960 fadc tdc 2500 fadc 3240 fadc 168 fadc tdc 192 fadc tdc 2900 tdc 11400 fadc 40 fadc start 40 fadc tdc upv 21 fadc 5 Kbytes/event x 200 KHz level 1 =

Slides:



Advertisements
Similar presentations
Preparing for the CD-2 Review Elton Smith Hall D Collaboration Meeting October 12-14, 2006.
Advertisements

GlueX Collaboration Meeting June 3-5, GeV Trigger Electronics R. Chris Cuevas 1.Hardware Status  Production Updates 2.DAq and Trigger Testing 
CHL -2 Level 1 Trigger System Fully Pipelined Custom ElectronicsDigitization Drift Chamber Pre-amp The GlueX experiment will utilize fully pipelined front.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS7: Electronics and Data Acquisition  Overview (this talk): D. Casper  Front-end.
GlueX CDC Update and Electronics Outlook Michael McCracken Carnegie Mellon University Advisor: Curtis Meyer Medium Energy Physics GlueX Electronics Meeting6-7.
SiLC Front-End Electronics LPNHE Paris March 15 th 2004.
MINER A NuMI MINER A DAQ Review 12 September 2005 D. Casper UC Irvine WBS 7.2 & 7.3: Data Acquisition D. Casper (UC Irvine)
1 WG5: MPGD related Electronics Tue. Oct. 14 th 9:00 to 12:00 W. Riegler, M. Campbell, CERN 2 nd RD51 Collaboration Meeting Paris, Mon. Oct 13 th to Wed.
Forward TOF Prototyping Ryan Mitchell GlueX Collaboration Meeting November 2005.
23 July, 2003Curtis A. Meyer1 Milestones and Manpower Curtis A. Meyer.
GlueX Collaboration Oct '06 C. Cuevas 1 Topics: Projects and Progress 250Msps Flash ADC Energy Sum Module The Bigger Picture DAQ/Electronics Work Plans.
1. 2 Outline Contract Status  Q.A. plan  construction plan Preparations for construction  populating the construction space Microscope electronics.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
A 72 Channel 125 MSPS Analog-to-Digital Converter Module for Drift Chamber Readout for the GlueX Detector G. Visser 1, D. Abbot 2, F. Barbosa 2, C. Cuevas.
GlueX electronics Collaboration Meeting May, 2004 Paul Smith.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
1 Hall D Drift Chamber ElectronicsFJ Barbosa Drift Chamber Review6-8 March 2007 Electronics for CDC and FDC Hall D 1.Motivation 2.ASIC Development 3.Preamp.
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
July 29, 2004 American Linear Collider Physics Group Victoria Linear Collider Workshop Muon Detector MAPMT Tests - Calibration R&D Scintillator Based Muon.
Combined Test Beams Definition of Combined Test Beams Why would we want them? Why we might not want them? Host laboratory issues? Experimenter issues.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
ASIC R&D at Fermilab R. Yarema October 30, Long Range Planning Committee2 ASICs are Critical to Most Detector Systems SVX4 – CDF & DO VLPC readout.
Malte Hildebrandt, PSIMEG - Review Meeting / 1   e  Drift Chambers Charge Division Test Chamber Testsetup for Cosmics Chamber Construction.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
Hall D Electronics Review (July 23-24) Elton Smith Hall D Collaboration Meeting August 4-6.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
12GeV Trigger Workshop Christopher Newport University 8 July 2009 R. Chris Cuevas Welcome! Workshop goals: 1.Review  Trigger requirements  Present hardware.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
Hall D Online Meeting 9 August 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division Mission Who’s Who.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
Budget Status and FY03 Requests Elton Smith Hall D Collaboration Meeting Sep 12-14, 2002.
A Readout System Utilizing the APV25 ASIC for the Forward GEM Tracker in STAR G. J. Visser 1, J. T. Anderson 2, B. Buck 3, A. S. Kreps 2, T. Ljubicic 4.
1 Integration and Milestones Elton Smith Hall D Detector Review October 20-22, 2004.
Slide 1Turisini M. Frontend Electronics M.Turisini, E. Cisbani, P. Musico CLAS12 RICH Technical Review, 2013 June Requirements 2.Description of.
LC Muon Detector Development Overview Hardware R&D Goals Hardware Configuration Design Issues Procurement, Engineering, Manpower Additional Development.
The May 2010 GlueX Collaboration Meeting Curtis A. Meyer Carnegie Mellon University.
CMS 1.Goal of the experiment CMS is a general purpose apparatus for LHC designed to study the physics of p-p collisions at the center-of- mass energy of.
Results From the Radphi LGD Dan Krop 12/11/03. The Radphi Experiment Radphi Experiment Took Data in Jlab Hall B From May to July Hours Of Beam.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
Working group on photon vetoes Meeting on June 7 th : 1.Status of Geant4 simulations 2.Discussion on LAV structure 3.Discussion on readout 4.News on Spaghetti.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
The Lead Glass Detector Overview, Experience and Direction.
Electronics Workshop GlueX Collaboration Meeting 28 March 2007 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Physics Division Topics: Review.
Electromagnetic Calorimeter for HADES at SIS100 Pavel Tlustý, NPI Řež Motivation Plans Current status Tests Outlook HADES Collaboration Meeting, Sesimbra,
Budget Status and FY04 Requests Elton Smith Hall D Collaboration Meeting Dec 11-13, 2003.
Tagger microscope beam test results and readiness for construction what we learned from construction of the prototype and the parasitic beam tests in Hall.
CLAS12 Central Detector Meeting, Saclay, 3 Dec MVT Read-Out Architecture & MVT / SVT Integration Issues Irakli MANDJAVIDZE.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
Simulation and reconstruction of CLAS12 Electromagnetic Calorimeter in GSIM12 S. Stepanyan (JLAB), N. Dashyan (YerPhI) CLAS12 Detector workshop, February.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Status of the Baikal-GVD experiment
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
High-Resolution Micromegas Telescope for Pion- and Muon-Tracking
KRB proposal (Read Board of Kyiv group)
LNF - Beam Test Facility Apr. 28 – May 03
GlueX Flash ADCs 3425 PMT channels Forward, Barrel Calorimeters
CLAS12 Timing Calibration
Commissioning of the ALICE-PHOS trigger
Electronics and DAQ Summary
ASPID (Application of Silicon Photomultipliers to Imaging Detectors)
LC Muon Detector Development Overview
Presentation transcript:

