Kentucky Transportation Center Contractor Performance Evaluations S TEPS AND G UIDANCE Kentucky Transportation Center Kentucky Transportation Cabinet.

Slides:



Advertisements
Similar presentations
Michigan Department of Education School Improvement Plan SIP February 2011.
Advertisements

CALIFORNIA DEPARTMENT OF EDUCATION Jack O’Connell, State Superintendent of Public Instruction California Department of Education Special Education Self-
Standards Aligned Systems MANDATE WAIVER PROGRAM 2008.
Information Services Portal Login/Logout. LOGIN PAGE Please refer to the following pages for scenarios 1, 2 and 3 Please refer to the ‘Guest User’ User.
EDGEWOOD ISD TEACHERS GUIDE 1 Department of Planning and Student Information Systems.
Indistar: Updates, Additions, and Coming Soon Stephanie Benedict, ADI.
Copyright © Mountain Home Training & Consulting, Inc. i MHTC VirtualOFFICE 3.0.
Welcome to the Brookdale Community College Online Employment System Applicant Tutorial.
Welcome to Turnitin.com’s Peer Review! This tour will take you through the basics of Turnitin.com’s Peer Review. The goal of this tour is to give you.
1 Colorado Department of Health Care Policy and FinancingColorado Department of Health Care Policy and Financing The Case Manager’s Guide to Critical Incident.
EProcurement Job Aid Requisitions & Receipts. Table of Contents Creating a Requisition Define Requisition Vendor.
SAISD Federal Programs Department. Stage 1 of the Organization and Development Process Form the Planning Team 1 2.
PROACTIS: Supplier User Guide Contract Management.
Subcontract Requests. P rocess After the notice to begin work is issued, Construction Procurement uploads the contract into SiteManager. At that point.
Welcome to the University of Florida Online Employment System Applicant Tutorial.
Welcome to the Alaska Statewide System Online Employment System Applicant Tutorial.
Old Policy – which no one ever seem to have heard of.
Susan Dick-McKeon Director, School Based Procurement Prepared By: Myra Y. Estepa-Lee, Team Lead Client Services Help Desk New York City Department of Education.
Disability Support Services New Faculty Orientation.
1 American Recovery and Reinvestment Act (ARRA) Reporting Requirements Presented by: Darryl Grant Procurement Analyst Division of Acquisition Policy &
Moodle (Course Management Systems). Assignments 1 Assignments are a refreshingly simple method for collecting student work. They are a simple and flexible.
VIRGINIA’S IMPLEMENTATION of the FINAL RULE on WORK ZONE SAFETY and MOBILITY Virginia Department of Transportation’s Instructional and Informational Memorandum-LD-241.
This PowerPoint has been produced for the public and is made available for non-commercial use (e.g. toolbox meetings,
Incident Management PCCYFS June 27, 2007 Incident Management for the Office of Children, Youth and Families.
Walk Through of VEEP Online System Updated June 2015 Registering as a ‘New User’ Logging On and Reporting.
Information Services Portal Login/Logout. LOGIN PAGE Please refer to the following pages for scenarios 1, 2 and 3 Please refer to the ‘Guest User’ User.
