1 Single Entry Model (SEM) Go-Live Update TAC Update August 6, 2009.

Slides:



Advertisements
Similar presentations
June 26, 2008 TAC Texas Nodal Market Implementation: Program Update Jerry Sullivan.
Advertisements

1 TSP Nodal Engagement Market Participant Call ERCOT August 04, 2010.
June 12, 2008 ROS SEM Go-Live procedure Linda Clarke.
MyFloridaMarketPlace CRB Meeting
1 Single Entry Model (SEM) Weekly Market Call August 13, 2009 Matt Mereness.
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
MP Online Data Entry Project Update WMS / ROS August 2013 Troy Anderson.
1 Single Entry Model (SEM) Weekly Market Call September 3, 2009 Matt Mereness.
1 Market Trials Outage Scheduling Weekly Update July 23, 2010.
1 Single Entry Model (SEM) Weekly Market Call August 06, 2009 Carrie Tucker.
1 Single Entry Model (SEM) Go-Live Update ROS Update July 16, 2009.
Lead from the front Texas Nodal 1 Single-Entry Model Milestone Status Report May 1, 2008.
1 Market Trials Outage Scheduling Weekly Update July 09, 2010.
EDS 2 Early Delivery Systems Review and Request for Approval May 2007 John Webb.
March 20, 2008 TPTF CIM Update Raj Chudgar Program Director for Market Redesign.
TSP WebEx Conference Call Mar 24, Antitrust Admonition 1. Explanation of Validation of Network Model 2. Explanation of Metric.
June 27, 2008 NDSWG ERCOT and TSP activities discussion for SEM Go-Live.
1 Single Entry Model (SEM) Go-Live Update for NIT June 22, 2009 Matt Mereness.
Texas Nodal 1 Nodal Operations Model Posting Confirmation TAC May 7, 2009 Matt Mereness, ERCOT.
TPTF Meeting Texas Nodal Program Update Market Readiness Metrics Update Chris Wilkinson PMO.
1 Nodal Single Entry Model (SEM) Go-Live WMS Update May 18, 2009.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window Aug 14, 2009.
1 Market Trials Outage Scheduling Weekly Update June 25, 2010.
1 Single Entry Model (SEM) Weekly Market Call July 23, 2009 Matt Mereness.
July 7, 2008 TPTF Texas Nodal Market Implementation: - Program Update - Market Readiness Update Jerry Sullivan.
Lead from the front Texas Nodal 1 Integrated ERCOT Readiness and Transition (IRT) TPTF - November 6 th, 2006.
1 TSP Nodal Engagement Market Participant Call ERCOT July 14, 2010.
Option 2 Summary Wes Woitt CenterPoint Energy 2010 SSWG Chair.
1 Single Entry Model (SEM) Market Kick-off Call May 28, 2009 Matt Mereness.
1 TSP Nodal Engagement Market Participant Call ERCOT September 15, 2010.
1 Single Entry Model (SEM) Go-Live NATF Update July 28, 2009 Matt Mereness.
February 12, 2009 ROS ERCOT and TSP activities for Planning Model Go-Live.
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
1 Single Entry Model (SEM) Go-Live Update Special TAC Meeting (Updated) August 18, 2009.
1 Single Entry Model (SEM) Weekly Market Call June 4, 2009 Matt Mereness.
Nodal Program Update Mike Cleary Sr. VP and Chief Technology Officer.
August 25, 2008 TPTF Nodal Status Report: Integrated Schedule Update Change Control Update Adam Martinez Troy Anderson.
1 Market Trials Outage Scheduling Weekly Update August 20, 2010.
TPTF CIM Health Check Raj Chudgar Program Director for Market Redesign.
1 Single Entry Model (SEM) Weekly Market Call September 10, 2009 Matt Mereness.
1 Single Entry Model (SEM) Weekly Market Call June 11, 2009 Matt Mereness.
February 3, 2011 TAC ERCOT Planning Go-Live Update Jay Teixeira Manager, Model Administration.
1 Single Entry Model (SEM) Weekly Market Call September 17, 2009 Matt Mereness.
Lead from the front Texas Nodal 1 Registration Update to TPTF Patrick Coon / Matt Mereness August 13 th, 2007.
1 Nodal Update for: Single Entry Model (SEM) Go-Live Transition NDSWG May 19, 2009 Matt Mereness.
1 Market Trials Outage Scheduling Weekly Update August 13, 2010.
1 TSP Nodal Engagement Market Participant Call ERCOT April 21, 2010.
1 TSP Nodal Engagement Market Participant Call ERCOT June 16, 2010.
1 Cutover Market Call November 27, 2010.
Texas Nodal 1 Nodal Operations Model Posting NATF Sep 29, 2009 Matt Mereness, ERCOT.
1 Single Entry Model (SEM) Weekly Market Call August 27, 2009 Matt Mereness.
1 Single Entry Model (SEM) Weekly Market Call July 2, 2009 Matt Mereness.
Lead from the front Texas Nodal 1 EDS 4 Outage Scheduler EDS Market Call April 25, 2008.
1 Market Trials Open Market Participant Call Weekly Kick Off Aug 09, 2010.
Lead from the front Texas Nodal 1 Registration Market Call June Data Collection Window June 05, 2009.
1 Single Entry Model (SEM) Weekly Market Call July 16, 2009 Matt Mereness.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Network Operations Model Go-Live Decision Kenneth Ragsdale TAC July 1, 2010.
October 2, 2008 TAC Texas Nodal Market Implementation: Program Update Ron Hinsley.
January 3, 2008 TAC Meeting Texas Nodal Program Update Jerry Sullivan.
Lead from the front Texas Nodal 1 MP10 / MP11 Registration Data Update Oct 14, 2008 TPTF.
June 5, 2008 TAC Texas Nodal Market Implementation Program Update Jerry Sullivan.
Lead from the front Texas Nodal 1 EDS Market Call Weekly Update Feb 06, 2009.
1 Single Entry Model (SEM) Weekly Market Call August 20, 2009 Matt Mereness.
1 Market Trials Outage Scheduling Qualifications Weekly Update March 26, 2010.
1 Single Entry Model (SEM) Go-Live TAC Update May 7, 2009.
Lead from the front Texas Nodal 1 Texas Nodal EDS4 - Approach 11/28/2007.
Market Trials Update NATF March 2,
September Protocol Transition Plan
Presentation transcript:

1 Single Entry Model (SEM) Go-Live Update TAC Update August 6, 2009

2 SEM Go-Live Summary of current SEM activities Market engagement summary ERCOT and Market Criteria Status for Go-Live Aug 31, 2009 Market Readiness Criteria approval consideration (possible vote) Appendix –What is SEM Go-Live? –Market Engagement/Communications –Training Update –Transition summary during June – August 2009 –Next steps

3 Summary of current SEM Activities Market/TSP engagement calendar for Single Entry Model Implementation –May 28- SEM Market Kick-off Call –June 4- Began weekly ERCOT/TSP market calls for SEM –June 8- ERCOT deployed test system for TSP testing on schedule –June 23- Training commenced on schedule 6-weeks of 3-day classes –July 30- Training complete –We are here - August stakeholder meetings –August 31- SEM Go-Live milestone Stakeholder communications –ERCOT has reported detailed progress on testing and training to market on SEM Weekly calls, NDSWG/ROS, NATF, and TAC ERCOT activity highlights –On-going support of testing/training/questions/weekly-calls –Converting final copy of 6/1/2009 of zonal operations model into nodal model –Confirming consumption of model into NMMS/EMS/MMS test systems –Nodal integration testing aligned to use post-SEM Go-Live model

4 SEM Go-Live Market Engagement Dashboard (as of 6/30/09)

5 SEM Go-Live Market Engagement Dashboard (as of 7/30/2009)

6 Market engagement summary (continued) Excellent TSP engagement over the summer –10-weeks of market calls (calls to continue through go-live) –8 weeks of ad-hoc system testing by TSPs –6 weeks of instructor led training for 19 different TSPs is complete –No severity 1 or 2 defects identified by the market –All 20 TSPs engaged that will be responsible for ERCOT network modeling –Working one TSP to catch-up on training TSP plans to attend training after SEM Go-Live ERCOT will support this TSP (and any other TSP) with coordinating submission of NOMCRs

7 Overall SEM Go-Live ERCOT/Market Criteria Dashboard

8 August implementation activity summary Engagement will shift gears from training to cut-over activities: –TSP coordination for access to production systems –ERCOT completes analysis and posting of key artifacts/analysis CIM Audit, Consistency Check, Rules Validation Final versions of user support documentation Modeling Guidelines final review at NDSWG Posting of CIM schema and data dictionary How-to for granting access to systems –ERCOT to continue to test systems and ensure Service Level Agreements met 99.9% availability of system 4 hour recovery time Support 25 concurrent modeling users Stress testing to continue focus on system performance –July 31 Market notice sent reminding TSPs that no modeling Service Requests should be submitted after Aug 15 to allow synchronization of models Emergency modeling changes will be accepted with approval from System Operations Director

