LHC Cryogenics, equipment & interventions around P3/P7 S. Claudet, “volunteer” for TE_CRG 16 Oct’14.

Slides:



Advertisements
Similar presentations
Cryogenic system in P4: Possible options S. Claudet & U. Wagner LHC Workshop, “Chamonix XlV” January 2005 (Mostly for RF & beam scrubbing)
Advertisements

Going towards LHC Run2 CRYOGENICS 5 th Evian Workshop 2-4 June 2014 SESSION 4 - Systems 2 - Status and commissioning plans (HW perspective) Krzysztof Brodzinski.
A. Perin, CERN, TE-CRG, 26 May Review of the cryogenic by-pass for the LHC DS collimators 26 May 2011 Modifications to the DFBs, DSLC and cryogenic.
H. MAINAUD DURAND, A. HERTY, A. MARIN, M. ACAR PERMANENT MONITORING OF THE LHC LOW BETA TRIPLETS: LATEST RESULTS AND PERSPECTIVES.
QRL Leak Tests the story so far………. Paul Cruikshank on behalf of TE-VSC colleagues & AL4030 Consortium (S133) 1 Paul Cruikshank TE/VSC - QRL Leak Tests.
Possible Assembly and Test of the Crab cryomodule in SM18 at CERN P. Maesen LHC Crab Cav meeting, 17 Sep’ 09 LHC-CC09Cryomodule Assembly & Test Stand.
New HV test specification for the LHC N. Catalan for the EI section.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
SC - 04Feb'13Cryo Heaters Review Cryogenic Heaters Review Operation use and wishes S. Claudet - A. Suraci LHC Cryogenic Operation.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
LHC HARDWARE COMMISSIONING SAFETY TRAINING DAY S. Claudet (AT-ACR-OP) With great help from G. Lindell (Safety commission) CRYOGENICS.
CRYOGENICS AND POWERING
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
A. Perin, CERN, TE-CRG, 13 June ICL, 13 June 2012 Consolidation of the DFBX CL control system.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
HC review - 12 May 2005Luigi SERIO - AT/ACR/OP1 SECTOR COOL DOWN AND CRYOGENIC COMMISSIONING L. Serio.
Workshop Chamonix XIV Shortcuts during installation and commissioning: risk and benefit H. Gruehagen, G. Riddone on behalf of the AT/ACR group 18 January.
June 1 rst, Consolidation for E-cloud and High Voltage cards N.Vauthier TE-CRG LS1 projects review:
CERN plans towards energy efficiency Serge CLAUDET Nov 2014.
LHC Insertions Upgrade Working Group (LIUWG) Space available in tunnel Y. Muttoni.
A. Perin, TE-CRG, YETS meeting September 15 th 2015 Year End Technical Stop (YETS) Meeting A. Perin, TE-CRGm with contributions from M. Pezzetti,
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
7/23/ J.Coupard. 1) Cryogenic risks 2) Cryogenic phases from RT/floating to nominal and additional safety rules A. Sectors warmed-up to RT or considered.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
Samy Chemli – Configuration Management - S. Chemli EN-MEF – Contents Configuration Management Hardware Baseline Change Management.
S. Claudet - 31st May 2007Power refrigeration for LHC Power refrigeration at 4.5K & 1.8K for the LHC S. Claudet, CERN AT-ACR.
OLAV III Experience with the LHC Insulation Vacuum System S. Blanchard, P. Cruikshank, B. Jenninger, N. Kos, W. Maan, L. Mourier, N. Provot, J. Wallner.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
An introduction to Energy aspects at CERN June 2014.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Long shutdown 1 LHC Machine Status Report K. Foraz June 12 th, 2013.
LHC Cryogenics HWC day 19 March 2009 Serge Claudet TE-CRG-OA (LHC Cryo OP)
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Luigi Serio CRYOGENICS PERFORMANCE AND OPERATION L. Serio, on behalf of the LHC Cryogenics Operation and Cryogenics Performance Panel.
1 Sector Test – Preparation Layout in LSS7 Jan Uythoven (AB/BT) Thanks to Mike Lamont and the other ‘sector testers’
SM18 cryogenics infrastructure upgrade L. Serio TE-CRG.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
CERN Jan 2006 Specific safety Issues for 2006 compared to 2004 P. Cennini AB Safety Requirement in case the Installation activities are going on.
Can we change a magnet without warming-up a full arc ? Serge Claudet, With help from P. Cruikshank & J-P. Tock (Chamonix Jan’10)
TE-CRG Activities D. Delikaris, TE-CRG.
5-year operation experience with the 1.8 K refrigeration units of the LHC cryogenic system G. Ferlin, CERN Technology department Presented at CEC 2015.
LHC Cryogenics From cool-down to 1st beams Serge Claudet (LHC Cryo OP), On behalf of cryo teams involved.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Workshop on cryogenic & vacuum sectorisation of the SPL Vacuum Sectorisation Paul Cruikshank, CERN Technology Department (TE) Vacuum Surfaces & Coatings.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
L. Tavian, TE/CRG, LSC Page 2 February 21 th, 2014 LS1 Committee (LSC) L. Tavian TE-CRG.
TE-CRG Activities A. Perin, on behalf on the Cryogenics Group.
(Access system for HWC)
ALIGNMENT OF THE NEW TRIPLETS
Considerations from machine protection and the ELQA teams
CONSOLIDATION day in view of HL-LHC Cryogenic aspects
Cryo equipment strategy in the R2E context
BA6 – crab cavity activities in EYETS
Installation of an Instrument on a CERN machine
Feasibility and implication of installation of the string test in SM18 with a slope M. Bajko WP16.
Update of cryogenic activities
SPS cryogenic proximity equipment and SM18 validation
CRYOGENICS – strategy, unavailability root causes and limitations
Preparation of the activities for the LHC Long Shutdown 2
Keeping LHC cold during LS periods Preliminary proposal
As energy coordinator for CERN Accelerators & Technology
Hollow e- lens, Cryogenic aspects
Accelerator and Experiment Interface Session: LS2, LS3
Overview & baseline of LS2 and roadmap for CRG
Summary post TCC#54_02Aug’18
Review Bloc 4 and SM18 facilities and upgrade
HL-LHC New MS optimisation WP9, Preliminary cost estimates
HL-LHC Post MSO optimisation, Complementary considerations for Q4
Presentation transcript:

LHC Cryogenics, equipment & interventions around P3/P7 S. Claudet, “volunteer” for TE_CRG 16 Oct’14

SC - 16Oct'142014_Rad/R2E_workshop_Cryo_P3/P72/11 Content Introduction to Cryo HW at P3/P7 What we know What we do not know (yet!) Our proposed approach Summary Electronics already treated by Juan Casas on Wed. 15th

SC - 16Oct'142014_Rad/R2E_workshop_Cryo_P3/P73/11 Typical examples (R3 around Q6) Intervention on a valve Cryogenic line return module (QRL_RM) Sector door Q6_R3

SC - 16Oct'142014_Rad/R2E_workshop_Cryo_P3/P74/11 Typical examples (L7 around Q6) Cryogenic line return module (QRL_RM) DFBMH Sector door

SC - 16Oct'142014_Rad/R2E_workshop_Cryo_P3/P75/11 HL-LHC new sc LHC scheme Q7DFBAMBQ6MBQ7DFBAMBQ6MB Technical gallery TZ76 Main tunnel RM HL-LHC scheme Q7DFAMBQ6MB DFHA DSHA DSL M DFM Q7DFAMBQ6MB DFHA DSHADSL M DFM RM After LS2 Cryogenic distribution line (QRL) Warm He recovery line (WRL) But instrumentation and valves of cryogenic line and DF’s will remain !

SC - 16Oct'142014_Rad/R2E_workshop_Cryo_P3/P76/11 What we know Qualification of installed HW –Validated electronics and sensors (cf talk by Juan Casas) Interventions during LHC runs periods –Few cases on instrumentation/connectors/valves/leaktightness –Dedicated zone reserved for potentially activated cards (not used, buffer zone enough) Foreseen maintenance –Basically nothing systematic, possibly towards the end of LSx Consolidations done –Mechanical work on electrical feed boxes (DFB’s) –QRL-bellows Necessary re-commissioning after a LSx –Usual instrumentation/connectors/valves, including search & fix Helium leaks Few examples of surprises so far –Mostly instrumentation and valves for DFB’s or QRL, with difficult access Recent “rag” blocking a valve stem at QRL_RM_R3, several hours “on the valve”

SC - 16Oct'142014_Rad/R2E_workshop_Cryo_P3/P77/11 What we know, DFB’s Valves for current leads cooling Connectors (difficult) Access !!! 1’200 current leads, with valves/instrumentation/connectors Recent warning that things will change!

SC - 16Oct'142014_Rad/R2E_workshop_Cryo_P3/P78/11 Our concern so far: DFBX’s Valves Instrumentation Connectors Leaktigntness NB: only DFBX of P1/P5 will be removed during LS3, not P2/P8 ! For the 1st time, some remove HW (valves) had to be kept in controled area

SC - 16Oct'142014_Rad/R2E_workshop_Cryo_P3/P79/11 What we do not know (yet!) Future doses and activation levels –For sure simulations exists (there might be surprises) –We have to get familiar to this, and learn how to behave accordingly !!! Future surprises (by definition) –Sensors - instrumentation - connectors - Helium leaks: failures or affected by other activities/interventions … –Other type of “rag” to be removed from a valve !

SC - 16Oct'142014_Rad/R2E_workshop_Cryo_P3/P710/11 Our proposed approach Continued monitoring of our statistics and experience Keep in touch with RP-R2E specialists In case of Rad-R2E issues (surprises): –Evaluate, analyse, treat (HW-SW-relocation) In case of interventions, ultra-basic knowledge : –Perform as much outside these areas –Share time of exposure if required –… Obviously not yet experienced for “exposed” areas, but aware that this will be required soon ! Very basic ! !!!

SC - 16Oct'142014_Rad/R2E_workshop_Cryo_P3/P711/11 Summary Besides R2E cases already treated, we had no sign of weakness so far due to radiations, and are confident with HW installed at P3/P7 (properly qualified) We will have mostly scheduled works to be done during Lsx, but possibly few interventions during LHC runs on instrumentation or valves with difficult/delicate access Without experience for interventions in “exposed” areas, (just starting to built-up experience with interventions in the environment of triplets) we will need to organise our activities properly and acquire necessary specific knowledge, procedures, adequate spares, training … Thanks for your understanding !