Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.

Slides:



Advertisements
Similar presentations
Proton and neutron radiation facilities in the PS East hall at CERN Maurice Glaser, Michael Moll, Federico Ravotti CERN.
Advertisements

IEFC Workshop – 22/03/2011 JJ Gras on behalf of BE-BI 1.
Accelerator Complex Status P. Collier. Linac2, Booster and PS Startup on-time, according to the schedule. Only minor problems Rapidly set-up the major.
FUTURE IRRADIATION FACILITIES AT CERN Lucie Linssen PH/LCD - for the Irradiation Facilities WG  Introduction.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Kirk McDonald Monday, 28th May Report of the International Working Group on Muon Beamlines Bruno Autin, Roberto Cappi, Rob Edgecock, Kirk McDonald,
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
HIE-ISOLDE Design Study and the CATHI Project Richard Catherall EN-STI ISOLDE Technical Coordinator HIE-EBIS Workshop 16 th -17 th October CERN.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
WP8.3.3 Status of Cold Boxes & Irradiation of Si sensors Maurice Glaser Frederico Ravotti Michael Moll Graham Beck, Jag Mistry Gianluigi Casse, Paul Dervan.
Irradiation Facilities at CERN for RD-51 Micro-Pattern Gas Detectors (RD-51) Workshop Nikhef, Amsterdam, April Mar CAPEANS CERN.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
High-Level Dosimetry systems used at CERN Markus Fuerstner 1, Doris Forkel-Wirth 1, Helmut Vincke 1, Sabine Mayer 1, Isabel Brunner 1, Idelette Floret.
Radiation Test Facilities G. Spiezia. Engineering Department ENEN Radiation tests facilities  Radiation test in the accelerator sector  External facilities.
J.-P. Riunaud PS/AE PSMB 16/09/2002 Report from 59 th SPSC meeting 03/09/2002 OPEN SESSION on Tuesday, 3 September 2002 at 09:00, Main Auditorium 1. Proposal.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA H2020 Open Meeting,
Summary of CMS 3D pixel sensors R&D Enver Alagoz 1 On behalf of CMS 3D collaboration 1 Physics Department, Purdue University, West Lafayette, IN
East Area Day, 1 February 2012 Lau Gatignon / EN-MEF.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
12/10/05NuPAC – CERN 2005M. Benedikt 1 Potential future proton beam performance at CERN for HIE ISOLDE, n_TOF phase 2 and EURISOL Michael Benedikt AB Department,
Si-detector macroscopic damage parameters during irradiation from measurements of dark current evolution of with fluence Craig Buttar, University of Sheffield.
1 Report of PAC for Particle Physics T. Hallman Presented by P. Spillantini JINR Scientific Council Meeting June 3-4, 2004 Dubna, Russia.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement WP8 – Improvement and.
STATUS REPORT WP7 Facilities and Component Analysis for Detector R&D Activities and Status Resources and Expenditures Work plan Mar CAPEANS 3/11/08 M.C.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
| kvi - center for advanced radiation technology 1 KVI-Center for Advanced Radiation Technology M.A. Hofstee 19-sep-2014 RADSAFE Kick-off, CERN.
M.Moll, M.Silari, H.Vincke – 3.April Feedback  In total 134 forms filled:
Introduction to Irradiation Facilities 1. Challenges at LHC and Why we need Irradiation Facilities (Mar CAPEANS) 2. PH Department Proton and Neutron Facilities.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
( name in progress) Kick-Off meeting August 28, 2013 Markus Nordberg Marzio Nessi Chris Thomas Harri Toivonen Tuuli Utriainen Introduction:
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
Lau Gatignon, EATM,  The construction of the CHARM and IRRAD zones is completed and operation at nominal intensity started yesterday.
FINDINGS AND CONCLUSIONS OF THE WORKING GROUP ON FUTURE IRRADIATION FACILITIES I. Efthymiopoulos, EN/MEF - for the Irradiation Facilities WG
M.Moll, M.Silari, H.Vincke – 3.April Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN:
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement L. Serin CNRS/IN2P3.
Charge Collection, Power, and Annealing Behaviour of Planar Silicon Detectors after Reactor Neutron, Pion and Proton Doses up to 1.6×10 16 n eq cm -2 A.
Mixed field irradiation -- Who answered ?  In total 36 forms filled / 34 persons answered: 38% 62% CERN: mainly LHC related topics CERF: beside LHC topics.
PH-DT-DD Meeting – PH-DT-DD: SSD-Solid State Detectors The team today (CERN & visitors): R&D: Development of radiation tolerant silicon detectors.
DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.
Fermilab Test Beam and Irradiation Facilities Erik Ramberg 10 January, 2013.
30/4/2010Mar CAPEANSDT Steering Board meeting White Paper R&D WP7 Facilities and Component Analysis for Detector R&D.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
CERN accelerator chain (operating and approved projects)
Proton and neutron irradiation facilities in the CERN-PS East Hall Maurice Glaser and Michael Moll CERN- PH-DT2 - Geneva - Switzerland 6 th LHC Radiation.
SPSC114 summary for EATM Lau Gatignon / EN EATM, 15 July 2014 Open Session:OPERA, ICARUS, NA63, COMPASS, CLOUD, P349 (pbar polarization) Closed Session:Neutrinos.
EXPERIMENTAL AREAS CONSOLIDATION EACONS part – early draft from comments.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
Future Irradiation Facilities at CERN Status report of the working group on future irradiation facilities at CERN
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
Muon cooling demonstration with MICE at IHEP ?
Outlook by the Physics Coordinator
June 22, 2017 Burkhard Schmidt for the DT coordination team
CERN R&D plans and Infrastructures
White Paper Theme 3 - WP7 Facilities & component analysis for detector r&d WP7 Meeting #1 Mar CAPEANS CERN PH-DT.
WP8 – Improvement and equipment of irradiation beam lines
Towards a Unified Environmental Monitoring,
SPSC123 Summary Lau Gatignon/EN-EA IEFC, 4 November 2016.
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Irradiation Facilities Questionnaire
EU Institution Board 1 representative of each participating institute
nuSTORM and the Physics Beyond Colliders workshop
CERN Testbeam facilities
Present and Future test facilities for High-intensity Targetry CERN
Beam Dump Experiments with Photon and Electron Beams
the field of Solid state Detectors This comprises
Radiation Working Group RADWG
Presentation transcript:

Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part of activities are part of PH-DT irradiation service, WP7, CERN irradiation facilities working group, AIDA  Introduction: Some facts about facilities, operation and user community  Hardware upgrades in 2009 – New irradiation tables and boxes  Long term upgrade plans:  Survey on need for future facilities at CERN  East Hall renovation plans (CERN-EN) & (our) preliminary concept of a new facility  Next steps: a) Submit proposal to the LHCC (next week), b) Secure AIDA funding and use it to get upgrade started … Outline:

CERN PS East Hall - Irradiation Facilities 24 GeV/c protons T7 & T8 beam lines in East Area  Proton irradiations (T7-line)  Direct exposure to 24 GeV/c protons (shuttle + boxes in primary area)  Flux: 1-10×10 14 p/cm 2 /hour (on 2x2cm 2 )  SEU testing field (IRRAD6)  Mixed field irradiations (T8-line)  Mixed field in cavity after carbon/lead ‘target’  ~5×10 11 n eq /hour (at 50 cm from beam axis) M.Glaser, M.Moll, PH-DT Steering Board

CERN PS Facilities – Operation 2009  Some statistics for 2009  Most complex irradiations in 2009  12 CMS ECAL & Crystal Clear scintillating crystals (get highly activated)  ATLAS silicon sensors for SLHC (cooling to low temperatures during irradiation)  Optical link system R&D for SLHC (system in operation during irradiation)  Main part of irradiations performed for  ATLAS, CMS, LHCb, RD39, RD42, RD50, RADMON, ….  Operation in 2010  expect ~150 days of operation (as in 2009), users from ATLAS, CMS, RD50, LHCB,….  3 weeks of pion beam at the PSI (~280 MeV/c.) + 1 week of setup 142 days of beam 431 object irradiated M.Glaser, M.Moll, PH-DT Steering Board

 Activities focused on equipment that could be moved into an upgraded facility  Planning and construction of new irradiation tables and cold box systems  Supported by WP7 & WP4 funding  In collaboration with facility users: Mainly ATLAS Pixel & ATLAS SCT, CMS ECAL Hardware upgrades in 2009/2010 Coldbox for ATLAS Pixel structures (WP4) inside facility (2009) with Vortex Cooling Coldbox for ATLAS SCT structures in lab with water cooling What we want: How it presently looks like: Where it has to be squeezed in: overall length: 2.15m M.Glaser, M.Moll, PH-DT Steering Board

 Survey performed by ‘Working group on future irradiation facilities at CERN’  Interdepartemental working group formed in 12/07 on request of several department heads  Web-based survey on requirements and needs for irradiation facilities: Collected > 135 forms  Details on the survey:  Conclusion: 4 complementary irradiation facilities required to cover needs Long term plans for facilities: Needs 1) Proton and ion irradiations at high energy and high density (fast extraction) 2) Gamma irradiations in the presence of a muon beam 3) Proton irradiation at high intensity (slow extraction) 4) Mixed-field irradiations with slow extraction HiRadMat GIF++  Proton Irradiation facility  Located in primary zone (limited access: stop all beam lines for access, wait for de-activation)  Limited space (Personnel exposed to radiation, difficult to scan beam over big objects, backscattered particles)  Low intensity (Should be increased if possible)  Mixed field irradiations (behind DIRAC)  No irradiation position lateral to target, limited intensity, too little space (only shuttle), parasitic to DIRAC  Proton & Mixed field facility located in different beam lines  Parallel operation of two facilities leads to competition for beam Why are the present East Hall facilities not sufficient? M.Glaser, M.Moll, PH-DT Steering Board

 After Chamonix 2010: East Hall renovation plans progressing quickly  Renovation plans presented on IEFC Workshop 2010 (L.Gatignon) with aim to implement changes in 2012 Long term plans for facilities  AIDA proposal approved including EU-funding for facility upgrade: 350 Keuros for facility and 150 Keuros for infrastructure (EU contribution) Two good reason to act now: M.Glaser, M.Moll, PH-DT Steering Board

 Presentation of AIDA proposal to IEFC - LHC injectors and experimental facility committee. (Presentation Today, Discussion with EN (R.Saban) on Monday)  Proposal to LHCC to “seek recognition of the scientific case for improved radiation facilities at CERN” in order to proceed with implementation studies and cost estimates (Proposal submitted today, presentation to LHCC on Tuesday ).  Achieve green light to sign contract on AIDA deliverables with EU and proceed towards implementation plans for new or upgraded facility.  Personally, we would hope for the following: Long term plans for facilities: Next steps Proton Facility (main user community: LHC Experiments) mixed field facility (multiple user communities: LHC machine LHC Experiments, Dosimetry (RP), MC benchmarking) M.Glaser, M.Moll, PH-DT Steering Board