5 th Spanish Workshop on Future Accelerators IFIC, Valencia Oct. 2010 I. Vila IFCA (CSIC-UC) Advanced European Infrastructures for Detectors at Accelerators.

Slides:



Advertisements
Similar presentations
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
Advertisements

Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
SG Det IA 2007 oct29 Alain Blondel ECFA study groups BENE (in CARE) Int'l Scoping Study (ISS) Steering group (EU): A.Blondel (Geneva) P.Soler (Glasgow)
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
SiTRA brief status report to the EUDET S.C., August 31 st 2009 Members: Helsinki University and VTT(Helsinki), LPHNE-UPMC/CNRS-IN2P3 (Paris), Charles University.
Johann Zmeskal, Stefan Meyer Institute for subatomic Physics Vienna, Austria INPC 2010, Vancouver JointGEM Project Status Report 3 rd JointGEM Meeting.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement AIDA status report.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement L. Serin LAL/IN2P3/CNRS.
Tobias Haas DESY 7 November 2006 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET Pixel Telescope Pixel Telescope.
L. Serin LAL/Orsay/IN2P3 EUDET Meeting01/10/101 Organization & status of the project EUDET  LC activities in AIDA Conclusion
1 EUDET Kick-off Meeting Summary and Outlook Where are we now and where do we go from here? Joachim Mnich DESY
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Communication.
ATTRACT is a proposal for an EU-funded R&D programme as part of H2020 for sensor, imaging and related computing (ICT) development Its purpose is to demonstrate.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
TALENT Status and Future 16/07/14H.Pernegger, M.Capeans1.
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE Data Acquisition for EUDET Example: JRA1 DAQ Daniel Haas DPNC Genève LCWS Hamburg Outline EUDET JRA1.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
EuCARD Number of partners : 40 beneficiaries (12 countries) Total cost ~ 50 M€ (requested EC contribution: ~15 M€) Coordinator : J.-P. Koutchouk (CERN)
SLHC – PP Management Plan April 3 rd, 2008 M. Capeans, M. Ropka CERN April 3, 20081M.C.
1 HiGrade Kick-off Welcome to DESY Hamburg Zeuthen.
WP9.4 baseline deliverable summary 10 December 2014 Thomas Bergauer (HEPHY Vienna)
1 Advanced European Infrastructures for Detectors at Accelerators Generalities on FP7 IA call Context of AIDA call AIDA Work Package description Schedule.
Status of QUACO project
DESY Photon Science XFEL official start of project: 5 June 2007 FLASH upgrade to 1 GeV done, cool down started PETRA III construction started 2 July 2007.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
L. Serin LAL/IN2P3/CNRS March 26th AIDA-2 proposal Reminder of targeted call in H2020 (shown at Feb 17 th meeting) Organization Status of Trans.
CERN HR Department Strategy, Management and Development DT2 News Summer Students Presentations: Henrik Friis Dam 'Characterization of Scintillating Fibres.
S.Stapnes1 European Detector R&D and FP7 - background  Two CN (Construction of New Infrastructures – support for preparatory phase – including some detector.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
1 EUDET Summary and Outlook Joachim Mnich Annual Meeting 2007 Palaiseau, October 10th Outline:  Summary and Outlook EUDET  Introdution to FP7 discussion.
Introduction JRA1 Meeting, Hamburg January 30 th 2008 Ingrid-Maria Gregor DESY.
7 December 2007CERN-EU Office1 Svet Stavrev Office of EU Relations, CERN First FP7 Call for Integrating Activity projects*  IA as support to existing.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement L. Serin CNRS/IN2P3.
FP7 – DEVDET Proposal EUVIF: the vertical integration facility Ingrid-Maria Gregor, DESY ILC Vertex Workshop ILC Vertex Workshop April 2008 Villa.
1 EUDET Report on Management & Summary Transnational Access Felix Sefkow DESY Annual Meeting 2009 October 20, 2009 Outline:  Management Summary  Annual.
Atlas Software May, 2000 K.Amako Status of Geant4 Physics Validation Atlas Software Week 10 May, Katsuya Amako (KEK)
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.
EUDET meeting 21/10/09 1 Advanced European Infrastructures for Detectors at Accelerators Generalities on FP7 Infrastructure Activity call Context of AIDA.
RISE Proposal. Acronym: JEPIF: Japan-Europe Physics at Intensity Frontier ??? Merge WP 1 & 3 ? – Sell as cross-fertilization and networking of flavour.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement L. Serin CNRS/IN2P3.
7. Feb 2012 Thomas Bergauer (HEPHY Vienna) WP9.4 Status AIDA WP9.4 meeting.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
RD42 Status Report W. Trischuk for the RD42 Collaboration LHCC Meeting – June 12, 2013 Development of CVD Diamond Tracking Detectors for Experiments at.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
KA12 Marcel Demarteau Fermilab DOE Site Visit August 23,
Summary of modifications for WP3 TIARA preparation meeting; May 2010 Removed Sub-tasks:  Remove ‘Identification of Accelerator Research Areas’ (WP3.1.1.
AIDA organization WP1: Project management and communication Laurent Serin, LAL-CNRS (scientific coordinator) Ties Benhke, DESY & Paul Soler, Glasgow university,
4-5 January 2006Jan Timmermans - Introduction1 EUDET JRA2 Brainstorming meeting 4-5 January 2006 Jan Timmermans NIKHEF.
New EU FP7 I3 call Identifier: FP7-INFRASTRUCTURES
CERN R&D plans and Infrastructures
Accelerator Research and Innovation for European Science and Society
6th Spanish Workshop on Future Accelerators Granada May 2011
WP microelectronics and interconnections
Extended Steering Committee Meeting
European Detector R&D and FP7 - Outline
European Detector R&D: AIDA
Working for a detector project: A message from AIDA
AIDA WP12.2 : Detector Characterization Facilities EMC characterization Fernando Arteche.
Granular calorimeters Infrastructure
EU Institution Board 1 representative of each participating institute
AMICI WP1 – Management, coordination and dissemination
AIDA++ * Next Steps * Working Title for the AIDA-2020 Follow-up
Presentation transcript:

