Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.

Slides:



Advertisements
Similar presentations
Xcal commissioning Status report and plans Olivier Deschamps Université Blaise Pascal/IN2P3/CNRS Clermont-Ferrand 0 Calorimeter commissioning meeting 16/01/08.
Advertisements

Trigger Validation Board PVSS panels tutorial 1. TVB components 2 FPGA controls :  FPGA HCAL hadron trigger  FPGA EPPI electron, photon, pi0, Global.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
Far Detector Data Quality Andy Blake Cambridge University.
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
1 Calice Analysis Meeting 13/02/07David Ward Just a collection of thoughts to guide us in planning electron analysis In order to end up with a coherent.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
Emlyn Corrin, DPNC, University of Geneva EUDAQ Status of the EUDET JRA1 DAQ software Emlyn Corrin, University of Geneva 1.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
1 Status of the calorimeter PMT’s time alignment LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Introduction Development status of the PMT time.
Dec. 19, 2006TELL1 commissioning for Calorimeters 1 TELL1 commissioning for calorimeters ■ Reminder ■ TELL1 status ■ ECS for TELL1- PVSS panels ■ Firmware.
Software installation for commissioning tests Olivier Deschamps Calorimeter commissioning meeting – 05 april 2007.
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
PS/SPD Electronics Installation and Commissioning 17 July 2007 Valentin Niess On behalf of LPC Clermont.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
STAR Collaboration Meeting, BNL, Feb 2005 Alexandre A. P. Suaide University of Sao Paulo Slide 1 BEMC software update L3 display 200 GeV February.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
SL1Calo Input Signal-Handling Requirements Joint Calorimeter – L1 Trigger Workshop November 2008 Norman Gee.
Running SPD OUTLINE VFE and CB overview Mapping CB panel: -Regulator board tab: how to switch ON/OFF the VFEs -Control tab: how to mask VFE -Test tab:
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
E.Guschin (INR,Moscow) 9 December 2008LED system meeting CERN Plans: PS/SPD LED monitoring system tuning Online histograms. Presenter for group of 16(64)
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED News New LED scan and stability data for ECAL were.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Online monitor for L2 CAL upgrade Giorgio Cortiana Outline: Hardware Monitoring New Clusters Monitoring
26/11/02CROP meeting-Nicolas Dumont Dayot 1 CROP (Crate Read Out Processor)  Specifications.  Topology.  Error detection-correction.  Treatment (ECAL/HCAL.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
SPD status and last operations A. Carboni, A. Comerma, D. Esperante, E. Picatoste et al. 08SEP2009Calo meeting1.
Trigger Tests Patrick Robbe, LAL Orsay, 8 Feb 2012.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
Laboratoire de l’Accélérateur Linéaire, Orsay, France and CERN Olivier Callot 18 March 2003 Online Data Format and Condition Database Proposed data format.
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
Errors Detection and Reporting L0DU Hervé Chanal, Olivier Deschamps, Régis Lefèvre, Magali Magne, Pascal Perret LPC Clermont-Ferrand - Université Blaise.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
July 10, 2001 Status Report of the ROD Testing at BNL Kin Yip Activity update of the ROD system at BNL: DAQ-1 with trigger controller Data corruption testing.
1 Timing of the calorimeter monitoring signals 1.Introduction 2.LED trigger signal timing * propagation delay of the broadcast calibration command * calibration.
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
1 L0Calo ECS. 2 Introduction L0Calo consists in several boards: –In the cavern: Front-End Boards, Trigger Validation Boards and SPD Multiplicity Boards.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
DB and Information Flow Issues ● Selecting types of run ● L1Calo databases ● Archiving run parameters ● Tools Murrough Landon 28 April 2009.
- LHCb calorimeter upgrade April 15th, News and ideas on DAQ architecture Frédéric Machefert LAL, Orsay.
Relative crate phase measurement Olivier Deschamps Jacques Lefrançois Frédéric Machefert Stéphane T'Jampens Frédéric Machefert – Calorimeter Meeting.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Rainer Stamen, Norman Gee
2009: restart the system: few observations. Hw maintenance week:
Calorimeter Upgrade Meeting - News
Presentation transcript:

Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick

2 Setup for cosmic run Night of February Full C-side ECAL and C-side HCAL Uniform high gain: (ECAL) and (HCAL)‏ Calibration constants of 128 (not really sure...)‏ Trigger rate of 1 kHz, due to hot channels in inner ECAL, data are recorded with these conditions to detect these channels. Then remove Inner ECAL (13 & 14) from L0 path (but not from DAQ path) : 30 Hz. Then set calibration constant in HCAL to 127: 15 Hz.

