Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN.

Slides:



Advertisements
Similar presentations
Neutrino Town Meeting CERN – May 14-16, 2012 SPL R&D and Potential Applications R. Garoby for the SPL team* O. Brunner, S. Calatroni, O. Capatina, E. Ciapala,
Advertisements

ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
2nd EuroNu Plenary Meeting Review of CERN Proton Driver bunch compression studies 02/06/2010M.M. - EUROnu1.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
Dr. Michael Peiniger Superconducting RF activities at RI Research Instruments with a focus on EXFEL cavity production.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
SPL cryo-module conceptual design review Cavity, helium vessel and tuner assembly N. Valverde, G. Arnau, S. Atieh, I. Aviles, O. Capatina, M. Esposito,
SCRF Activities at IPN Orsay Sébastien Bousson On behalf of the SCRF group Eurisol Net Meeting – CERN, 28 th June 2011.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
R.G. – 17/03/2003 MORIOND Workshop The SPL* at CERN OUTLINE  Why ?  How ?  Roadmap  Summary * SPL = Superconducting Proton Linac A concept for.
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
201 MHz NC RF Cavity R&D for Muon Cooling Channels
ESS cavities interfaces
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
Parameters of 2 nd SPL feasibility study A.M.Lombardi (reporting for the working group)
Summary of WG 2 - cavities W. Weingarten 15th SPL Collaboration Meeting CERN - 25/26 Nov Cavity WG.
Workshop on cryogenic and vacuum sectorisations of the SPL CERN, 9 th -10 th November 2009 Workshop Organisation and Goals Vittorio Parma TE-MSC.
Low Emittance RF Gun Developments for PAL-XFEL
LAGUNA meeting September , 2010 CAES – CNRS – Aussois - FRANCE Prospective Proton Drivers for neutrino facilities at CERN 8/09/2010 R. Garoby.
STF status Mar.22,2005 H. Hayano, KEK. STF Phase 1 Test Accelerator DC gun : 200kV CsTe photocathode for quick start UV(262nm) Laser (337ns spacing, 2820bunches)
1 Linac4 Overview M. Vretenar, SLHC Meeting, Motivations 2.Layout 3.Main parameters 4.Schedule 5.Status.
GDR NEUTRINO - SESSION April, LPNHE Neutrinos options at CERN R. Garoby – 27/04/2009.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
Preparation of design study ICL May 2005 accelerator Alain Blondel ECFA/BENE Future Neutrino Beam studies Towards a comparison of options on equal footing.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
June 3, 2004G.W.Foster - Proton Driver Proton Driver Project Development, Tactics & Strategy G. W. Foster Fermilab User’s Meeting June 3, 2004.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
H. Haseroth Friday, August 31, 2001 MUG Meeting 1 Overview of the CERN Neutrino Factory Machine Studies H. Haseroth for the Neutrino Factory Working Group.
Report from WG2 (cavity) and objectives of the meeting W. Weingarten / CERN 3 rd SPL Collaboration Meeting CERN 11 – 13 Nov /Nov/2009 W. Weingarten13rd.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
The SPL Short Cryo-module: Status Report V.Parma, CERN, TE-MSC On bahalf of the Cryomodule development team SPL seminar December 2012, 6-7 December 2012,
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
8-10 January Paris Diderot University High Power Protons Drivers for Beams in Europe R. Garoby [using material from M. Dracos (CNRS), T. Ekelof.
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
R. Garoby for S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo, R. Bonomi, O. Brunner, S. Calatroni, O. Capatina, J. Chambrillon, F. Gerigk, M. Guinchard,
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
Research progress and plan CERN-KEK Committee, 2nd meeting 07/Dec/07 Masamitsu AIBA CERN-Japan fellow, AB/BI.
R. Bonomi - SLHiPP2, Catania 3-4/5/20121 SPL Thermal Studies R. Bonomi Superconducting linacs for high power proton beams - Catania, 2012.
K. TAVAKOLI Upgrade of the superconducting RF cavities at soleil K. Tavakoli SOLEIL Synchrotron, France.
ESS SC cavities development G. Devanz TTC meeting, march 1st 2011, Milano.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
P. Bosland CEA-Saclay Collaboration Board meeting Copenhagen 14/04/ Status of the French activities under the responsibility of CEA Philippe CHOMAZ.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Proton Driver Scenarios at RAL and CERN
Linac4 & SPL Status of preparation and Opportunities M. Vretenar (R
CERN – Zanon discussions
CW couplers; KEK injector couplers Eiji Kako (KEK, Japan)
WP5 Elliptical cavities
SPL R&D at CERN R. Garoby for S. Atieh, I. Aviles Santillana, G. Arnau Izquierdo, R. Bonomi, O. Brunner, S. Calatroni, O. Capatina, J. Chambrillon, F.
Uppsala Commitment to ESS and FREIA Planning
Plans for a Superconducting Proton Linac at CERN
Hosting Orsay Walid KAABI
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
Superbeams with SPL at CERN
Progress towards Pulsed Multi-MW CERN Proton Drivers
SLHC-PP kick-off meeting, CERN 9 April 2008
The SPL-based Proton Driver at CERN
Presentation transcript:

