DataGrid and CrossGrid Helpdesk CERN, 30th October 2002 EDG WP6 meeting Sophie Nicoud (CNRS-Marseille) and José Salt (IFIC-Valencia)

Slides:



Advertisements
Similar presentations
Cultural Heritage in REGional NETworks REGNET Report on Content Group Meeting Extended Project Management Group Meeting
Advertisements

SupportCenter Plus Product Overview. Overview 1.What is SupportCenter Plus (SCP) 2.Benefits of SCP 3.Licensing & Pricing 4.Questions.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
CARICOM. Ninth EDF Project Caribbean Integration Support Programme (CISP ) Statistics Component 34th MEETING OF THE STANDING COMMITTEE OF CARIBBEAN STATISTICIANS.
1 Arizona Grade 8 Science Online Field Test Test Administrator Training March 23 – April 2, 2007.
27-29 September 2002CrossGrid Workshop LINZ1 USE CASES (Task 3.5 Test and Integration) Santiago González de la Hoz CrossGrid Workshop at Linz,
Lecture 2b: Software Project Management CSCI102 - Introduction to Information Technology B ITCS905 - Fundamentals of Information Technology.
Chapter 3: The Project Management Process Groups
Software Development Models: Waterfall and Spiral Sung Hee Park Department of Mathematics and Computer Science Virginia State University August 21, 2012.
SQA Architecture Software Quality.
U-Mail System Design Specification Joseph Woo, Chris Hacking, Alex Benson, Elliott Conant, Alex Meng, Michael Ratanapintha April 28,
DataGrid is a project funded by the European Commission under contract IST rd EU Review – 19-20/02/2004 DataGrid Quality Assurance On behalf.
Ivan Dontsov, Andy Phenix, Maureen Rottschaefer. Agenda  Status  Demo  Lessons Learned.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Global Customer Partnership Council Forum | 2008 | November 18 1IBM - GCPC MeetingIBM - GCPC Meeting IBM Lotus® Sametime® Meeting Server Deployment and.
Portal User Group Meeting June 29, Agenda Introduction (Angela Taetz) Ulogin (Mario Mezzio) Database Breakup (Mario Mezzio) New Help Desk Forms.
Introduction to Interactive Media The Interactive Media Development Process.
Oguzhan Sireci Turkey WMO CBS WORKSHOP ON RADAR DATA EXCHANGE April April 2013 R EPORT ON THE STATUS OF WMO R ADAR D ATABASE AND RECOMMENDATIONS.
TG Projects status Nikos Houssos euroCRIS Board meeting Prague, 06 June 2012.
Crossgrid kick-off meeting, Cracow, March 2002 Santiago González de la Hoz, IFIC1 Task 3.5 Test and Integration (
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
EGEE is a project funded by the European Union under contract IST Testing processes Leanne Guy Testing activity manager JRA1 All hands meeting,
November 30, 2004 Topics of Discussion Mariela –Introduction –Stage1: Planning Tammy –Stage 2: Analysis Alex –Stage 3: Design Rachael –Stage 4: Construction.
1 INTEROP WP1: Knowledge Map Michaël Petit (U. of Namur) January 19 th 2004 Updated description of tasks after INTEROP Kickoff Meeting, Bordeaux.
Report on IPC-related IT systems 47th session of the IPC Committee of Experts Geneva April 16, 2015 Patrick Fiévet Head of IT Systems Section.
LHCb planning for DataGRID testbed0 Eric van Herwijnen Thursday, 10 may 2001.
APATE CS 501 Presentation 1 03/08/2007 Presented by William Cheng Yan Zhang Rodney Eng Connie Wong.
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
