Sistema distribuzione laser: pannello del calorimetro C.Ferrari, A.Fioretti, C.Gabbanini, G.Venanzoni INO, UOS Pisa, Via G. Moruzzi 1, 56124 Pisa LNF,

Slides:



Advertisements
Similar presentations
Muon g-2 and SLAC Detector Test T-519 Momentu m Spin e David Hertzog University of Washington.
Advertisements

ECAL Spike Plot Approval ECAL Anomalous Signal Plots Approval Adi Bornheim for ECAL
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group 10th ICATPP Conference on Astroparticle,
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology, on behalf of the CMS ECAL Group High-resolution, high-granularity.
CMS ECAL Laser Monitoring System Toyoko J. Orimoto, California Institute of Technology On behalf othe CMS ECAL Collaboration High-resolution, high-granularity.
GLAST Calorimeter LAT F2F Meeting 17 Mar 2005 Naval Research Lab Washington DC W Neil Johnson 1 Subsystem Mgrs F2F Meeting Calorimeter Subsystem 17 Mar.
Tagger Electronics Part 1: tagger focal plane microscope Part 2: tagger fixed array Part 3: trigger and digitization Richard Jones, University of Connecticut.
RBX PRR - March 1-2, H C A L HCAL RBX PRR Readout Box (RBX) PRR Dan Green HCAL Project Manager.
EMCAL: project update - Italy - LNF - Frascati Fixture production Module assembly (proto) WLS fibers processing Lead procurement (proto) CT- Catania APD.
SLC  Testbed Proposal Jeff Gronberg  working group SC Linear Collider Retreat June 26 – 29, 2002.
1 HF Laser/LED Calibration Studies L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH 1->9 light splitter w/ pulsed.
NA62 Gigatracker Working Group Meeting 2 February 2010 Massimiliano Fiorini CERN.
KM3NeTmeeting Pylos, Greece, April of 12 Mar van der Hoek et al. electronic department PROGRESS ON OPTICAL MODULATORS FOR KM3NeT Mar van der.
Status of EIC Calorimeter R&D at BNL EIC Detector R&D Committee Meeting January 13, 2014 S.Boose, J.Haggerty, E.Kistenev, E,Mannel, S.Stoll, C.Woody PHENIX.
1 to 7 fibres in240 fibres out 25 into SC01 SC01 read out with 25 stephenson preamps Nichia NSPB500S LEDs LED stability pulser tests at RAL Paul, Barbara,
Oct C. Smith - PCAL/EC Commissioning 1 PCAL/EC Commissioning Document
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
1 MICE Tracking Detectors Malcolm Ellis NFMCC Meeting 12 th March 2006.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Stabilization of Focus at ATF2 David Urner University of Oxford.
DVCS-2 Assembly & Installation Charles Hyde DVCS Collaboration Meeting 18 December 2009 Clermont-Ferrand.
Hall D Online Meeting 28 March 2008 Fast Electronics R. Chris Cuevas Group Leader Jefferson Lab Experimental Nuclear Physics Division System Engineering.
1 Prototype Calibration System for Forward Hadron Calorimeter L. Almeida, M. Baarmand, L. Caraway, M. Hohlmann, T. Qureshi, I. Vodopianov FLORIDA TECH.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
Flavio Gatti,Frascati-PSI, Jan 31 th, 06 1 TC status. Flavio Gatti UNIVERSITY and INFN of Genoa, Italy.
Kavita Lalwani, Pooja Saxena, Kirti Ranjan, Ashutosh Bhardwaj Department of Physics & Astrophysics University of Delhi Manoj Sharan High Energy Nuclear.
