Pasadena Water and Power City of Pasadena 2015 Urban Water Management Plan Public Hearing City Council – June 13, 2016 Item 12.

Slides:



Advertisements
Similar presentations
Current Legal Developments on Ratemaking - A Primer on Budget-based Water Rate Structures 1 Paul D. Jones II, P.E. General Manager, Eastern.
Advertisements

THE EXPANDING ROLE of RECYCLED WATER The Need, Benefits and Cost Effectiveness Make Recycled Water an Increasingly Valued Resource Harry Ehrlich, SDA Principal.
Stakeholder Workshop July 27, Present updated information on the Central Groundwater Storage Plan Receive additional stakeholder input Discuss next.
Water Conservation in the San Diego Region Bill Jacoby San Diego County Water Authority North Bay Water Association April 2, 2004.
Pasadena Water and Power 1 Water Supply Update and Water Conservation Plan Open Space Commission June 8, 2009.
When in Drought- Conserve! Madeline Ward City of Santa Barbara Acting Water Conservation Coordinator.
Energy Efficiency Recent Updates and Highlights Prepared by Eileen Hearty, Project Manager Office of Asset Management – Denver Multifamily Hub.
Las Virgenes Municipal Water District Water Supply and Drought Response: Getting Serious about Water Use Westhills HOA June 17, 2015.
Water Conservation and Drought Planning Jennifer Allis Texas Commission on Environmental Quality Water Availability Division Resource Protection Team.
Park Water Company Water Shortage Contingency Plan June 3, 2015.
Municipal and Industrial Conservation and Water Reuse Workgroup Elizabeth Lovsted Sr. Civil Engineer Urban Water Institute Annual Water Policy Conference.
Department of Public Works Zero Waste Strategic Plan October 20, 2014.
Department of Public Works Non-Exclusive Solid Waste Collection Franchise System – Review April 28, 2014.
Western Municipal Water District Pam Pavela. Western MWD background Mission: To provide water supply, wastewater disposal, and water resource management.
Water Conservation on a Larger Scale Mary Ann Dickinson Executive Director California Urban Water Conservation Council September 28, 2006.
2 nd Public Meeting - Options March 30, Agenda  Overview of Water Issues  What is a WIRP?  Purpose of WIRP  Evaluation Process  WIRP Objectives.
1 Improving Analytical Capabilities of the California Water Plan Rich Juricich, California Dept. of Water Resources.
Proposed DRAFT New City Ordinance for Water Use in Landscaped Areas Public Meeting September 15, 2009.
Water Supply Planning Initiative State Water Commission November 22, 2004.
Systematic Municipal Water Use Accounting and GPCD Calculations John W. Longworth, P.E. -- Chief Water Use and Conservation Bureau NM Office of the State.
Conservation Action Committee April 17, 2014 Drought Watch 2014 Lake Oroville, 2014.
National Capital Region Climate Change Report Presentation for the Bowie City Council Stuart A. Freudberg Director, Environmental Programs Metropolitan.
Water Use Efficiency Implementation: Lessons Learned in California Tom Peters Mary Lou Cotton.
LADWP WATER CONSERVATION IEPR Workshop August
2014 IRWM Drought Grants Sierra Water Workgroup Summit June Tracie L. Billington Department of Water Resources Financial Assistance Branch.
 Nicole Capretz Director of Policy Councilmember Ed Harris WORKING DRAFT Climate Action Plan City of San Diego.
City of Renton, WA Water Use Efficiency Margaret Ales PNWS – AWWA CONFERENCE MAY 1, 2008 Copyright © 2008 by R. W. Beck, Inc. All Rights Reserved. Opportunities,
STATE OF OREGON WATER EFFICIENCY STANDARDS PNWS-AWWA Conference Eugene, Oregon May 2014 Lisa Jaramillo Water Right Services Division Oregon Water Resources.
Department of Transportation City Council August 31, 2015 Annual Self Certification Congestion Management Program for Los Angeles County.