5 th Spanish Workshop on Future Accelerators IFIC, Valencia Oct I. Vila IFCA (CSIC-UC) Advanced European Infrastructures for Detectors at Accelerators

_Outline — News and current status — AIDA basics — Work Packages — Organization — Spanish contribution. — Outlook I. Vila, 5th Workshop on Future Accelerators, Valencia Oct. 26th 20102

Highlights (for the impatient ) — In our last workshop (December 2009) the proposal was just submitted to the EC. — AIDA proposal obtained (March 2010) a excellent rank 14.5/15 by the EU referees (we did it!) BUT requested budget reduced from 10 M€ to 8M€. — Annex 1 DoW submitted, May 2010 negotiation starts. — July 2010 Partner amends UH out, KIT in, GPF sent. — Today, still waiting (Since September) for a reply from our EU officer with all the modifications we have to do before the signature of the GA. 3I. Vila, 5th Workshop on Future Accelerators, Valencia Oct. 26th 2010

Highlights (2) — AIDA will start February 1 st — Kick-off meeting February 16 th to 18 th — Many pre-kick-off meetings are happening right now focused on several tasks and subtasks. — Most of the consortia used in TIARA (FP7 project in negotiation in June) have been rejected. We are expecting to face the same problems  Some consortia will have to be split in individual partners 4I. Vila, 5th Workshop on Future Accelerators, Valencia Oct. 26th 2010

AIDA Basics — The AIDA project promoted by the RECFA Coordination Group for Detector R&D in FP7 to comply with European Strategy for EPP. — Responds to the FP7-INFRASTRUCTURES call from the European Commission.FP7-INFRASTRUCTURES — AIDA addresses “existing” key infrastructures required for the development of detectors for future particle physics experiments. — AIDA targets User communities SLHC, ILC, accelerator-driven neutrino facilities or Super-B. 5I. Vila, 5th Workshop on Future Accelerators, Valencia Oct. 26th 2010

AIDA Basics (2) — AIDA appears as a continuation of the EUDET I3 FP6 project with a much wider scope beyond the ILC. — Infrastructure call inside de Capacities program of the FP7. — Combination of collaborative project (RTD) and coordination and support actions (CSA) for integrating activities: JRA, TA, NA. — As IA project must: _ provide wider and more efficiente access to the “existing” Research infrastructures (RI) _ Better integration in the operation of the RI. 6I. Vila, 5th Workshop on Future Accelerators, Valencia Oct. 26th 2010

7EUDET Meeting 01 /1 0/ 10 Work Packages

Work Package Coordinators WP1 : S. Stavrev (CERN) + L. Serin (LAL/Orsay) WP2 : F. Gaede (DESY) + P. Mato (CERN) WP3 : H.G Moser (MPI) + V. Re (INFN-Pavia) WP4 : S. Stapnes (CERN & Oslo) WP5 : I. Gregor (DESY) WP6 : H. Breuker (CERN) WP7 : M. Mikuz (JSI Ljubjana) WP8 : M. Moll (CERN) WP9 : M. Vos (Valencia) + V. Boudry (LLR) Management team AIDA coordinator : L. Serin (LAL/ORSAY) Deputy AIDA coordinators : T. Benke (DESY) P. Soler (Glasgow) Administrative coordinator :S. Stavrev (CERN) 8I. Vila, 5th Workshop on Future Accelerators, Valencia Oct. 26th 2010

Organization 9I. Vila, 5th Workshop on Future Accelerators, Valencia Oct. 26th 2010 EUDET Meeting 01/10/10 To be set up at kick-off meeting Chairman to be elected at kick-off meeting > 70 institutes

Partners and Beneficiaries  32 beneficiaries representing more than 70 Institutes If need to split some consortia, will become more than 50 beneficiaries : can be done but larger administrative overhead work for management... Might keep consortia internally in AIDA to centralize information/reports in each country 10I. Vila, 5th Workshop on Future Accelerators, Valencia Oct. 26th 2010 Beneficiaries Associate partners