HBD Gas and QE Monitoring Craig Woody BNL HBD Working Group Meeting October 19, 2005.
V. Sonnenschein, I. D. Moore, M. Reponen, S. Rothe, K.Wendt.
VVS Prototype Construction at Fermilab Erik Ramberg 26 February,2002 Design issues for VVS Details of VVS prototype design Schedule and Budget Testing.
Update on the GRINCH Detector SBS meeting, 21 Oct 2015 T. Averett, W&M JLab, NC A&T, JMU, Glasgow Timing-based gas Cherenkov detector PMT array-510 tubes.
LCTPC photoelectron calibration system D. Karlen / U. Victoria & TRIUMF LCTPC subsystems meeting DESY, February 25-26, 2008.
Phase Coding System tests at Milano CTF3 Technical meeting CERN 20/1/2008 I. Boscolo*, S. Cialdi, D. Cipriani.
18 December 2007 ATF Damping Ring BPM System Upgrade Joe Frisch, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, Mark Woodley (SLAC) Charlie Briegel,
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
Gain stability and the LYSO beam radiation monitor measurements
Linearity Tests The laser induced high noise pulses on the APD rendering it useless. We tried several methods to shield and filter the noise. With a stabilized.
first results from EMCal test beam
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
FT Prototype Test Purpose: test the prototype of the FT Calorimeter and Scintillator Hodoscope Technique: prototype is installed under the Hall B photon.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
MINER A at the Triple Point: Three Phases at once Deborah Harris AEM August 31, 2009.
CDMS II Shielding To Installation To Construction From Design.
Sergey BarsukElectromagnetic Calorimeter for 1 Electromagnetic Calorimeter for the LHCb experiment Perugia, Italy March 29 – April 2, 2004 ECAL CALO Sergey.
LCGT Meeting Laser & Mirror 12 December, Laser Ordered fiber amplifiers made by Nufern will be shipped on 16 th December. After the amplifiers arrive.
Study of the MPPC for the GLD Calorimeter Readout Satoru Uozumi (Shinshu University) for the GLD Calorimeter Group Kobe Introduction Performance.
G-2 Calorimeter test beam “ T-519 has been assigned beam time is from Thursday July 17 to Monday morning July 27 at ESTB” LCLS is operating lower beam.
Update su sistema distribuzione laser: pannello del calorimetro C.Ferrari, A.Fioretti, C.Gabbanini, G.Venanzoni INO, UOS Pisa, Via G. Moruzzi 1,
Energy and time resolution for a LYSO matrix
Profiler Mechanics Update
Calibration System Updates 27/4/2017
Why we need an improved LASER calibration system
Mu2e crystals qualification
INSIDE in-beam PET system assembly and test at INFN Torino
Claudia Cecchi University of Perugia and INFN
The interaction region for FIRST (status report)
PMT cabling Gian Luca Raselli INFN Pavia
Plans from last meeting
Report on Working Group # 2 The MU2E detector
CMS ECAL Calibration and Test Beam Results
Instrumentation for Colliding Beam Physics 2017
Directional Optical Module Integration
Overview on calorimetry R&D for FACTOR (Messina/Trieste/Udine approach) (V. Bonvicini et al.) A. Penzo (June 4, 2008)
Electron cloud studies at CESR
Injector Drive Laser Technical Status
Presentation transcript:

Sistema distribuzione laser: pannello del calorimetro C.Ferrari, A.Fioretti, C.Gabbanini, G.Venanzoni INO, UOS Pisa, Via G. Moruzzi 1, Pisa LNF, INFN Frascati

f DAQ, Slow Control laser1 laser2 laser3 laser4 laser5 laser6 Laser control Source Monitor Fiber collimator Laser hub Diffuser Calorimeter Local Monitor X 24 T80/R20 50/50 filter wheel PANEL Fibre lancio al centro ring – stazioni calorimetriche Sistema distribuzione laser

Diffusore sphere no lens with lens no lens Engineered diffuser ED1-S20 by RPC Photonics – Thorlabs

Diffusore + bundle

+/- 5V Bias x 4 Comm HDMI breakout Air below

PMMA fiber Prism PbF 2 crystal SiPM Panello 1° prototipo PVC

2° prototipo in Delrin 1X9

Output power from panel n.fibra Red: output from fiber Blue: output after coupling Green: ratio blue/red Fibre 1 mm PMMA Prismi 8 mm senza a.r. coating

Output power from two fibers

Light distribution out of crystal Fiber 1mm PMMA NA=0.49 Disomogeneity 3% on 12 mm 1D

Distribution system transmission: 6 lasers/ 24 diffusers Required value of the output of each crystal: 0.01 pJ/pulse (el. 2GeV); for each calorimeter: 0.6 pJ/pulse Element Transmiss ion Energy (pJ) Notes Laser Picoquant output750100% current intensity Source monitor sampling80% pJ/pulse for the source monitor (2 PD and 1 PMT) Filter wheel100%600 Division into four fibers 25% 150 Fiber coupling + 25 mt quartz fiber 70% 105Measured Diffuser with bundle (54 fibers) + 3 local monitors 10%10.5 It can increased by reducing uniformity 1 mt bundle POF (200 dB/km) 90%9.5 Prism coupling 65% 6.1 Prism with anti-reflection coating and with metallized reflecting face PbF 2 crystal reflection + absorption (20%) 65% 4.0 Total per calorimeter4.0Required: 0.6 pJ /pulse /calorimeter Not included: Beam splitting losses (mirrors, b.s.) Counter-panel losses

Stability of distribution system (a few pJ/pulse at the PINs) Laser launching fiber (  600  m) Fibers PMMA 1mm diffuser PIN2+CREMAT PIN1+CREMAT CAEN DT5730B systematics ~ /h

Conclusioni Il sistema di distribuzione laser è ben definito Prototipo di pannello testato; pannello completo (6x9) in costruzione a breve Sistema a 6 laser / 3 laser da definire dopo il test beam a SLAC Primi ordini per costruzione apparato (12 diffusori completi, fibre lancio,..) ad ottobre

Calo version... 1) December 2016 milestones (can be earlier) UW builds complete module carries out local tests for cooling, system performance, etc. Naples sends a Flight Simulator to Seattle for us to begin incorporating it into our light flashing system. UVa/JMU has provided commercial bias supplies for a full calorimeter (4) and the +/-5V distribution. Also provides needed cabling Cornell and Kentucky have completed tests at Fermilab of digitizers and DAQ "Offline" tools available to reconstruct pulses, make histograms, etc. 2) January Week 1. Pisa team has delivered completed Front Panel, Bundle, Light Distributor, Laser and Splitters. 3) Februrary Week 1. Cornell delivers crate of Riders Week 1. Kentucky delivers DAQ.and associated bundle, laser, etc, to drive. Someone (Wes?) needs to be in Seattle for a week of shakedown and expertise transfer. This month used for running with Flight Simulator and for writing analysis and diagnostic codes. 3) March. Week Buffer for any delays Week 4. Packing for shipment to SLAC. 4) April TEST BEAM TIME AT SLAC Week 1. Arrive SLAC; Build installation Week 2. Tracker tests day; Calo test night Week 3 Calo tests day; Tracker night Week 4 Combined data taking 5) May Analysis 6) June 1st. Calo kits shipped to FNAL to begin assemble All Laser Front Panel kits also arrived FNAL for assemble... etc Professor David Hertzog University of Washington Department of Physics Box Seattle, WA (206)

SPARES

Transmission coefficient- diffuser Inhomogeneity strictly connected with transmission coeff. Measurements with/without collimating lens changing the distance diffuser-bundle or lens/bundle

Transmission coefficient- diffuser Inhomogeneity strictly connected with transmission coeff. Best results: without lens 5.7% in a bundle group T= (new with square pattern diffuser: 4%) with lens 7% in a bundle group T= sphere no lens with lens

Diffuser no lens with lens 2% inhomog. on 0.2 mm in the central zone