Wholesale Revenue Metering Standard - Hardware November 2003.

Slides:



Advertisements
Similar presentations
METAL CAN SURFACE COATING MACT COMPLIANCE ASSURANCE 40 CFR PART 63, SUBPART KKKK June 2006 June CFR PART 63, SUBPART KKKK June 2006 June 2006.
Advertisements

Course Material Overview of Process Safety Compliance with Standards
CIP Cyber Security – Security Management Controls
Revenue Metering. 2 The Settlements Process Transfer Funds $ $ Invoice Participants Reconcile Markets Gather and Process Metering Data.
EHMA bofcon Bo Frank Consulting June 2005 European requirements and practice in heat metering by Bo Frank EHMA.
Today’s Meeting There are approximately 25 people killed by electricity per year in Australia (average for the last 7 years), 700 people are hospitalised.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
Conference on Voluntary Pension System- August 11, ROLE OF TRUSTEE IN PROTECTING THE PENSION FUND UNDER THE VOLUNTARY PENSION SYSTEM (VPS) AND OTHER.
FIRE PUMP ELECTRICAL CONFIGURATIONS UNDER 600 VOLTS.
Texas Department of Insurance State Fire Marshall’s Office Sixth Report on State University Fire Safety January 2002.
The ISO 9002 Quality Assurance Management System
LOCKOUT/TAGOUT.
Lecture 8. Quality Assurance/Quality Control The Islamic University of Gaza- Environmental Engineering Department Environmental Measurements (EENV 4244)
Quality Assurance/Quality Control Policy
TRANSACTION AND INDUSTRY REVIEW CONFERENCE NIGERIAN POWER SECTOR REFORM: AN OVERVIEW OF TCN AGREEMENTS.
Blondel Compliance. Update to IMO Wholesale Revenue Metering Standard V2.0 Section Considerations for non-Blondel Meter Installations a. 3 CT’s.
Ted “Smitty” Smith  This slide show contains multiple timed questions. All questions can be answered using the International Fire Code, The National.
1 Training on Procurement Procedure 23 rd Review Meeting of State FCs- Bhopal ( ) Annexure ‘W’
CONTROL OF HAZARDOUS ENERGY LOCKOUT/ TAGOUT PROGRAM.
Standards and Standardization. Standard Levels Standards preside according to the level. Their effect, image and their scope of work change from one level.
Concepts of Database Management Eighth Edition
Roadway Lighting on TxDOT Right of Way Greg Jones, EIT Master Electrician, State of Texas TxDOT, Traffic Operations Division, Illumination Branch.
Overview of the EU Food Safety Requirements
W. A D V I K. RU Introduction materials. W. A D V I K. RU Lines of activity General contracting; Telecommunication; Engineering; Security; Construction.
Metering Modification to T&S code Cathal Kearney Protection & Metering 15/04/2015.
WPPI – Member Reliability Standards Compliance 2007 APPA National Conference Given by Mike Stuart June 25, 2007.
Techair – we take care On the other side of the 337 what your client does when he gets a mod and how we can produce better mods to help him John Aplin.
Chapter 01: Introduction to Network Security. Network  A Network is the inter-connection of communications media, connectivity equipment, and electronic.
Owner/Operator Responsibilities in Aircraft Maintenance & TSO’s and PMA’s Aircraft Owners and Operators Jim Niehoff – FAA Safety Team.
Electricity Compressed Air Steam Hydraulic Pressure Gas Lines etc.
SIGNAMAX WARRANTY SYSTEM. Signamax Warranty Types Signamax Connectivity Systems offers its customers a versatile system of component and system warranties.
Life cycle services for automation products
Franchise Fees, what are they all about?. What is a franchise fee?
Signamax™ Cabling System Review Revision E. INTRODUCTION.
New Form Approval Process. Background New Process is effective April 1, 2014 Published in the March 2014 Cities and Towns Bulletin, pages 7 and 8 Changes.
1 COMPUTER LAB REGULATION
Facts About the Energy Industry  By 2015, 35 percent of the workforce (approximately 200,000 high-skill, high- wage workers) may need to be replaced.
Purpose NEW BEAM DUMP TUNNEL Launch Safety Agreement - conventional aspects LIU-SPS external beam dump meeting - C. Colloca DGS/SEE LSA conventional.
Electrical Safety Authority
Chapter 1 Replacing Power Supplies Prepared by: Khurram N. Shamsi.
CABLING SYSTEM WARRANTY REGISTRATION. PURPOSE OF CABLING REGISTRATION.
IMO Compliance Process. Compliance Market Rules and Standards Chapter 3: Empowers and obligates IMO “Enforcement” Section 6.1.1: “monitor, assess and.
MINISTRY OF FINANCE OF THE REPUBLIC OF TAJIKISTAN.
COMET Working Group Progress Report. Purpose of Report Provide Team Updates Potential Future Voting Items Draft Competitive Meter Ownership Timeline.
SAFETY SERVICES PROVISION I. Bejar Alonso. Transfer Executive Safety Tasks from SC to Departments In application of the document “Safety policy at CERN”
1 Lt Col Joanne Sechrest Mgr, Priority Telecommunications Branch DHS/IAIP, National Communications System DHS/IAIP, National Communications
Technical Assistance Office TCP Projects 2005 Contractual and Financial Management Administrative and Financial Handbook Prepared by IA, 14/12/2001 SOCRATES.
KIRBY MORGAN SUPERLITE DEEP SEA DIVING HELMET MODELS 17A/B, 17C, 17K, 27, KM-37, 47, 57, 77 SUPERVISORS IN-WATER CHECKS APPENDIX A2.5.
An introduction to… Lockout Tagout. Aim Every year thousands of workers get killed or injured while performing repairs or maintenance on industrial equipment.
ISO 9001:2015 Subject: Quality Management System Clause 8 - Operation
Presented by John Lewandowski and Mike Larabel Inspection, Testing, and Maintenance of Kitchen Hood Systems Michigan Fire Inspectors Society Winter Educational.
Laboratory equipment Dr. W. Huisman Cairo, November 21th 2012.
Chapter 3 PHYSICAL INJURY AND CONTROLS 3.2 Electrical Safety
LOCKOOUT/TAGOUT THE ULTIMATE GOAL IS: To implement policies and procedures to prevent, as necessary, the release of hazardous energy from power sources--or.
Cross Connection Survey Training
Agreement Management & Historical Data
Administration of a FIDIC Contract - Commencement Date to + 28 Days -
Energy Control (Lockout/Tagout)
Installation-Troubleshooting-Maintenance
Concept of ACSF TAN (Type Approval Number)
AIRWORTHINESS OF AIRCRAFT
CHAPTER 6 Tools and Equipment.
Introduction to building contract
General Requirements of NFPA 101
Prepare for Contract Turnover
Water Meter Protector Set
Operations and Maintenance
HDV CO2 certification CoP provisions
Lock Out Tag Out.
Receiving Inspection on incoming goods
Presentation transcript:

Wholesale Revenue Metering Standard - Hardware November 2003

Meter Enclosure All meters, test links, and fuses shall be contained within a meter enclosure. The communication equipment, such as an external modem or a telephone line switcher, may be located in a separate locked enclosure under strict control of the MMP provided that the equipment is supplied from an external power source; … otherwise the communication equipment shall be contained in the meter enclosure New Installations

Meter Enclosure - New MI (continued) Meter Enclosure Requirements : Secured and sealed by MSP, in a manner approved by IMO Accessible to MSP at all times… not accessible to others Seals to be placed to ensure detection of unauthorized access to IT connections, meter, test links, test-link cover and fuses Seals individually numbered, …traceable to the MSP

Market Rules Chapter 6 - Appendix 6.1 Metering Obligations Metering Service Providers

MSP Obligations The following activities shall be performed by registered MSPs the provision, installation, commissioning, maintenance, repair, replacement, inspection and testing of metering installations the registration of metering installations with the IMO and the preparation of all meter point documentation and other [support]documentation … for registration; and the resolution of trouble calls relating to metering installations and metering data in accordance with sections and of this Appendix.

MSP Obligations The registered MSP has the responsibility to ensure all the requirements of section are satisfied. Some MSP function related activities could be performed by contractors, MMPs, etc. The MSP cannot delegate this responsibility. ***

MSP Obligations Sample activities related to the provision, installation, maintenance, repair, replacement, but not registration of MI, commissioning of the MI, inspection & testing of MI, and resolution of MTRs are: Provision and installation of ITs, meters, meter enclosures, test blocks, communications, cabling. Maintenance, repair and replacement of metering equipment and MI.