A. Perin, TE/CRG, 14.10.2015 Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi,

Slides:



Advertisements
Similar presentations
L. Tavian, TE/CRG, Page 2 12 th September 2013 Accelerator Consolidation Workshop L. Tavian, TE-CRG.
Advertisements

ESS Cryogenic System Design
ITER Cryoplant System Status
UNICOS-CPC applied to Cryogenics and specifications Benjamin Bradu EN-ICE-PLC February 2014.
Current status Arkadiy Klebaner November 21, 2012
12 GeV Upgrade of Cryogenics at Jefferson Laboratory (Jlab) Dana Arenius Engineering Division Cryogenic Systems ILC08 Nov This work is supported.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
LHC Experimental Areas Forum - 03/07/ ATLAS Helium Cryogenics Nicolas Delruelle on behalf of the AT / ECR group.
Progress report on the test facility project design and construction P. Schnizer and L. Serio on behalf of bldg. 180 test facility project team members.
Internal review of superconductors and magnet laboratories 2nd part: Infrastructure/Laboratories Cryogenics Klaus Barth (CERN), Vladislav Benda (CERN)
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
Cryogenics in SPS & LHC (2 K / 4.5 K) LHC-CC11, 14 November 2011 L. Tavian, CERN, TE-CRG With the contribution of N. Delruelle, G. Ferlin & B. Vullierme.
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
New compressor station Second stage of nitrogen system (N2 refrigerator, cryogenic tank, pipe lines) Cryogenic equipment required to run NICA Third stage.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
Process Definition of the Operation Modes for Super-FRS Magnet Testing CSCY - CrYogenic department in Common System, GSI, Darmstadt Y. Xiang, F. Wamers.
TE-CRG Interfaces Fair S-FRS magnets - CERN cryogenics Control interface CERN-GSI for B.180 cryogenics Control interface CERN-GSI for B.180 cryogenics.
Cryogenics for crab cavities – SPS/LHC 2 nd HiLumi LHC meeting – Frascati (Italy) 15 November 2012 K. Brodzinski and L. Tavian on behalf of cryogenic team.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
Central He distribution service upgrade status and dedicated He distribution for AD K. Barth on behalf of TE/CRG ADUC and ELENA Meeting Wednesday, September.
MAGNET#1MAGNET#2MAGNET#3 SATELLITE VB#1 SATELLITE VB#2 SATELLITE VB#3 PRECOOLER#1PRECOOLER#2 DISTRIBUTION VALVE BOX DVB CP#1CP#3CP#2 BUFFER DEWAR LHe 5m.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/21.
D. Delikaris, TE-CRG, LSC 25th Meeting Page 2 October 18 th, 2013 LS1 Committee (LSC)- 25 th Meeting D. Delikaris, TE-CRG Cryogenics activities.
TE-CRG Activities D. Delikaris, TE-CRG.
ITER Liquid Helium Plants Status and Test Protocol ICEC June 29th, 2015 / Grenoble / FranceY. FABRE.
CMTF Cryogenics (status and plans) SRF program and AD/Cryogenics work presented by Arkadiy Klebaner May 21, 2013.
LCLS-II Cryoplant Overview
Thomas Jefferson National Accelerator Facility Page 1 Dana Arenius Cryogenics Control Account Manager 12 GeV Upgrade Project X Collaboration September.
O. Kester, NuSTAR annual meeting, 27/02/2013
CRYOGENIC SYSTEM of RAON Chul Jin Choi, Ki Woong Lee Cryogenics and Control Team Accelerator Division 5/23/2013 Chul Jin Choi, Ki Woong Lee Cryogenics.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
Crab Cavities SPS cryogenics – progress and requirements Fermilab visit at CERN 02 August 2013 Krzysztof Brodzinski (on behalf of CERN cryogenic team)
Internal review of superconductors and magnet laboratories 2nd part: SM 18 & b.163: current status, weak points, possible improvement Cryogenics Vladislav.
EN-CV Progress EHN1 Extension Project Jérôme Rodary EN-CV-PJ 2016/01/14.
Cryoplant Controls Installation
Dana Arenius LCLS-II 4.5K Cold Box Director’s Review November 16, 2016
2K Cold Box FDR Introduction
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Status, Schedule and EVM for the test facility project
He Plant, LN2 Systems and Commissioing
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
FRIB Cryogenic Support
Francois and Lau EATM 17 July 2012
* MARKET SYSTEM RELEASE UPDATE Modifications Committee Meeting 9 August 2011 * 1##
Cryoplant Installation Scope
Dana M. Arenius Jefferson Laboratory Cryogenics Dept Head
SPS cryogenic proximity equipment and SM18 validation
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
ESS RF Development at Uppsala University
Status of the cryogenic system for B180
The HIE—ISOLDE Cryogenic System, its Infrastructure and Considerations for Phase 3 O. Pirotte (TE/CRG)
2K CB FDR Overview:  Agenda, Charge, Review Process
IBBelle: Status Commissioning at MPP Transport to KEK
TEST PLANS for HL LHC IT STRING
ESR 2 Presented to Joint Hall A/C Summer Meeting
Scope, Requirements Deliverables & Schedule
Overarching Commissioning Plan
SNS Cryoplant Commissioning Past Experiences
CNRS contribution to ESS – 01/02/17
Spoke section of the ESS linac: - Status of prototypes and CDS-SL
Discussion on MERIT Cryogenics Specifications
ESR2 Process Cycle Design
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
ESR2 Process Cycle Design
Cryogenic upgrade of B163, B165 & B253 Status Meeting 19th December 2018
General Overview of WP 12 ESS Vacuum System
Presentation transcript:

A. Perin, TE/CRG, Page 2 CERN-GSI FAIR Project integration/coordination meeting 5 14 th October 2015 A. Perin, H. Derking, L. Stewart, M. Chesi, B. D’Hulster, V. Inglese, K. Iakovidis, P. Chambouvet, G. Favre Acknowledgements: all the B180 cryo and project team

A. Perin, TE/CRG, Page 3 Outline Interfaces Project status Change requests

A. Perin, TE/CRG, Page 4 Status of the cryogenic system For new equipment: several contracts signed and now in detailed design. For existing equipment: refurbishment has started.