SEM Go-Live Approval of Market Readiness Criteria 9

10 SEM Go-Live Criteria and Approval Summary of remaining Stakeholder meeting dates for SEM discussion/approval of Go-Live –August –30-day Market Notice - Aug 1 –NDSWG (key SEM stakeholders) - Aug 4 –TAC - Aug 6 –ROS - Aug 13 –ERCOT publishes results and sign-off from Directors – Aug 17 –Potential TAC Aug 17 (if deemed necessary) –BOD - Aug 18 –10-day Market Notice - Aug 21 –SEM Go-Live - Aug 31 –TAC can consider whether “Certification that all Market Readiness Criteria have been met” –All training complete, and plans in place to support one TSP –Remaining activities are for ERCOT to complete/sign-off model analysis –Note that no protocol changes go into effect Aug 31 (system change only)

11 APPENDIX What is SEM Go-Live? Training Update Transition summary during June – August 2009

12 SEM Go-Live Overview Single Entry Model (SEM) Go-Live is the switchover on Aug 31, 2009 for TSP submissions of network operations model change requests –from “Service Request” submissions via TML –to “NOMCR” submissions via the NMMS System of record for model changes becomes NOMCRs on 8/31//09 System of record for Network operations Model for reliability and dispatch remains Zonal/Genesys system until Dec 2010 TSP Current Activity Submit Modeling Change via Service Request ERCOT Uploads Svc Request into Zonal Genesys Model ERCOT Copies/Converts Zonal Model “seed” Into Nodal NMMS Model TSP Aug 31, 2009 Submit Modeling Change via NOMCR/NMMS Tool (includes ICCP) ERCOT Incrementally Converts NOMCR Into Svc Req Uploads into Zonal Genesys Model ERCOT uploads NOMCR Into Nodal NMMS Model to support nodal testing Data Consistency Checks are run to ensure model synchronization/fidelity Periodic checks are run to ensure model synchronization/fidelity Full Copy Incr. NOMCR

13 Current Network Operations Model Maintenance for TSPs ERCOT Zonal EMMS Model (system of record through 12/1/2010) Submits Service Request to Change Model ERCOT Nodal NMMS Model (nodal testing model- CIM file for EMS/MMS/etc) Periodic full copy and conversion of model (zonal seed used for nodal systems) TSP

14 After 8/31/2009: SEM Go-Live Network Operations Model Maintenance for TSP ERCOT Zonal EMMS Model (system of record through 12/1/2010) ERCOT Nodal NMMS Model (nodal testing model- CIM file for EMS/MMS/etc) ERCOT enters NOMCRs into zonal model ERCOT runs consistency checks to ensure models are aligned and maintained Submits Model Change Request (NOMCR) TSP NMMS Model System of Record Nodal Go-Live 12/1/2010

15 Network Operations Model Maintenance for Resource & QSE (today and post 8/31/09) ERCOT Zonal EMMS Model (system of record through 12/1/2010) ERCOT Nodal NMMS Model (nodal testing model- CIM file for EMS/MMS/etc) ERCOT enters into zonal model NMMS Model System of Record Nodal Go-Live 12/1/2010 Submits RARF (Resource Asset Reg Form) via Service Request Submits ICCP Change via Service Request ERCOT process QSE RE

16 Training Update TSP Testing and Training environments will be the same Testing system access –Available June 8 – Aug 10 –NOMCR testing system will be on-line and available to all TSPs –ERCOT will established dedicated and have staff available to support questions Instructor Led Training to be hosted in Taylor –Pre-SEM classes June 22 – Aug 3 Current plans for at least six 3-day sessions Planning for seats for each class Large dedicated training room –Post-SEM classes Sept 23- Oct 20 Fewer sessions and smaller classes (tbd) Make-up classes, not just-in-time training for all staff after go-live

17 Transition summary during June-Aug’09 –Currently no limits on submissions (Market Notice sent March 5) “… to clarify that there are no restrictions or “freezes” currently in place limiting network model change submissions via the service request process.” –Transition periods: June 1- Aug 30, 2009 (objective to minimize SvcReq during this period) –No equipment name changes (defer until after SEM Go-Live 8/31/09) –Submit changes as far in advance as possible Aug 15-30, 2009 –Two weeks no submissions, except for emergency changes Aug 31, Feb 2010 (NOMCRs for any/all network changes) –Initially the NOMCR timeline will align with zonal timeline »NOMCRs received and translated to zonal model change »30-day lead-time, compliant with current zonal database schedulezonal database schedule »Status is tracked and communicated via system s –SRs that did not go into zonal production will be converted to NOMCRs for verification and submission by TSPs in Sept –TSP gradually transitions to NodalProtocols(3.10) 90-day reqts