3 Configuration Selection Boards, L0DU, TELL1, CROC, LEDTSB were configured easily using PVSS (one click to get ready, using shortcuts)‏ More difficult to configure ECAL Front-End boards with PVSS HV were set also using PVSS, by Anatoli PRS crate 0 and associated TELL1s were also included (but no cosmics seen)‏ Trigger Validation Boards configured with CAT L0DU algorithm (Et(electron)>20 and Et(hadron)>3) is applied automatically using the default PHYSICS recipe. Optical channels were aligned automatically and latency was setup correctly using the default recipes:  This could be checked rapidly using the online presenter which showed clear cosmics, also seen live from Clermont-Ferrand.

4 Consecutive triggers We took first data with only one trigger, than time alignment events with 5 consecutive triggers:  We first thought that these events were not correct  But looking into more details, it seems that only the ODIN bank is corrupted during the first events, all other banks are correct (checked with L0DU bank which contains BCIds)‏  Richard found yesterday where it could come from  But this means that these events could be used and really contain the main trigger, plus 2 clock cycles before and after: not yet analyzed.

5 ECAL Hot Channels Readout channel [0-31] FEB-ID (16*crate + FEB) ‏ ECAL Crate #14: FEB 6: channels 28 FEB 7: channels 7, 15, 23, 31 FEB 8: channels 13, 21

6 ECAL ADC (1)‏ No more peaks at 256 and -256: CROCs are all configured correctly. Online presenter allows to check presence of 256 and -256 ADC. Zoom

7 ECAL ADC (2)‏ ECAL11, FEB7ECAL13, FEB12

8 ECAL ADC (3)‏ Problem also visible looking at L0 ADC for the same boards: not a DAQ problem. ECAL11, FEB7ECAL13, FEB12

9 ECAL ADC (4)‏ Only 2 channels affected: ECAL11, FEB7: Channel 12 ECAL13, FEB12: Channel 9

10 ECAL ADC (5)‏ After Removing the 2 bad channels:

11 ECAL 2D-View: Feb vs Channel in feb ECAL 8ECAL 9 ECAL 10ECAL 11ECAL 12ECAL 13ECAL 14 Hot Channels Pb with HV ?

12 HV Problem ? ADC Distribution for channels in the grey zone with channels 3 in crate ECAL12 ADC Distribution for « normal » channels

13 L0ADC vs ADC Relation between 12 bit ADC and 8 bit L0ADC was not correct in previous attempts: fixed in TELL1 firmware. ADC – 8*L0ADC in the range 0<ADC<2048, in ECAL8 where the calibration constant is 128: all problems disappear ADC>2048, in ECAL8: Saturation at 255 of L0ADC: OK ADC<0: L0ADC=0: OK

14 L0ADC vs ADC in ECAL8

15 L0ADC in different crates ECAL 8 ECAL 9 ECAL 10ECAL 11ECAL 12ECAL 13ECAL 14 Calib constant = 127: configuration problem One strange event Calib constant = 0: my attempts to mask hot channels ? ECTell07 problem: see Stephane's talk

16 Configuration problems ? To configure ECAL for Cosmics:  First launch CAT which configures all FEB with calibration constant equal to 127  Then configure all ECAL crates using PVSS (usually takes several times to clear the errors): all FEB should have the calibration constant equal to 128  Then configure only the Trigger Validation Boards with the correct settings, with CAT.  We see boards still with 127 as calibration constants: were the recipes for these boards really applied ?

17 HCAL ADC No Problem in DAQ

18 HCAL 2D Map (ADC vs FEB)‏ HCAL 22HCAL 23 Half BoardsBeam pipe hole 3 Dead Channels ? 3 Hot Channels ?

19 HCAL L0ADC

20 HCAL ADC vs L0ADC Difference between expected and read L0ADC for 127 and 128, as a function of the FEB number 2 FEB with calibration constant of 128, all others with 127: no problem at all for both sets of boards. Default configuration with PVSS is 128. For cosmics run, we changed 128 to 127 for HCAL, for all boards, using PVSS panels: painful process during which I certainly forgot 2 HCAL boards. A cosmics PVSS recipe setting all constants to 127 will be very useful.

21 L0Calo Raw banks: electron max First look at the L0Calo DAQ path ! Trigger Cut Do not expect a perfect match because we read more crates that are used for trigger, and one half-crate is not read correctly. L0CaloL0Calo recomputed from CALO DAQ

22 L0Calo Raw Bank: hadron max Trigger Cut L0CaloL0Calo recomputed from CALO DAQ Strange events below the cut: can be due to a lot of things to be checked further (bad transmission between Selection Boards and L0DU, bug in decoding software of L0Calo banks, in firmware of Selection Board, etc...)‏

23 Conclusions Main problems observed so far (+/-128, L0ADC vs ADC) disappeared:  last cosmics data allow now to see real hardware problems. Setting up calorimeters for cosmics is now rather easy and fast, apart from ECAL Front- End boards and Trigger Validation Boards in PVSS. Still a lot to study (consecutive triggers,...) and probably also other less frequent problems to discover.

24 Gallery (ECAL in black, HCAL in red)‏