Status and Perspectives of the SPL R&D R. Garoby – 6/12/2012 SPL Seminar 2012 December 6-7, 2012 CERN

Motivation Motivation Resources & Planning 2012 Achievements Future

Preserve the possibility of new injectors in the future (HE-LHC…) Motivation (1/7) PSB SPS Linac4 LP-SPL PS LHC / HE-LHC 160 MeV 1.4 GeV 4 GeV 26 GeV 50 GeV 450 GeV 7 TeV Linac2 50 MeV Proton flux / Beam power PS2 Present Optional Future LP-SPL: Low Power-Superconducting Proton Linac PS2:High Energy PS (~ 5 to 50 GeV – 0.3 Hz) HE-LHC: “High Energy” LHC (  14 TeV/ring) PS2 SPL LINAC4 SPS PS R.G. 36/12/2012

Options for neutrino physics (Low energy Superbeam) Accumulation of beam from the High Power SPL in a fixed energy Accumulator (4-5 GeV, 4MW beam power). Fast ejection onto target(s) Motivation (2/7) R.G. 46/12/2012 Studied in LAGUNA - to be continued in ERC Synergy

Physics Performance (CPV) (Enrique Fernantez et al. – Nov. 2012) ESS SB Precision on δ CP R.G. 56/12/2012 SPL is highly competitive… Motivation (3/7)

Options for neutrino physics ( Factory) Accumulation of beam from the High Power SPL in a fixed energy Accumulator (4-5 GeV, 4MW beam power). Bunch compression («rotation») in a separate Compressor ring Fast ejection of few (3-6) short (2 ns) bunches to target Motivation (4/7) R.G. 66/12/2012 Studied in EuCARD and IDS-NF

Options for neutrino physics (High energy Superbeam to Pyhasalmi) LP-SPL as 4 GeV injector of a new High Power 50 GeV synchrotron Motivation (5/7) R.G. 76/12/2012 Studied in LAGUNA - LBNO

Next generation Radioactive Ion Beam Facility (~EURISOL) TARGETS RADIOACTIVE IONS LINAC EURISOL EXPERIMENTAL HALLS ISOLDE OR EURISOL HIGH ENERGY EXPERIMENTAL HALL TRANSFER LINES SPL to EURISOL TRANSFER LINE SPL to ISOLDE Motivation (6/7) R.G. 86/12/2012

Update of CERN competencies in superconducting RF Upgrade of CERN infrastructure for superconducting RF (SM18 clean room, High Power RF, High Pressure Water Rinsing facility, Diagnostics for SC RF, New e-beam welding machine, Electropolishing installation, etc.) Synergy with other applications at CERN (LHeC electron linac, LEP-3… ) as well as outside of CERN [ESS, ADS (MYRRHA)…] R.G. 96/12/2012 Motivation (7/7)