IPA partners seminar Sarajevo, 18 th June 2013 Reporting procedure PRESAGE.
WELCOME to the QSNY Portal Public School Self-Study 1.
IEEE-SA Public Review IEEE/PES PE/SPDC Committee San Diego, CA May 2015.
Submitting Course Outlines for C-ID Designation Training for Articulation Officers Summer 2012.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
Preparing for the Fall 2005 MEAP and MI-Access Student Pre-ID Process Wednesday, April 13, 2005.
Atrezzo Provider Portal Outpatient Case Creation July 2015 INTEGRATED CARE MANAGEMENT AND QUALITY IMPROVEMENT 1.
LEP SYSTEM REQUIRED ANNUAL DATA COLLECTION SYSTEM FOR SD/CS/AVTS/CTC Presenter: Barbara Mowrey ESL/Bilingual Education Advisor Pennsylvania.
Work Zone Safety and Mobility Transportation Management Plans Jason Gutting, P.E. Michigan Department of Transportation.
Using GPS To Locate Collisions Lessons Learned Division of Traffic Accident Surveillance Section.
Earning IPDP Points Annual Review of Responsibilities and Procedures.
Grant Administration Agreement Which governs the relationship between NSFAS & Institutions.
Walk Through of VEEP Online System Updated May 2011.
Spreadsheets for SiteManager Materials 2007 HIGHWAY CONTRACTOR’S MEETING March 13 th (Bowling Green) March 16 th (Lexington) Presented By: Ross Mills.
Rev.04/2015© 2015 PLEASE NOTE: The Application Review Module (ARM) is a system that is designed as a shared service and is maintained by the Grants Centers.
Catherine Metcalf | Dec U.S. Department of Education 2015 FSA Training Conference for Financial Aid Professionals The FSA ID – Resources for Assisting.
GMAP Grant Management, Application, and Planning Consolidate Application Training.
Section 3 Opportunities Employer Registration and Job Posting Instructions.
How to complete and submit a Final Report through Mobility Tool+ Technical guidelines Authentication, Completion and Submission 1 Antonia Gogaki IT Officer.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
Central Houston, Inc. Houston Downtown Management District 909 Fanin, Suite 1650 Houston, Texas / Operations
ALL GROWN UP PROJECT ADULTHOOD Matt Looney Section Engineer’s Meeting Spring 2014.
Lions District 2-E2 Secretary Training March 14, 2015.
Migration to Central Data Exchange (CDX)
/MDProStart /ProStartProgram
Performance Review Tool Updates College of Engineering
21st Century Application Navigating the CCIP
ARC Chairperson Training
/ProStartProgram /ProStartProgram
ETS Submission Process for New Project Applications
Welcome to.
ARC Chairperson Training
How to Create and Start a Test Session
Applying for a contractor’s license online
Verification of Answer Documents (formerly Tested Roster)
Prime Contractor Performance
Your session will begin shortly
2019 Local School District Charter Application Process
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
BCS Template Presentation February 22, 2018
Hands-On: FSA Assessments For Foreign Schools
Sanitary Sewage Overflow (SSO)
Navigating the Obstacle Course Tools
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Presentation transcript:

Kentucky Transportation Center Contractor Performance Evaluations S TEPS AND G UIDANCE Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center Contractor Performance Evaluation Kentucky Transportation Center Kentucky Transportation Cabinet Purpose Provide a feedback loop to a Contractor’s Prequalification rating Positive performance is rewarded Negative performance could reduce a Contractor’s Maximum Eligibility Amount

Kentucky Transportation Center Contractor Performance Evaluation Kentucky Transportation Center Kentucky Transportation Cabinet Background A collaborative effort between the Kentucky Transportation Cabinet and the University of Kentucky Transportation Center Initiated by SPR : Quality-Based Prequalification of Contractors Modified under SPR : Contractor Evaluations in the Contractor Selection Process

Kentucky Transportation Center Contractor Performance Evaluation Kentucky Transportation Center Kentucky Transportation Cabinet Resource Location Division of Construction Website Specific Contractor Evaluation Website Links to: –New (2014) ~ Instructions & Guidelines –New (2014) ~ Evaluation Spreadsheet –Appeal Form –Department of Highway’s Evaluation Website –Training Video

Kentucky Transportation Center Contractor Performance Evaluation Significant Changes (2014) –Less subjectivity/specific guidance for ratings –Fewer ratings (7 project complete/6 interim) –Comments not required –Evaluations not required for subcontractors who perform less than $50,000 in the evaluation period –The average is a “3” –The Chief District Engineer is not required to sign the evaluation Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center Contractor Performance Evaluation Who is evaluated? –Every Prime Contractor –Every Subcontractor performing more than $50,000 worth of work in the evaluation period. You can evaluate any subcontractor even if they do not meet the above threshold Subcontractors not meeting the above threshold also may request an evaluation There will be scenarios where a subcontractor does not warrant an interim evaluation but will require a project completion evaluation. Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center Contractor Performance Evaluation When are evaluations to be completed? –Once per calendar year, for every project, for each contractor (prime & subcontractor) –Two Scenarios The project is complete: evaluate the contractors on the project once all work, punch lists, and cleanup is complete. The project is will continue into the next calendar year: evaluate the contractors on the project BY December 31 st. Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center Contractor Performance Evaluation What should you consider prior to completing an evaluation? –Use the next two lists of questions as a checklist prior to starting evaluations –One list is for interim evaluations and the other for project complete evaluations –Attempt to consider the prime and subcontractors independently though there will be crossover; the prime is responsible for the entire project Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center For Project Completion Evaluations Be Able to Answer… What amount of work was removed/replaced and/or what amount of deductions were assessed? Was a Section Engineer’s punch-list completed prior to final inspection? What amount (qualitative-minor, average, major) of corrective work was needed? Were there any material deficiencies? When was the project complete compared to the scheduled completion date or working days? When was corrective work completed compared to the issuance of the Comprehensive Final Inspection Report? What level of engagement, scheduling, communication and cooperation was there with KYTC? Did traffic control meet standards? Was work completed only within allowed hours? Were there any work zone incidents? Were temporary (eg. flagger, double fine, etc.) signs changed to reflect project traffic control? Was there active use of advanced warnings, consideration of Over-Size Over-Weight carriers, communication with media, and onsite traffic technician staff? Were there any OSHA citations? Were there any hazards noted by the section engineer? Were there safety meetings regularly held? Were all project partners invited to safety meetings? Were there any EPA fines? Was seeding progressively managed according to permits? Were any 5-day letters issued? Did reseeding occur more than once? When was seeding established compared to completion date? Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center For Interim Evaluations Be Able to Answer… What amount of work was removed/replaced and/or what amount of deductions were taken? Were there any material deficiencies? Were deficiencies addressed in a timely manner? Does the project progress appear to indicate the project is behind, on, or ahead of schedule? What level of engagement, scheduling, communication and cooperation was there with KYTC? Did traffic control meet standards? Was work completed only within allowed hours? Were there any work zone incidents? Were temporary (eg. flagger, double fine, etc.) signs changed to reflect project traffic control? Was there active use of advanced warnings, consideration of Over-Size Over-Weight carriers, communication with media, and onsite traffic technician staff? Were there any OSHA citations? Were there any hazards noted by the section engineer? Were there safety meetings regularly held? Were all project partners invited to safety meetings? Were there any EPA fines? Was seeding progressively managed according to permits? Were any 5-day letters issued? Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center Contractor Performance Evaluation Start the evaluations… –Each time you begin an evaluation(s), download the most recent TC template from transportation.ky.gov/construction visiting the Contractor’s Performance Report link This will ensure you have the most up-to-date contractor list –Start by opening the template… Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center Contractor Performance Evaluation If/when you get a “Security Warning” click “Enable Content.” Kentucky Transportation Center Kentucky Transportation Cabinet Click here

Kentucky Transportation Center Contractor Performance Evaluation Then follow the onscreen guidance… Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center Contractor Performance Evaluation Fill out the Contractor and Project Information with drop down menus for assistance… Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center Contractor Performance Evaluation Decide whether to continue using the easier user interface or manually enter ratings… Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center Contractor Performance Evaluation When using the wizard, ratings are evaluated one at a time displaying applicable criteria… Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center Contractor Performance Evaluation Enter the evaluator's information… Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center Contractor Performance Evaluation Review the form and adjust ratings as necessary … Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center Contractor Performance Evaluation Remaining Steps… –Save the file with a file name unique to the project, contractor, and evaluation period. –Print and sign the form –Submit a copy of the signed evaluation, with an Appeal Form (TC 14-20), to the Contractor Provide copies to the TEBM for Delivery & Preservation and the CDE Upon expiration of the appeal window (10 buisness days), ensure the TEBM submits the evaluation to the Division of Construction Procurement (Current contact: Cherie Shelton) Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center Contractor Performance Evaluation The Contractor Appeal process… –If the Contractor disagrees with their evaluation they may submit the Appeal Form TC –It must be submitted within 10 business days of receiving the evaluation, to the CDE. Kentucky Transportation Center Kentucky Transportation Cabinet

Kentucky Transportation Center Contractor Performance Evaluation If you have questions, contact your Central Office, Division of Construction Liaison for assistance. Kentucky Transportation Center Kentucky Transportation Cabinet