960 fadc tdc 2500 fadc 3240 fadc 168 fadc tdc 192 fadc tdc 2900 tdc fadc 40 fadc start 40 fadc tdc upv 21 fadc 5 Kbytes/event x 200 KHz level 1 = 1 Gbyte/second Electronics Channels Deadtimeless Paul Smith Indiana University

3 types of FADCs? 8 bits, 250 MSPS10-12 bits, 125 MSPS8-12 bits, 62.5 MSPS 4000 channels3240 channels11,400 channels Calorimeters -energy sum Central Tracking Forward Drift Cathodes Other PMT/SiPMTdE/dX low density high density low cost

Indiana University

FCAL Cockcroft-Walton PMT base RadPhi E852 GlueX 100 Prototypes constructed at IU Selective assembly robot

Andy Lankford (UC Irvine), Glenn Young (ORNL), and John Domingo(JLab) GlueX Electronics Review - July

Selected Review Conclusions:...characteristics are sound and appropriate choices for GlueX The decision to standardize all detector readout on a single TDC module design and a single Flash ADC module design is good, and will help simplify the overall electronics system design in a constructive way and conserve valuable engineering resources. The Committee feels that it is desirable to locate these modules in a radiation-free area if possible, in order to improve access. Although the GlueX electronics design parameters (e.g. data rates) exceed current JLab experiments, they do not exceed the performance of other contemporary experiments. More manpower will be needed in order to fully realize the GlueX electronics system. Considerable special (technical) expertise will also be required. The requirements and specifications of the analog front-end electronics are not yet adequately defined. This is coupled to the tentative status of some detector designs. The lack of full definition of detector designs may soon limit progress on electronics design... ✓ ✓ ✓ !

TAGUPVSTCCDCFDCBCALCKOVTOFFCAL PMT? SiPM? Disc PMT? SiPM? Pream p PMT? SiPM? Disc Pream p Disc SiPM Disc Pream p Disc CW PMT base FADC TDC Energy Sum Track Count Energy Sum Track Count Energy Sum Track Count “good” shape R&D in progress need further definition Detector: On-detector Electronics: L1 Trigger: Digitizer: Status Paul Smith Indiana University GlueX detector review October 24, 2004