Motivation Resources & Planning Resources & Planning 2012 Achievements Future

Resources R & D for a High Power SPL formally supported at CERN in view of multiple future potential applications  ~1.7 MCHF and 6 FTEs / year Collaboration with ESS  Fellows and procurement of klystron modulator for SM18  Joint investigation of 1 MW IOT (under discussion) French in-kind contribution  Tuners, Helium tanks, use of Saclay 704 MHz high power test place… EC-supported programmes EuCARD (WP10)  Development and test of beta=1 (CEA) and beta=0.65 (IN2P3) 5 cells cavities CRISP (WP4)  Joint work with ESS and DESY  EC-supported manpower for upgrading and exploiting the SM18 test place LAGUNA-LBNO  EC-supported fellow for studying proton drivers at CERN using LP- or HP-SPL Synergy grant of the ERC (to be submitted in January 2013)  EC-supported fellow(s) for studying HP-SPL and accumulator DOE-supported programme BNL  Development and test of a  =1 cavity R.G. 116/12/2012 New

SPL R&D Planning Preparation of SM18 infrastructure (cryogenics, RF, clean-room) Cavities production Cavities processing/RF testing RF couplers Clean room assembly of string Cryomodule (& assembly tooling) design Cryomodule fabrication Cryomodule assembly Start cryomodule RF testing ~done R.G. 126/12/2012

Motivation Resources & Planning 2012 Achievements 2012 Achievements Future

Cryomodule Supporting system mock-up: All components ordered / vacuum vessel ready Interfaces welded to double tubes Cool down and first cold tests: first months of 2013 Cold magnetic shield R.G. 146/12/2012 More details during this meeting

SM18 & cryomodule integration Valve box RF distribution Cryo line interface Cryo-module Study by P. Martinez Yanez and B.Riffaud Cryomodule integration in the bunker to CM Vacuum vessel Thermal shield Valve box design from SM18 Cleanroom new layout High Pressure Rinsing SC RF diagnostics: Quench detection with OSTs Optical inspection bench R.G. 156/12/2012 More details during this meeting

Cavities fabrication R.G. 166/12/ Cu 5-cell cavities β=1 (prototypes) fabricated at CERN: To learn with the fabrication process To practice RF measurements For surface treatment tests 5 Nb 5-cell cavities β=1 ordered in industry (RI) Single cell test cavity e-polished and RF measured Accel. gradient (MV/m) Q Preparation for fabrication of an Nb 5-cell cavity at CERN in 2013: Successful tests of Nb spinning & Nb brazing on Steel E-beam welding tests with new machine New e-beam welding machine SS Cu Nb SS Cu Nb Spinning tests More details during this meeting

Cavity equipment RF couplers tested at high power Tuners (CEA design & fabrication): - 8 tuners delivered Cylindrical window : – TW : 1000 kW 2 ms 20 Hz – SW : 550 kW 500 us 8 Hz Coaxial disk window : – TW : 1000 kW 2 ms 20 Hz – SW : 1000 kW 1.5 ms 4 Hz Air inlet through WG short circuit PEEK Screen all around ceramic … and how to make it better R.G. 176/12/2012 More details during this meeting

R.G. 186/12/2012 Other issues… 2 nd Collaboration Meeting on Superconducting Linacs for High Power Proton beams (SLHiPP-2) – Catania – May 3 & 4, 2012 [ ] TTC Meeting – JLab – November 5 - 8, 2012 [[ ] Contribution to the briefing book of the European Strategy Group [ ] “R&D related to the High Power Superconducting Proton Linac (HP-SPL)“

Motivation Resources & Planning 2012 Achievements Future Future

Future (beyond what has been shown before)… Branching point  Recommendations of the European Strategy Group in January 2013  Updated Scientific Strategy of CERN: Integration in 2013 MTP (submitted to Council in June) Start of implementation in 2014? Key ingredients -Physics! Based on the results of LHC and of the on-going experiments. -Strength / weaknesses of competing options (Linear collider …) -Strength / weaknesses of the SPL-related applications (Proton drivers for facilities, Injectors for LHC- related future beyond HL-LHC, LHeC, LEP-III …) -CERN strategy for sc RF technology -Opportunities, politics and collaborations… Main meetings  SLHiPP-3, Louvain-la-Neuve (Belgium), April 17 & 18, 2013  SLHiPP-4, CERN, November 2013 R.G. 206/12/2012