In-Kind Strategy Integrated Control Systems Garry Trahern Head of ICS Division www.europeanspallationsource.se TAC 9, 3 rd April, 2014, ESS, Lund.

Slides:



Advertisements
Similar presentations
The Iowa Medicaid Enterprise
Advertisements

RAMIRI2 Prague 2012 Project management and the RI Life Cycle.
ESS Timing System Plans and Requirements Timo Korhonen Chief Engineer, Integrated Control System Division May 19, 2014.
Status of the European Spallation Source Timo Korhonen Chief Engineer, Integrated Control System Division October 21, 2014.
ESS Cryogenic System Design
CD FY08 Tactical Plan Status FY08 Tactical Plan Status Report for Network Operations & Administration Rick Finnegan April 22, 2008.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
12 Enterprise and Global Management of e-Business Technology.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
ORGANISATION OF EASTERN CARIBBEAN STATES ELECTRONIC GOVERNMENT FOR REGIONAL INTEGRATION PROJECT KARLENE FRANCIS, PROJECT MANAGER.
Managing Accelerator Quality Matthew Conlon 13 April 2015.
© Dr. John T. Whiting All Rights Reserved Slide 1 Information Technology – The Key to Public Education Reform Based.
J. G. Weisend II Deputy Head of Accelerator Projects April 2, 2014 Actions at ACCSYS Resulting from the Recommendations of the Annual Review.
Enterprise and Global Management of e-Business Technology
Project Plan. Project Plan Components Project Overview – Description and Strategy Business Case Summary Key Deliverables and Scope Critical Success Factors.
The European Spallation Source Control System
Author: KTH 1 Workpackage 8 Version 1b KTH Accreditation of Management processes in relation to pedagogical processes.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
Project Initiation at The Regence Group 12/19/2015John Garrigues1.
Configuration Management Romuald Duperrier Head of Systems Engineering Division April 22, 2015.
Neutron Chopper Technologies Work Package
Accelerator/program Mats Lindroos Head of accelerator April 21, 2015.
ICS re-planning, outsourcing/inhouse development strategy and staffing TAC 12 presentation Henrik Carling ESS/ICS Date:
H. Danared | Cryomodule Workshop | Page 1 The In-Kind Process at ESS Håkan Danared Lund, 15 October 2014.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
1 What’s Happening on the ILC Controls Front at FNAL Margaret Votava Fermilab January 9th, 2006.
Data Management and Software Centre Mark Hagen Head of DMSC IKON7, September 15th 2014.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Status report on ICS interfaces (Accelerator, Target, NSS, CF) and related activities Miha Reščič Deputy Project Manager, ICS
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
ESS Machine protection review Welcome Henrik Carling ESS/ICS Date:
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
ESS Integrated Control System Software Core Components S.Gysin
Personnel Safety Systems Stuart Birch Senior Engineer, Personnel Safety Systems November 6 th, 2014.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Accelerator/Technical Documentation and Breakdown Structure Dr. Felix Schlander Lead Engineer 20 April
ESS (vacuum) control system Daniel Piso Controls Division February 20, 2013.
Daniel Piso Fernández Some Ideas about Integration Support Cases and PLC Activities at Controls Division.
Instrument Construction Phase 1 and beyond Rob Connatser Chief Instrument Project Engineer September, 2014.
Accelerator Systems Integration Stephen Molloy Section Leader for Accelerator Integration April, 2016.
Installation and Commisioning SE view point Romuald Duperrier ESS SE manager.
Operations WBS Dictionary Integrated Control Systems Henrik Carling ESS/ICS Date:
ACCSYS Design Reviews J. G. Weisend II Deputy Head of Accelerator Projects.
Integrated Control Systems Status and Plans Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund.
Slides for TAC meeting Oct/2015 Marcelo juni Ferreira Vacuum section leader October,
Controls Software Developer - Summer workers The Machine Directorate at the European Spallation Source (ESS) in Lund, Sweden, invites applications for.
Cryomodule test stand at ESS site
Process Control System Requirements
ESS RF Development at Uppsala University
Advanced Research Electron Accelerator Laboratory
Project Phases ‘98 ‘00 ‘02 ‘04 ‘06 Preparatory Phase
ESS Project Status Roland Garoby – Technical Director August 2018.
Way of working with ICS HWI Hardware and Integration
Plan for controls with the digital platform
ICS update 7th Experiment Control Workshop
ESS Main Control Room & ICS Infrastructure
Testing Coordination at ESS
European Spallation Source ERIC Procurement
The Survival Plan.
SAMPLE COST ROLL-UP Sample OVERALL COST ROLL-UP
Bunker Project Schedule/Budget
Licensing update ESHAC #7, October 2017
Hector Novella Deputy project manager
Status of the ESS High Power RF Systems
Atefeh Sadeghzadeh Control engineer – Target safety and control
Charge and Agenda of the 18th TAC meeting
Vacuum Control System for Monolith Vacuum
Presentation transcript:

In-Kind Strategy Integrated Control Systems Garry Trahern Head of ICS Division TAC 9, 3 rd April, 2014, ESS, Lund

Overview ICS IKC Strategy IKC potential for Construction phase Expected IKC for 2014, 2015 Constraints on IKC for Controls 2

ICS IKC Strategy ICS is a matrix organisation – Horizontal: Core components (Hardware and Software) Control System Infrastructure – Vertical:Integration Support (Integration of devices, databases, services and applications) ICS IKC can only be – Horizontal:Development of a component or system – Vertical:Integration of a device or system NOT ICS IKC – Requirements – Design – Acceptance – Support 3

IKC potential for Construction phase Where to find possible ICS IKC: – Most of effort over asymptotic staff level of 40 persons – Most of HW procurement 4 WBS CodeWBS NameBudget (€) In Kind Potential (%) 14Integrated Control Systems 2014-EOC72,825, Management & Administration4,669, Applications6,514, Software Core Components8,469, Hardware Core Components6,989, Protection Core Components9,186, Equipment12,257, Control System Infrastructure4,552, Physics1,727, Accelerator integration support6,711, Target integration support1,675, Instruments integration support2,763, Conventional Facilities integrations support2,332, Test stands integration support1,875,56070

IKC potential for Construction phase ICS IKC Summary: – IKC split per horizontal and vertical activities 5 DirectionCategory name Budget (€)In Kind Potential (%) HorizontalCore Components € 32,887, VerticalIntegration support € 15,359, HorizontalCS Infrastructure € 4,552, VerticalEquipment € 12,257,

Expected ICS IKC for 2014, – No IKC activities planned 2015 – Total IKC value: €  Accelerator integration support €  Timing system integration €  Control box deliveries €  PSS integration € -There is some flexibility to arrange schedule of activities to make more (or less) IKC available in

Constraints on IKC for Controls EPICS based deliverables Control Box acceptance policy Single PLC platform supported 7