Duck Pond Landfill 3100 Blk. of National City Blvd. National City, CA 9195037-AA-0017 Photos by Anthony TorresPage 1 of 3 June 26, 2013 The Volkswagen.

Slides:



Advertisements
Similar presentations
MBTA Groundwater Action Plan Dr. Steve J. Poulos, P.E.
Advertisements

Parks and Recreation Commission Meeting April 10, 2006 Thunderbird Conservation Park Update.
Edwardsport IGCC Mine Stabilization Project Construction at the Largest Remediation Mine Grouting Project in North America Presented by: Howard Concrete.
Handling Hazmat During Construction WisDOT NCR Construction Conference March 7, 2013 Shar TeBeest, DTSD Bureau of Technical Services or
Duck Pond Landfill 3100 Blk. of National City Blvd. National City, CA AA-0017 Photo by Anthony TorresPage 1 of 4 September 12, 2012 One of two.
Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
Redwoods National Park. Elk Camp Site. Looking from north toward south.
Observations of Water Table Levels in Assumption Creek and at the South Edge of the Seminary Fen Sam Wetterlin 11/1/13.
Click to continue…. Railroad Track wetland Image Date: December 2003.
Second Phase Metropolis Towers Chromium Cleanup Presentation to Residents September 4, 2013.
Claremore Medical Office Building From Landfill to Medical Office Building A Brownfield Success Story THE GREEN SIDE OF BROWNFIELD REMEDIATION.
4.5 Pounds of Trash are produced Per Person Per Day Where Does our Trash Go? 27% Recycled 16% Burned 57% Landfilled Nationally: 31% Recycled 69% Landfilled.
At 4620 square miles, Lane County, Oregon is nearly as large as the State of Connecticut and is home to some 336,000 residents. Short Mountain Landfill,
NATIONAL SOLID WASTE MANAGEMENT PROGRAMME RIVERTON LANDFILL.
Lamby Way Croeso!. The rubbish arrives and the trucks are weighed to find out the weight of the rubbish. All of the rubbish will end up in one of three.
Every block of stone has a statue inside it, and it is the task of the sculptor to discover it. ~ Michelangelo Presented By: Dallas Whitmill, P.E.
Student Objectives Use the information gained to make responsible choices in selecting everyday products and services using scientific information Evaluate.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
Georgia underground marking standards
Plot Plans & Legal Descriptions. Site or Plot Plans  A plot or site is an area of land generally one lot or construction site in size  The term plot.
CERTIFICATE 4 IN BUILDING BCGBC4004A. General Notes  Site clearing billed in m 2 & includes trees ≤0.5 m girth measured 0.5 m above ground  Tree removal.
LANDFILL PROFILING FOR GAS, LIQUIDS AND VACUUM & ENHANCED STEAM BIOREACTORS STI Engineering By Reg Renaud.
Mark Strong, P.E. CH2M HILL Christopher Bozzini, P.E. CH2M HILL
PESTICIDE and HERBICIDE PRACTICES  Limit soil erosion by planting vegetation on bare areas and using mulch or matting for landscaped areas. CONCLUSION.
Muskegon Wastewater Treatment Facility
Landscape Design & Details
Environmental Assessment Inspection Presented by: Environmental Science Period 9 Class Eagle Environmental, Inc.
Recently installed spill way to restrict water flow to the lower level of Lake Terrace drive. The grate is completely covered with debris. This appears.
SPRINGVILLE CITY WATER TANK AND WELL PROJECT WILLIAM GARNER, JEREMY FOWLER, AUSTIN JASPER The city of Springville has been experiencing a period of rapid.
AN INTRODUCTION TO: from the leading resource for education and information in the repair industry... TECHNICAL GUIDELINE S Guideline for Design, Installation,
THE GRAMERCY RESIDENCES CONSTRUCTION UPDATES Century Properties May 2009.
CONSTRUCTION UPDATE The Knightsbridge Residences at Century City Century Properties - July 2009.
DE03XC W 13 Mile Road, Birmingham, MI , Access: Gate Code /11/12 Walked by; C&S Engineers – Alan MacPherson,
Newport Terrace Landfill (Continuous Gas Monitoring System)
1 August 12, 2014 Surety Risk Assessment Utility Pipeline Failure Case History – Tyndall, SD Presented by: American Concrete Pipe Association Scott Hofer.
November 16, 2007 APPLEVIEW PROPOSAL Why It’s Not For Our Community 140 Units, 9 Story Condo 140 Units, 9 Story Condo, North Bergen.
Target facilities (buildings) First floor of the building Second floor of the building Building for filtering process 14 Building for drum washing process.
4.5 Pounds of Trash are produced Per Person Per Day Where Does our Trash Go? 27% Recycled 16% Burned 57% Landfilled Nationally: 31% Recycled 69% Landfilled.
Brownfields Odell Zeigler, Katie Dilbeck, Shirley Green, Genarde Garnica.
Adams-14 School District Facilities Master Plan Kearney Middle School Focused Site Evaluation SITE DRAINAGE OBSERVATIONS General – Site drainage was primarily.
Residential Construction Unit 2- Site Work and Concrete Mr. Todzia.
Graphic Communication
Looking east to Park Street Old tennis court area, looking south.
DAVIE LANDFILL Banu Sizirici. MAPS Vista View Park (Davie Landfill)
1 Design of a wastewater collection Network and a Water Distribution Network for Azmut using SewerCAD and WaterCAD Prepared By: Mohammad noor Shawer Ayman.
Extractive Industry Workshop Morgantown Planning Commission Monday, February 20, :00 PM Council Chambers.
San Simeon Earthquake Ground Deformation Photos by California Geological Survey.
38th ½ Street Improvements (between Grayson and Airport) Group 10: Jordan Alvarez Emily Tat Charles Yamashiro.
Visit recycle-more.co.uk to: find where to recycle your waste electrical goods find free practical and detailed recycling advice each year in the UK we.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Disclaimer: This is for informational purposes only, the Board is not advocating any particular position Forming an LID Cost Estimate of the LID Additional.
Maps. The World Political  Political maps show how people have divided places on the Earth into countries, states, cities.
Projection, Distortion, Map Quadrants & Sandalwood Map Learning Objectives – Student understands map projection & distortion – Student understands map.
Dealing with waste Part II - Incinerators. D18 Explain the short- and long-term impacts of landfills and incineration of waste materials on the quality.
Ramona Landfill Photos showing contaminated processed green waste that has been applied to the northwest slope of the landfill Photos taken by Stephen.
Otay Landfill Inc Maxwell Road Chula Vista, CA AA-0010 Photos by Anthony TorresPage 1 of 3 May 29, 2012 An approximate four foot hole was.
San Marcos Landfill 1595 Questhaven Rd. San Marcos, CA AA-0008 Photos by Anthony Torres Page 1 of 3 October 3, 2012 The gravel bags leading to.
165 Partners, LLC. ALR Westgate Development-The Landings Russell County August 30, 2011 DP.
Vectors 1 -The Concept of Vectors
Upland Landfill Waste Discharge Application 7295 Gold River Highway
MOBILE, ALABAMA.
NORTH TRUNK SEWER REPLACEMENT PROJECT
Average person produces 1700 lbs of MSW per year
Private Septic Systems
Private Septic Systems
Landfill Disposal.
MOBILE, ALABAMA.
Construction Jeopardy
Commission Agenda Item # 17
North Carolina's Selective Vegetation Removal.
Presentation transcript:

Duck Pond Landfill 3100 Blk. of National City Blvd. National City, CA AA-0017 Photos by Anthony TorresPage 1 of 3 June 26, 2013 The Volkswagen dealership was in the process of making preparations to remove the structure with an arrow for the addition of a new structure that would extend northward. The dealership facility entrance had been reconfigured and was moved north onto the City of National City easement which is believed to contain buried waste along the northwest boundary. The easement was observed covered with new asphalt and concrete. 1 N

Duck Pond Landfill 3100 Blk. of National City Blvd. National City, CA AA-0017 Photos by Anthony TorresPage 2 of 3 June 26, 2013 An electrical pipe repair had been made in what appears to be within the City of National City easement. A inch excavation was observed for repairs made to an electrical conduit. A new electrical pipe had been installed within the existing electrical PVC piping. The trajectory of the electrical piping appears to travel towards the disposal site boundary. Photo #2 was taken looking southeast. 2

Duck Pond Landfill 3100 Blk. of National City Blvd. National City, CA AA-0017 Photos by Anthony TorresPage 3 of 3 June 26, 2013 A hole approximately 12 inches in length, four inches wide and 12 inches deep has developed near the trash bin located at the cabinet shop on the Hancock property. An RKI Eagle combustible gas indicator was used to measure landfill gas above the surface and measured 120ppm. Photo #3 was taken looking east. 3