measured Diffuser with bundle (54 fibers) + 3 local monitors 10%10.5 It can increased by reducing uniformity 1 mt bundle POF (200 dB/km) 90%9.5 Prism coupling 65% 6.1 Prism with anti-reflection coating and with metallized reflecting face PbF 2 crystal reflection + absorption (20%) 65% 4.0 Total per calorimeter4.0Required: 0.6 pJ /pulse /calorimeter Not included: Beam splitting losses (mirrors, b.s.) Counter-panel losses

Acquisti distribuzione 28 K€ anticipo 2015: Prismi 7 K€ 24 diffusori 10 K€ Delrin x pannelli 1 K€ Spool fibra + 1 bundle 5 K€ Elementi x splitting 5 K€ Nel 2016: Bundles Fibre di lancio Lasers & Splitting rimanente

Conclusioni Il sistema di distribuzione laser è ben definito Prototipo di pannello testato; pannello completo in delrin (6x9) in costruzione a breve (officina INFN-PI grazie a F.Bedeschi) Sistema a 6 laser / 3 laser da definire dopo il test beam a SLAC Primi ordini per costruzione apparato ad ottobre

SPARES

Calo version... 1) December 2016 milestones (can be earlier) UW builds complete module carries out local tests for cooling, system performance, etc. Naples sends a Flight Simulator to Seattle for us to begin incorporating it into our light flashing system. UVa/JMU has provided commercial bias supplies for a full calorimeter (4) and the +/-5V distribution. Also provides needed cabling Cornell and Kentucky have completed tests at Fermilab of digitizers and DAQ "Offline" tools available to reconstruct pulses, make histograms, etc. 2) January Week 1. Pisa team has delivered completed Front Panel, Bundle, Light Distributor, Laser and Splitters. 3) Februrary Week 1. Cornell delivers crate of Riders Week 1. Kentucky delivers DAQ.and associated bundle, laser, etc, to drive. Someone (Wes?) needs to be in Seattle for a week of shakedown and expertise transfer. This month used for running with Flight Simulator and for writing analysis and diagnostic codes. 3) March. Week Buffer for any delays Week 4. Packing for shipment to SLAC. 4) April TEST BEAM TIME AT SLAC Week 1. Arrive SLAC; Build installation Week 2. Tracker tests day; Calo test night Week 3 Calo tests day; Tracker night Week 4 Combined data taking 5) May Analysis 6) June 1st. Calo kits shipped to FNAL to begin assemble All Laser Front Panel kits also arrived FNAL for assemble... etc Professor David Hertzog University of Washington Department of Physics Box Seattle, WA (206)

Transmission coefficient- diffuser Inhomogeneity strictly connected with transmission coeff. Measurements with/without collimating lens changing the distance diffuser-bundle or lens/bundle

Transmission coefficient- diffuser Inhomogeneity strictly connected with transmission coeff. Best results: without lens 5.7% in a bundle group T= (new with square pattern diffuser: 4%) with lens 7% in a bundle group T= sphere no lens with lens

Diffuser no lens with lens 2% inhomog. on 0.2 mm in the central zone