Project Dragon Small Business Website Content Management System.

Slides:



Advertisements
Similar presentations
Visual Studio Online. What it Provides Visual Studio Online, based on the capabilities of Team Foundation Server with additional cloud services, is the.
Advertisements

Group 4 Project Presentation
DISC Database and Innovative Software in the Community (DISC) 1 October 9th, 2011 ARMS 1098B Design Review.
The Jukebox Orian Paz & Yair Cleper Instructor: Viktor Kulikov Semester: Spring 2009 Final Presentation.
Progress Report 11/1/01 Matt Bridges. Overview Data collection and analysis tool for web site traffic Lets website administrators know who is on their.
Interpret Application Specifications
APPLICATION DEVELOPMENT BY SYED ADNAN ALI.
Certificate in Web Applications Development. What Is A Web Application?
Getting the Most Out of Blue Mountain RAM
Louisa Lambregts, What Makes a Web Site Successful and Effective? Bottom Line... Site are successful if they meet goals/expectations.
Final Year Project Presentation E-PM: A N O NLINE P ROJECT M ANAGER By: Pankaj Goel.
Web-based Document Management System By Group 3 Xinyi Dong Matthew Downs Joshua Ferguson Sriram Gopinath Sayan Kole.
EProject: Airlines Reservation System Instructor: Do Quoc Binh Group 2: Team Member 1.Dao Tuan Huy (GC0232) 2.Le Minh Duc (GC00234) 3.Pham Huu Phuong (GC00252)
WEB329 ASP.NET: A Lap Around the New Enhancements for Web Developers in Microsoft Visual Studio 2005 Omar Khan Lead Program Manager Web Platform and Tools.
1 Team Management System (TMS) By DACCIT Pvt. Ltd., Indore.
“This presentation is for informational purposes only and may not be incorporated into a contract or agreement.”
TEAM FOUNDATION SERVER (TFS) By Sunny Niranjana Devi. M.
Reports Pro Visual User Group Nov 21 st 2007.
Open Solutions for a Changing World™ Copyright 2005, Data Access WordwideElectos June 6-9, 2005 Key Biscayne, Florida Data Access Europe BV Eddy Kleinjan,
A Scalable Application Architecture for composing News Portals on the Internet Serpil TOK, Zeki BAYRAM. Eastern MediterraneanUniversity Famagusta Famagusta.
Crystal Hoyer Program Manager IIS Team Preview of features that will be announced at MIX09 Please do not blog, take pictures or video of session.
Healthy Kids Zone Team Introduction Chad Honkofsky 2.
Software Testing Life Cycle
Copyright © 2010 Pearson Addison-Wesley. All rights reserved. Chapter 12: Introduction to ASP.NET Programming the World Wide Web 2009 Fifth Edition by.
Review Security Hardening IPTables SELinux. Today Installations and updates – Rpm command and packages Apache “Issue Ownership”
Searchlets Customer: Paul English Advisor: Prof. Ethan Bolker Team : Satish, Di, Quan
 Chapter 6 Architecture 1. What is Architecture?  Overall Structure of system  First Stage in Design process 2.
LinkWare LinkWare is a web-enabled, open platform for generation and distribution of electronic technical documentation and e–catalogues. The LinkWare.
Statistics Monitor of SPMSII Warrior Team Pu Su Heng Tan Kening Zhang.
An introduction to Microsoft Office SharePoint Server 2007 Rue Juliette Wytsmanstraat 14 | 1050 Brussels | Belgium T | F
1 ADP Algebra II End-Of-Course Online Field Test Test Administrator Training September, 2007.
Microsoft SharePoint Server 2010 for the Microsoft ASP.NET Developer Yaroslav Pentsarskyy
Project Plan for nSite Central Michael Dunn Ryan Sessions Kyle Kerrigan.
The Accidental Team Foundation Server Admin Anthony Borton ALM Trainer and Mentor QuickLearn Inc. DEV345.
By Matt Baker Eric Sprauve Stephen Cauterucio. The Problem Advisors create a sign-up sheet to be posted on the door of their office. These sign-up sheets.
Project Dragon Small Business Website Content Management System.
3TC Company e-Restaurant Project management plan lick to add Title 2 Contents Introduction add Title 1 Requirement Specifications 3 Design Description.
Grid Chemistry System Architecture Overview Akylbek Zhumabayev.
What’s new in Kentico CMS 5.0 Michal Neuwirth Product Manager Kentico Software.
UPenn is a very large school with many departments. Finding help from the right place can be confusing, responses can take a long time PennHelp’s purpose.
Product Update March Copyright © IET Ltd 2008 Agenda  Release 7.7  VerifIEr.
Project Methodology May 2, System Development Life Cycle Overview.
WEP Presentation for non-IT Steps and roles in software development 2. Skills developed in 1 st year 3. What can do a student in 1 st internship.
Process Presentation Kin Wan Li, Ashley Zoch, Mevesh Gopee, Damian Ridgwell, Edwin Lusala,
Agenda  Project Overview  Project Goal & Scope  Estimates  Deadline  Project Environment  Delivery Plan  Project Plan  Team Structure  Risk Analysis.
Adaptive Book Mark-up Repository Service. Team 10 Prof. Malu Rolden Joshua Shorrock Tammy Huynh Yuan Zhang Karun Veligeti.
Members: Trần Huy Thường Trần Mạnh Cường Đào Anh Thư Nguyễn Duy Tiến.
NovaBACKUP xSP Technical Training By: Nathan Fouarge
May06-11: ISEAGE Attack Tool Repository and Player Jeremy Brotherton, Timothy Hilby, Brett Mastbergen, Jasen Stoeker.
The basics of knowing the difference CLIENT VS. SERVER.
PROGRAMMING IN VISUAL BASIC.NET CREATING YOUR FIRST WEB APPLICATION Bilal Munir Mughal 1 Chapter-3.
Scheduler CSE 403 Project SDS Presentation. What is our project? We are building a web application to manage user’s time online User comes to our webpage.
ASP.NET WEB Applications. ASP.NET  Web application framework developed by Microsoft  Build dynamic data driven web applications and web services  Subset.
Continuous Automatic Deployments with Windows Azure, TFS Online, and Visual Studio 2012 Project management with TSF Online & the Agile Method Matt Young,
Sprint 2 Goal Collect enough log files for calculation Automate processes to extra data (user, session, byte, and error counts) and convert them into excel.
DEAL AGGREGATOR Supervisor Supervisor: Trần Đình Trí Students Students: Nguyễn Mạnh Huy Nguyễn Thanh Thủy Nguyễn Quốc Tuấn Đinh Văn Thể Đỗ Duy Việt.
HMSI Hotel Management System Integrated 01 STARTTHE IDEAPLANREQUIREM ENTS DESIGNTESTDEMO.
Supervisor: Tran Dinh Tri Group Members: Duong Ngoc Nhat-NhatDN01687 Nguyen Quang Minh-MinhNQ01717 Nguyen Quang Minh-MinhNQ01717 Duong Hoang Nam-NamDH01552.
LOGO e-Citizen. Phan Nhật Minh Phạm Thị Dinh Vũ Xuân Đông Phạm Thị Huyền Nguyễn Thùy Trang
Speed Cash System. Purpose of the Project  online Banking Transaction Information.  keeping in view of the distributed client server computing technology,
Team members: Pham Minh Ha Ly Ngoc Anh Nguyen Duc Viet Nguyen Thi Huong Supervisor: Huynh Anh Dung (Mr.)
ONLINE SHOP MANAGEMENT SYSTEM
Coach Route Searching System
DCR ARB Presentation Team 5: Tour Conductor.
CSE 403 Project SDS Presentation
Serpil TOK, Zeki BAYRAM. Eastern MediterraneanUniversity Famagusta
Paul S Waters Getting Git.
SharePoint services Provides team collaboration through SharePoint Sites and makes it easy for communities to work together on documents, tasks, contacts,
Mark Quirk Head of Technology Developer & Platform Group
Presentation transcript:

Project Dragon Small Business Website Content Management System

Team: Web Builders  Mao Hua Li  Xi Zhang  Xiaojiang Wu  Vlad Steiman

Project Overview:  Provide a website to display relative products online.  Manage website contents by Client himself  Public can access and view

Project Overview:  For Small Business  Display Products & Service  Easy to use  Not need IT background

Business Process:

1. Operator can upload or edit the contents of the web site by web browser form. 2. Public users can view all contents in the web site.

Application Project Architecture  System Diagram

Technologies Used:  Web server side Windows Server 2008 R2 IIS7.5 SQL Server 2008 R2 ASP.NET 4.0 Visual Studio 2010  Client side IE 8  Communication HTTP

Roles & Responsibility:  Project Manager: Xi Zhang  Database Administrator: Xi Zhang  Project Developer: Xiaojiang Wu  Test & QA: Maohua Li and Vlad Steiman  Documents: Maohua Li and Xi Zhang  Code Review: Maohua Li & Xiaojiang Wu  Integration: Xiaojiang Wu & Maohua Li  Monitor & Control: Xi Zhang  Document finalize and version control:Maohua Li  Communication Management: Maohua Li

Main Project Success Criteria:  Client’s products display on website.  Public user can access the website and see products.  Public user can sort the category and product list.  Operator can log into the system.  Operator can manage homepage, category and products.  All bugs had been fixed.  The delivery package will include code and document.

System Implement: Project Management  Methodology: Agile  Project backlog  Sprint backlog

System Implement: Database

System Implement: Web based UI

System Implement: Trace & Monitor Google Code

System Implement: Test  Test Cases  Document  Issue traced by Google Code

Delivering List:  Source code in zip file  Updated SSD  CRs  User book  Knowledge transfor document(s)

Lesson to Learn:  Communications  Scope control  Time management  Monitor & trace assigned work

Thank you!