Pasadena Water and Power Public Hearing Date Water Capital Improvement Charge Pasadena City Council Meeting November 16, 2015 Agenda Item #13.
Water Supply Planning A Legal Overview Edward J. Casey Weston Benshoof Rochefort Rubalcava & MacCuish 333 South Hope Street, 16 th Floor Los Angeles, California.
SBx7-7 The New Terrain Chris Brown Greening Our Water Infrastructure Petaluma April 9, 2010.
Oakdale Irrigation District Agricultural Water Management Plan Briefing on 2015 Update January 5, /5/2016 OID AWMP Update Briefing.
WELCOME! 2015 Urban Water Management Plan Workshop.
Town of Discovery Bay Community Services District Public Hearing to Review and Adopt the 2010 Urban Water Management Plan January 6, 2016.
1 Adrianne Carr Senior Water Resources Specialist Bay Area Water Supply and Conservation Agency April 15, 2015 “A multicounty agency authorized to plan.
Pasadena Water and Power Public Hearing Water Capital Improvement Charge Pasadena City Council Meeting January 11, 2016 Item #12.
An Overview of Other Ongoing DWR Programs. Other Programs Turf and Toilet Rebates Model Water Efficient Landscape Ordinance Leak Detection Desalination.
Building New and Sustainable Water Resources for Los Angeles Urban Water Institute Spring Conference February 2016 February 2016 Martin L. Adams, P.E.
Pasadena Water and Power Level 4 Water Supply Shortage Plan Public Hearing Presented by Gary Takara, Principal Engineer City Council - Item #12 January.
Urban Water Management Plan (UWMP) City of Patterson’s April 19, 2016.
Pasadena Water & Power Integrated Resource Planning “IRP” April 18, 2016 Leesa Nayudu, Resource Planning Manager.
Irrigation with AMR Proposition 84 Drought Round Grant Irrigation with Automated Meter Reading Project Grant Agreement with Association of Bay Area Governments.
Presentation Overview EECAP summary Plan development process GHG inventory results Policy recommendations EAP implementation.
Pasadena Water and Power Set 01/25/2016 Public Hearing Date to Consider Temporary Implementation of the Level 4 Water Supply Shortage Plan December 14,
1 EASTERN MUNICIPAL WATER DISTRICT Water Use Efficiency Master Plan Elizabeth Lovsted, PE Senior Civil Engineer January 16, 2016.
Pasadena Water and Power Contract with Opower: Behavioral Energy Efficiency and Customer Engagement Program Services Pasadena City Council June 6, 2016.
Southern California Water Dialogue September 23, 2015.
Vicki Lake, Unit SupervisorContra Costa Climate Leaders Workshop Division of Statewide Water Management May 9, 2016
Pasadena Water and Power Temporary Level 4 Water Supply Shortage Plan Public Hearing City Council - January 25, 2016 Item 17.
Water Conservation in the San Joaquin Valley Mary Lou Cotton, C.C.P.
Metropolitan North Georgia Water Planning District DRAFT Water Resource Management Plan Review
City Council February 6, 2017 Item 9
Water Efficiency Ordinance ZCA No. 750
Drought Management Update
2015 Urban Water Management Plan Overview
Conservation Programs: Current and Proposed
La Mesa Climate Action Plan Supplemental Environmental Impact Report Scoping Meeting May 31, 2017.
Elizabeth Lovsted, P.E. February 15, 2017
City Council August 28, 2017 Item 11
Non-Exclusive Solid Waste Franchise Renewals
PUBLIC HEARING: ESTABLISH A 20% WATER CONSERVATION TARGET AND IMPLEMENT LEVEL 1 WATER SUPPLY SHORTAGE PLAN March 27, 2017 Item 9.
Matthew S. Dickens Resource Conservation Manager
Model Water Efficient Landscape Ordinance
Drought Planning Through Integrated Rate Design
Urban Water Use Efficiency Policy-2016 and Beyond
City Council September 17, 2018 Item 16
Paul D. Jones II, P.E., General Manager August 25, 2016
NARUC Winter Policy Summit
Water scarcity and droughts
Presentation transcript:

Pasadena Water and Power City of Pasadena 2015 Urban Water Management Plan Public Hearing City Council – June 13, 2016 Item 12

Pasadena Water and Power Urban Water Management Plan Ensures long-term water resource planning  Analyzes projected water use vs. water supply over the next 20 years Required by law to be prepared every 5 years  Urban water suppliers >3,000 AFY or >3,000 customers Contents address CWC requirements; follows DWR Guidelines 2

Pasadena Water and Power 3 Information Included in UWMP The 2015 UWMP includes:  Water system description  System water use  System supplies  Water supply reliability  Water shortage contingency plan  Demand management measures  Climate change impacts  NEW Report of Water System Loss  NEW Voluntary Energy Used for Water Supply

Pasadena Water and Power 4 Water Integrated Resources Plan Adopted January 2011 Basis for 2010 UWMP Resource document/policy basis for 2015 UWMP Provides long-term water supply and resource strategy  Through the year 2035  Establishes preferred water resource portfolio of supply and conservation options  Phased implementation strategy

Pasadena Water and Power Current Water Use By Customer class 2015 Actual Water Use = 27,326 AF = 8,904 MG By Sector: 5

Pasadena Water and Power Water Use Projections Forecasts consistent with data from:  UWMP Act  MWD IRP and 2015 UWMP  Pasadena General Plan Methodology:  Land Use-based:  Single family units x water use factor  Multi-family x water use factor  Commercial/industrial x duty factor  City uses  Water losses + authorized non-revenue (9% of total) 6

Pasadena Water and Power Water Supplies Current supply is 60% imported and 40% groundwater MWD primary sources:  State Water Project  Colorado River Aqueduct Groundwater rights and spreading credits Water resource projects to increase local supply and offset demand for imported water:  Non-potable Water Project  Arroyo Seco Canyon Project 7

Pasadena Water and Power Supplies Included in Analysis 8

Pasadena Water and Power Supply and Demand Balance Analysis for normal year, single dry-year, and multiple dry- years per UWMP guidelines. 9

Pasadena Water and Power Supply and Demand Balance 10

Pasadena Water and Power 2020 Supply/Demand Balance 11

Pasadena Water and Power 12 SB X7-7 Water Use Targets Pasadena’s baseline per capita water use (recalculated for 2015 UWMP) = total water demand/population SB X7-7 Water Use Targets: *Projected range depending on assumptions for water conservation and projected non-potable water supplies. Target Reduction from Baseline Target Avg. Water Use (GPCD) Current/ Projected Use (GPCD) Reduction from Baseline Baseline ( ) __ % ~ 30% 2020 Target 20% *---

Pasadena Water and Power Required Elements/Timeline Coordinate preparation with other agencies  Notification letters sent April 7th to affected cities and LA County Draft UWMP for public review at since April 22, Public Hearing  City Council adoption after public hearing Deadline to submit to DWR: July 1,

Pasadena Water and Power Action Items 1.CEQA exemption pursuant to State Guidelines Section 15282(v) 2.Adopt a resolution approving the 2015 UWMP. 14

Pasadena Water and Power Backup Slides 15

Pasadena Water and Power Water Loss Audit New requirement for 2015 UWMP Compares production data (volume in) vs. distribution (out) Categorizes distributed water as:  Authorized  Loss Losses include:  Apparent losses from meter inaccuracies, unauthorized consumption, data handling errors  Real losses. Estimated to be 1,061 AF, <4% of total 16

Pasadena Water and Power PWP Water Conservation Current Programs Water Waste Enforcement Program Greywater Laundry-to–Landscape (L2L) Program  Selected to receive $100,000 Federal Grant for program expansion Residential and Commercial Incentive Programs Drought Tolerant Landscape Program  5 Step Plan for Creating a Drought Tolerant Landscape - Online  Landscape Design Ideas and Plans  Turf Removal and Drip Irrigation Direct Install for Income Qualified Customers Water Use Surveys for Residential and Commercial Customers Water & Energy Direct Install Program (WEDIP) Multifamily Retrofit Program  PWP Distributed over 56,000 Devices  93% of all MF Properties in Compliance  Annual Savings of 225 AF; Lifetime Savings of 2,250 AF Fire Stations Drought Tolerant Demonstration Gardens Program Workshops  Creating Drought Tolerant Landscapes  Edible Gardens  Efficient Irrigation Systems  Greywater Education Programs More Information about current programs at

Pasadena Water and Power PWP Water Conservation Programs – In Development Online Water School (May 2016) Home Water Reports (July 2016) SMART Controller Residential Direct Install Pilot Program (June 2016) Sub-Metering Pilot Program (Summer 2016) Drought Tolerant Demonstration Garden Grant Program (2017) Expanded Greywater Direct Install Program (July 2016) 18

Pasadena Water and Power Climate Change State Water Project and Colorado River Aqueduct highly susceptible. Supplies anticipated to decrease. At local level, projected rise in temperature, but conflicting projections for precipitation. DWR recently released guidance for future consistent analysis. Will allow PWP to factor impacts to the supply- demand balance. 19

Pasadena Water and Power Energy Intensity Voluntary reporting for 2015 Energy Intensity = Total energy/volume of water Estimates for carbon intensity can be used in the future for Pasadena’s Climate Action Plan 20

Pasadena Water and Power Outreach MSC presentation February 23 and May 10. EAC presentation April 12. Consideration at May 10 meeting. Star News publication of Public Hearing Notice on April 22 and 29. PWP website PWP e-newsletter CM Newsletter 21