After first negotiation stage 11I. Vila, 5th Workshop on Future Accelerators, Valencia Oct. 26th 2010 Activity Proposal NegotiationReduction WP1 : Management 450 k€ 350 k€ -33 % WP2 : Common software tools 1098 k€ 906 k€ % WP3 : µelectronics & interconnection 1096 k€ 918k€ % WP4 : Relation with industry 300 k€ 120k€ -60 % WP5 : DESY testbeam 100 k€ - WP6 : CERN testbeam 150 k€ - WP7 : European irradiation facilities 600 k€ 550k€ -8.3 % WP8: Improvement of irradiation & beam lines 3140 k€ 2324k€ % WP9 : Advanced infrastructure for detector R&D 3066 k€ 2582k€ %

Negotation main changes WP1 : Additional free manpower from IN2P3/CNRS WP2 : Small reduction of scope of a few tasks on reconstruction WP3 : Mainly unchanged but with small increase of contribution from partners. WP4 : Strong reduction but still keep the WP (42 months only). Might be the starting point of a new proposal to EU. Reduce the technologies to prospect and reduce workshop to AIDA annual meeting. WP5 and WP6 unchanged WP7 : small uniform reduction WP8 : Main reduction from CERN priority and removal of some tasks WP9 : Reduction keeping the scope of the WP with larger — contributions of partners 12I. Vila, 5th Workshop on Future Accelerators, Valencia Oct. 26th 2010

WP3: µelectronics and interconnection — Strong involvement of LHC community on 3D technology for pixel detectors but expect synergy/collaborative work with LC-pixel/CMOS activity : via-last option as complementary approach to the 3D/Fermilab approach (via-first) 13I. Vila, 5th Workshop on Future Accelerators, Valencia Oct. 26th 2010 EC-FUNDEDTOTAL CNM50K€194.6K€ UB10K€46.4K€

WP8.5 General Infrastructure for TB and Irradiation facilities 14I. Vila, 5th Workshop on Future Accelerators, Valencia Oct. 26th 2010 EC-FUNDED (K€)TOTAL (k€) IFIC30122

WP9.3 Precise Pixel Detectors 15I. Vila, 5th Workshop on Future Accelerators, Valencia Oct. 26th 2010 Task leader: I. Gregor (also DESY contact) Second task leader + CERN contact to be defined The main deliverable is an extremely precise beam telescope for characterization of prototypes (based primarily at CERN NA) Catering to sLHC needs: CO2 cooling plant, fast read-out Deliverable : Integrated telescope arm (T0+37), Complemented by infrastructure for high precision thermo- mechanical characterization (at DESY) (deliverable T0+33) MIMOSA telescope 1  m precision TimePix telescope 1 ns precision ATLAS B-layer upgrade - LHC timing Use state of the art devices to satisfy both LC/LHC requirements EC-FUNDED (K€) TOTAL (k€) IFIC IFCA USC IFAE2685

WP9.3 Silicon Tracking — Providing multi-layer Si -strip coverage for the calorimeter stack of WP9.5, precise entry point as a reference for study of overlapping showers — Task leader: Thomas Bergauer (HEPHY Vienna) — Spain is the main partner of this task. 16I. Vila, 5th Workshop on Future Accelerators, Valencia Oct. 26th 2010 ATLAS SCT module EC-FUNDED (K€) TOTAL (k€) IFIC47185 IFCA47184 UB35123 CNM2297

WP9.5 High Granularity Calorimetry 17I. Vila, 5th Workshop on Future Accelerators, Valencia Oct. 26th Task leader: Felix Sefkow (DESY) Provide versatile calorimetric infrastructures to test detecting media T0+40 Reusing and extending the development made in EUDET to build an integrated precision set-up with pixel hodoscope, pre-calo silicon strip layers and an extended EM calorimeter and a hadronic radiator (Fe, W) structure a luminosity calorimeter structure with tungsten radiator and read-out electronics in which many types of sensors can be tested and their response compared to simulation. Inter-pad gap in ECAL one μ-Megas m² The EUDET ECAL A 3D profile of a 10 GeV pion in a Fe-Scint calorimeter Sensor for the LumiCal EC-FUNDED (K€)TOTAL (k€) CIEMAT2690

Outlook — In brief, AIDA: 2250 PM (47 FTE) effort with a 27 M€ budget, (8M€ EC contribution) aiming to improve the R&D key infrastructures. — Spanish contribution 178 PM (4 FTE), total budget 1.6 M€ ( 0.4M€ EC contribution). — It is about infrastructure BUT in the implementation to achieve the deliverables relies the “actual” R&D interest. — Please keep in mind :AIDA has already de facto started pre-kick-off meetings are happening right now, we should prepare now for providing initial content to the WP task where we are involved. 18I. Vila, 5th Workshop on Future Accelerators, Valencia Oct. 26th 2010