A. Perin, TE/CRG, Page 5 B279: TCF200 compression station

A. Perin, TE/CRG, Page 6 Status of cryo for B180: detailed dashboard All information (detailed dashboard, etc. ) is available on the project website: cern.ch/B180cryo

A. Perin, TE/CRG, Page 7 Status of cryo for B180 All information (detailed dashboard, etc. ) is available on the project website: cern.ch/B180cryo The most critical items are as planned. Resource availability critical for local work.

A. Perin, TE/CRG, Page 8 Status of cryo for B180: contracts MS & ITs for pre-cooler 2 shifted to secure tasks that are mandatory for startup in summer Contracts for the most critical items are signed.

A. Perin, TE/CRG, Page 9 Proposal for new baseline (1/2) Cold box TCF200: outsourced to Linde. Dec 2015 to July 2016 Pre-cooler 2: order planned jan-Feb 2016, installation Jan 2017 Precooler compression system:  Orginal baseline: two compression systems: backup & possible higher flow  A spare «free» compressor was retrieved from CNRS Grenoble, identical to the existing S26.  Second compression station: necessary only if required cooldown speed is increased.  Second S26 STAL compressor to be used as spare. Also spare motor + all critical parts to limit possible downtime.  Change request: do not procure second compression system. Prepare all interfaces for possible upgrade. Updated schedule: All systems delivered by end of July 2016 Commissioning in September-October 2016 Fully compatible with planned test schedule for S-FRS magnets Second connection/commissioning for precooler 2 to be planned in 2017.

A. Perin, TE/CRG, Page 10 New proposed baseline 2/2 (EVM in work) Ongoing work: new baseline proposal to be formalized 16 Oct.

A. Perin, TE/CRG, Page 12 Project update 1/2 Schedule and budget: new baseline for 18th October. Target date for cryo commissioning end: Oct OK. But very critical for local resources. B279 Detailed integration of compression stations ongoing. Noise measurement performed on 18 th August: 10 dB too high. Envisaged solution: local insulation of compressors. Target date: 30 th of October for detailed plan & drawings. S26 compressor(s): “spare” compressor back from CEA Grenoble this week. Major overhauling of compressor is being prepared. Mayekawa compressor: second meeting held on 24th September. Scope of contract adjusted. No show stoppers. Refurbishment of the Distribution Valve Box: work ongoing.

A. Perin, TE/CRG, Page 13 Project update 2/2 B180 TCF200 cold box: Linde Visit 23rd September. Cold box to be sent to Linde Nov-Dec 2015.Leak tests to be performed before shipment. ✔ Cryo valves: Detailed design approved. Ok. ✔ Cryo distribution: Contract signed with Kriosystem (Poland). Kickoff meeting done 18th Sept. Detailed design ongoing. Ok. ✔ Lhe dewar: spec. ready be shipped for Price enquiry. ✔ Precooler 1: detailed design ongoing. Warm piping & gas management:PFD under preparation. Critical for next steps. LN2 system: draft specification done. Target: price enquiry by end October. ✔ Pre-cooler 2: work on spec to be restarted. Target: place order Jan-Feb 2016.

A. Perin, TE/CRG, Page 14 Detailed status: procurement 3 prototype tests are scheduled from November 2016 to September series tests from Nov 2017 to May 2021 Test rate will be 2 magnets / mont

A. Perin, TE/CRG, Page 15 Detailed status: refurbishment & non Its items 3 prototype tests are scheduled from November 2016 to September series tests from Nov 2017 to May 2021 Test rate will be 2 magnets / mont

A. Perin, TE/CRG, Page 16 CE Planning Required CE man power for CB and Precooler1 available thanks to the participation of 2 technical staff + 1 fellow + 1 student in order to readjust personnel allocation to other projects

A. Perin, TE/CRG, Page 17 List of equipment Existing equipment, all instrumentation to be refurbished Cold box 6 g/s of liquefaction capacity or 1'200 refrigeration Distribution Valve Box (DVB). To be modified. 9 kW pre-cooler including 50 g/s compressor (maintenance required) GHe buffer, 5 x 80 m 3 for 5 m 3 of Lhe New equipment required Compressor station for cold box, m=150 g/s at 18 bar Dryer 10 kW pre-cooler including 15 kW heater inclusive of compressor station 50 g/s including buffer. Satellite 15 kW heater to implemented to the existing 10 (9) kW pre-cooler 1 Connection valve box (CVB) 3 satellite valve boxes (SVB) including instrumentation 3 cryogenic lines between the distribution valve box and satellite valve boxes 4 cryogenic lines between two pre-coolers and 3 satellite valve boxes (including 10 valves, 2+6+2, integrated in SVB) LHe dewar, V min = 5 m 3 of LN tank, 50 m 3 Cryogenic infrastructure