GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE.

Slides:



Advertisements
Similar presentations
NA YETS: schedule week by week S. Evrard.
Advertisements

Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Downstream PID Review Alan Bross MICE CM 16 October 8, 2006.
Upstream PID Review Alan Bross MICE CM 16 October 12, 2006.
G2p Safety Readiness Review January 17, 2012 Expected Radiation Exposure Levels from Activated Local Dump George Kharashvili, Radiation Control.
UCN Phase 2 Design Status September 10, Design Components Bulk Shielding Target Crypt Cryogenic Insert Target Insert UCN Port Beam Window Cooling.
Session 8 - Long Shutdown 2 Strategy and Preparation LIU Planned Activities Reference : RLIUP Oct.2013 (indico) “Work Effort in the LHC Injector Complex,
ATC/ABOC Days 21-23/1/2008 Heinz Vincke for SC-RP 1.
Christophe Delamare EDMS Accelerator Consolidation Workshop GS/ASE activities.
GIF++ ACCESS SYSTEM Dorothea Pfeiffer GIF++ Project Meeting Thanks to: V. Martins De Sousa Dos Rios, D. Vaxelaire, D. Haasler.
Construction and Installation of the CLIC Experimental Area
Summary of Hg System Review at CERN Van Graves 13 Sep 2005.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
Upgraded Injector Test Facility 2015 Users Group Board of Directors Update Akers/Experimental Nuclear PhysicsJanuary 13, 2015.
PLC NANO MANAGING SAFETY FUNCTIONS acting on electrical power for MEY/NA Experiments/Barracks.
FUNCTIONAL SPECIFICATION Dorothea Pfeiffer Dennis Haasler GIF++ User Meeting
CMS Muon Chambers Long term studies at GIF++ Andrey Marinov On Behalf of Long Term Studies of the CMS Muon Detectors 1.
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson 17 September 2015.
GIF in EHN1- layout, construction and schedule Adrian Fabich, EN-MEF-LE GIF users meeting, 12 th February 2014.
CENF secondary beam study group 1 st meeting - 7 th May 2013 M. Calviani (EN/STI)
1st LTEX 22 June 2009D.LACARRERE1 Protection of UX85 EDMS No IP8 Current Status & Plans  UX85 Expt Area  RB84 (8-7 sector)  RB86 (8-1 sector)
East Area, M2, K12 Lau Gatignon / EN-MEF, EATM
EHN1 North Wall Dismantling Schedule Bastien Rae.
Lau and Niels, NA62 TD meeting, 17 March Complete the crane consolidation in TCC8 Reinstall front-end after alignment checks Consolidation of T10.
NA YETS: schedule week by week S. Evrard.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
Radiation Protection aspects for SHIP Doris Forkel-Wirth, Stefan Roesler, Helmut Vincke, Heinz Vincke CERN Radiation Protection Group 1 st SHIP workshop,
The Building 180 Cryogenic infrastructure water cooling system Status Update Stefano Moccia, EN-CV Coordination meeting 14/10/15.
Activation around dump shielding, and design of beam line mask Mathieu Baudin, RP Genevieve Steele, EN-STI Helmut Vincke, RP.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
Functional/Budget specification EHN1 Extension: Infrastructure (WG2) Mats Wilhelmsson EN/MEF 4 November 2015.
LHCb MUON. Plans on GIF++ (16.65 TBq) Oleg Maev What has been done for study of aging in MUON MWPCs and GEMs before RUN1: -Six months on GIF.
Floor plans, Infrastructure & Logistics Hie-Isolde Spectrometer Workshop Physics Department, Lund University 10 March, 2011 Hie-Isolde Erwin Siesling.
Plans and schedule for the Long Shutdown LS1 SGUI CERN, 2 February 2012 Hie-Isolde Erwin Siesling.
Radiation Protection studies for the Linac4 / Linac2 interface Joachim Vollaire, DGS-RP 28/09/2015 Linac4 Coordination Meeting.
Overview on the Proposal for a new Gamma Irradiation Facility at CERN GIF++ Mar CAPEANS April 29 th, 2009 April 29, 091M.C.
8/4/2015R. Guida PH-DT-DI1 Info 1)Air conditioning system Status: Adrian Fabich contacted CV and he is waiting for info. Today I’m going to meet experts.
Overview on the Proposal for a new GIF, August Page 1 Overview on the Proposal for a new GIF Summary of the document distributed to the users and.
EHN1 – EN/EL Planning Lighting _ Containment_ Cabling J. Devine G. Gross 11/02/16.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Status of GIF++ Adrian Fabich, Dorothea Pfeiffer, EN-MEF-LE EATM, 27th August 2013.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
LHCb Week 27/11-01/ D.LACARRERE on behalf of Expt Area Team1 Experimental Area Latest News from IP8  Radiation Shield – Upper & Front Parts  Structures.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
GIF++ implementation Adrian Fabich, Sylvain Girod, Dorothea Pfeiffer, EN-MEF-LE GIF++ 3rd users’ meeting, 11th July 2013.
GIF completion status Adrian Fabich, EN-MEF-LE on behalf of the GIF project team GIF users meeting, 14 th January 2015.
… getting there … 112/02/2014A. Fabich, EN-MEF-LE.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
GIF++ implementation Adrian Fabich, Sylvain Girod, EN-MEF-LE Technical meeting with Supplier of Irradiator, 3 rd October 2013.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
The New Radiation test facility at CERN: CHARM December 8 th 2014 CERN R2E project ESA/CERN meeting - December 8 th 2014 The new radiation tests facility.
ELENA installation progress F. Butin / ELENA collaboration.
Report Technical Director Storage-Ring-Installation Completed
The Next Generation of a Gamma Irradiation Facility GIF++
Neutrino Platform Proximity Cryogenics 72th EHN1 Cryogenics Integration TE-CRG
St. George Infrastructure
Francois and Lau EATM 17 July 2012
EHN1 Extension planning
CE Status: Activities executed until 03/08 and ongoing
Lead bricks painting General procedure and its practical application
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
LHC Civil Engineering Activities for YETS – LS2
MERIT Beam Collimator Design
Experimental Areas – LS2 planning
Access Control for CERN Experimental Areas
Test.
EA Renovation Project – Project Team 29 – 28 June 2019 NEWS
Presentation transcript:

GIF in EHN1 - Vision 112/02/2014A. Fabich, EN-MEF-LE

… getting there … 212/02/2014A. Fabich, EN-MEF-LE

GIF in EHN1 - Gas piping and CDC 312/02/2014A. Fabich, EN-MEF-LE

GIF Schedule 412/02/2014A. Fabich, EN-MEF-LE EDMS V0.3 Functional specs: -Juli 2013 Functional specs: -Juli 2013 Design -Dec Design -Dec CE start Jan CE start Jan Infrastructure installation March-July 2014 Infrastructure installation March-July 2014 Irradiator delivery Aug Irradiator delivery Aug Commissioning Sept.-Oct Next major installations: -Structures (EN/MEF) -False floor -Service - First floor -Dem. Water & compr. Air (EN/CV) -Cabling (EN/EL) -AC, controls, light -Access & safety systems (GS/ASE)

H2 beam shielding modifications 5 In view of the Primary Ion Run (from Jan. 2015)  Achieve legal RP limits in corridors and barracks  Also during accidental beam loss upstream of PPE152  Additional shielding (min. 80 cm concrete equivalent)  PPE132 and 142: fully covered to protect personnel in corridor and workshop  PPE152: lateral shielding up to 2 m above first floor  Effort  About 300 concrete blocks 12/02/2014A. Fabich, EN-MEF-LE

PPE132/142 shielding 613/5/2014A. Fabich

PPE152 shielding 7  Only lateral  No roof cover 13/5/2014A. Fabich Central passage NA61 target beam