Report on TTonT By: Jan Rozema. Contents Historical overview Status (at PFAC-02) Terms of Reference How to go onward.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
GGUS at PEB – –- page 1 LCG Klaus-Peter Mickel, GridKa Karlsruhe LCG-PEB-Meeting ( ) The Global Grid User Support Model (Report of GDB.
DataGRID Testbed Enlargement EDG Retreat Chavannes, august 2002 Fabio HERNANDEZ
Proposal of interface between GUS + Call Center and Experiments GDB Meeting – Klaus-Peter Mickel GridKa Karlsruhe.
CSC USI Meeting 8 October 26, Designing the Perfect Phone™ Meet as design teams this evening Interim design report due by 9:00 p.m. EDT.
Project Management Inspections and Reviews 1 February.
2-Sep-02D.P.Kelsey, WP6 CA, Budapest1 WP6 CA report Budapest 2 Sep 2002 David Kelsey CLRC/RAL, UK
NFP/Eionet meeting, October 2014, EEA PAN NFP/Eionet coordination European Environment Agency (EEA) Key points and actions Bratislava, Slovakia,
LCG CERN David Foster LCG WP4 Meeting 20 th June 2002 LCG Project Status WP4 Meeting Presentation David Foster IT/LCG 20 June 2002.
INFSO-RI Enabling Grids for E-sciencE NRENs & Grids Workshop Relations between EGEE & NRENs Mathieu Goutelle (CNRS UREC) EGEE-SA2.
CERES-2012 Deliverables Architecture and system overview 21 November 2011 Updated: 12 February
User Support Sophie Nicoud PTB, April 10th 2002.
WP7 Security Coordination 23/24 Jan 2002 David Kelsey CLRC/RAL, UK
INFSO-RI SA2 ETICS2 first Review Valerio Venturi INFN Bruxelles, 3 April 2009 Infrastructure Support.
11-May-01D.P.Kelsey, Security Update1 GRID Security Update David Kelsey CLRC/RAL, UK
EMI INFSO-RI Testbed for project continuous Integration Danilo Dongiovanni (INFN-CNAF) -SA2.6 Task Leader Jozef Cernak(UPJŠ, Kosice, Slovakia)
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The Dashboard for Operations Cyril L’Orphelin.
U.S. Department of Agriculture eGovernment Program eAuthentication Initiative eAuthentication Solution Screens Review Meeting October 7, 2003.
Scuola Grid - Martina Franca, Thursday 08 November Il Sistema di Supporto INFNGrid & GGUS ( Global Grid User.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks GOCDB4 Gilles Mathieu, RAL-STFC, UK An introduction.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Regional Helpdesk GRNET Example Gkamas Vasileios NGI_GRNET User Support Team.
Lesson Objectives 1) Review the steps involved in problem solving 2) Review the stages of the System Life Cycle 3) Describe what prototyping is and the.
Workflow: Update and program proposal The Workflow Steering Committee November 1 st, 2006 Steve Lutter, Assistant Director CIT/IS.
Current status and next steps
Working in Groups in Canvas
SCEC Drupal Website Development Overview and Status
Contractor Mode Administration Tab Overview
EO Applications Parallel Session
Spectrum Review and EFIS
Ian Bird GDB Meeting CERN 9 September 2003
Operations & Coordination Tools
WP5: Dissemination, studies, web portal and tools
POC Procedures Working Group (POC-PWG) Work package 3 (As Built)
GGUS Partnership between FZK and ASCC
LCG Monte-Carlo Events Data Base: current status and plans
LCG Operations Centres
LCG Operations Workshop, e-IRG Workshop
SOFTWARE PROJECT MANAGEMENT
SupportCenter Plus Product Overview.
PCS CONTENT ON CMS.
Internet Engineering Course
Presentation transcript:

DataGrid and CrossGrid Helpdesk CERN, 30th October 2002 EDG WP6 meeting Sophie Nicoud (CNRS-Marseille) and José Salt (IFIC-Valencia)

2EDG WP6, 30 th October 2002 Contents  Principles and Status of the DataGrid and the CrossGrid Helpdesks  Unification of the DataGrid and CrossGrid Helpdesks

3EDG WP6, 30 th October 2002 Principles and Status of the DataGrid and the CrossGrid Helpdesks

4EDG WP6, 30 th October 2002 Principles of Helpdesk  User Support infrastructure allows All users to get answers to their questions Access to the up-to-date documentation of the 2 projects  Users could be Scientist using the Project Testbed Local system administrator of a DataGrid/CrossGrid site  Questions could be All kind of questions related to the projects s Certificate questions s Installation questions s Use of the Grid (user command, administrator's site command,…) s Forgetting password s …

5EDG WP6, 30 th October 2002 Principles of the Helpdesk Question-Answer mechanism (1) 1. User searches his answer in the knowledge base 2. User sends his question by the WEB interface 3. The person of the user support team assigned to manage the flow of questions, add it into the knowledgebase and the question is assigned to a person of the User Support Team 4. The user receive an acknowledgement ticket with the question identifier

6EDG WP6, 30 th October 2002 Principles of the Helpdesk Question-Answer mechanism (2) 5. The person of the user support team assigned to this question add the answer into the knowledgebase 6. The user receive the answer by 7. The user support team could have interaction with the user by the generic address of the User Help Desk 8. To close the question user gives an acknowledgement  In any case, the proposed solution will have to be tested by the user support team before being sent back to the user and updated in the knowledge base.

7EDG WP6, 30 th October 2002 Unification of the DataGrid and the CrossGrid Helpdesks

8EDG WP6, 30 th October 2002 Status of the DataGrid and CrossGrid Helpdesks  EDG User Help Desk started his activity in May 2002  First choice was to develop an application with PHP and MySQL  Design of the DB and mechanism of Question-Answer  Further developments were in Perl  Initial development was done WP6 CNRS people (S.Nicoud, E.Fede)  Starting of the implementation at the end of June-02 (J.Salt)  User and Administrator levels are almost finished. Expert level is in progress Common CrossGrid DataGrid  Common proposal with CrossGrid User Support team in Lyon, April 2002

9EDG WP6, 30 th October 2002 Status of the DataGrid and CrossGrid Helpdesks  Actually, the User Support team is composed by 3 WP6 CNRS people (S.Nicoud, E.Fede, N.Lajili)  Since beg. October the User Support team is composed by V. Lara (CrossGrid contract, WP4.3) and J. Salt Main differences between the two Helpdesks:  DataGrid HD includes a filter with a intensive human intervention due to the need of reformulate the question and to avoid the spurious questions (Spam)  CrossGrid has implemented the tasks of the different WP as individual topics while DataGrid has implemented the topics taking into account the functionality of the GRID software  In CrossGrid the expert level has a more important role while in DataGrid the expert will enter at last stage of the procedure

10EDG WP6, 30 th October 2002  Helpdesk: Choice of unification scenario: to have only 1 Helpdesk DB and only 1 User Interface Convergence is needed to obtain the final implementation in particular for the following aspects: s Intensity of the filter provided by the HD administrator -> possible solution would be to add a "draft" DB to decrease the administrator task; but to preserve a basic filter for the "production" DB s Topics -> an effort is needed to have the unified list of topics (Cross and Data Grid) and to establish the relationship between them s Implementation of the Expert Level -> to provide a commun solution s Location of the Helpdesk software -> two candidate sites : Marseille (DataGrid) and Valencia (CrossGrid); the choice will be given at the end of the implementation

11EDG WP6, 30 th October 2002 Tentative Scheduling of the Convergence period s From now until second half of November CrossGrid is going to write and test an application based on an existing Sourceforge product ( s If the application works properly and contains the required features we will take the unified scenario of 1 db + 1 interface; 3 or 4 weeks for the convergence s First Prototype of Helpdesk will be included in the Mont 9 CrossGrid Deliverable (December 02) s Beginning 2003 : definitive unification of the Helpdesks  User Support Manpower: To share the efforts : s 1 or 2 administrator(s) / project s Recruitment of experts from the two projects