Stephen Wood NPS Collaboration Meeting November 19, 2014 Hall C Status And Lab Perspective on NPS.

Slides:



Advertisements
Similar presentations
Super BigBite concepts Bogdan Wojtsekhowski, JLab
Advertisements

Ioana Niculescu James Madison University August 15, 2013.
Hall C SHMS Fringe Field Analysis Michael Moore Hall C Winter Meeting
Measurement of the  n(p)  K +   (p) at Jefferson Lab Sergio Anefalos Pereira Laboratori Nazionali di Frascati.
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
PAIR SPECTROMETER DEVELOPMENT IN HALL D PAWEL AMBROZEWICZ NC A&T OUTLINE : PS Goals PS Goals PrimEx Experience PrimEx Experience Design Details Design.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
SoLID EC Update Zhiwen Zhao 2012/05/22. Beam test update Coverage for PVDIS Road map.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
SHMS Optics and Background Studies Tanja Horn Hall C Summer Meeting 5 August 2008.
AM Software Review. Hall C after 12 GeV Upgrade Beam Energy: 2 – 11 GeV/c Super High Momentum Spectrometer (SHMS) –Horizontal Bender, 3 Quads, Dipole.
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
Hall C Meeting SHMS Magnets and Support Structure Design and Procurement Status Paul Brindza January 26, 2009.
12 GeV Upgrade Project Status Allison Lung Hall C Users Meeting Jefferson Lab January 18, 2008.
SHMS Optics Studies Tanja Horn JLab JLab Hall C meeting 18 January 2008.
AM Software Review. Hall C after 12 GeV Upgrade Beam Energy: 2 – 11 GeV/c Super High Momentum Spectrometer (SHMS) –Horizontal Bender, 3 Quads, Dipole.
A N DY Status Commissioning with colliding beams (p  +p  at  s=500 GeV) L.C.Bland, for AnDY 8 March 2011 Time Meeting, BNL.
PV-DIS Toroid Detector: outline and costs Paul E. Reimer 12 GeV PV-DIS detector meeting August 1.Introduction to Toroid Concept (presenting work.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Hall-C 12 GeV Project Status Howard Fenker 1/30/09 Hall-C January 2009 Workshop Overall schedule Detector Schedule What have people been working on? Reviews.
Comments from Physics Division Rolf Ent Associate Director for Experimental Nuclear Physics SOLID collaboration meeting, February 03, 2012 Thomas Jefferson.
Jefferson Lab Update R. D. McKeown Jefferson Lab HPS Meeting June 16, 2014.
Understanding the Origin of the Nucleon Spin Andi Klein, Melynda Brooks, Pat McGaughey and Matt Stettler Research Goals: Use Deeply Virtual Compton Scattering.
HPS T EST R UN C ONTINGENCY P LAN S. Stepanyan JLAB.
Welcome to Jefferson Lab R. D. McKeown Jefferson Lab Hypernuclear Workshop May 27, 2014.
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
June 17, 2004 / Collab Meeting Strategy to reduce uncertainty on a  to < 0.25 ppm David Hertzog University of Illinois at Urbana-Champaign n Present data.
Latifa Elouadrhiri Jefferson Lab Hall B 12 GeV Upgrade Drift Chamber Review Jefferson Lab March 6- 8, 2007 CLAS12 Drift Chambers Simulation and Event Reconstruction.
CEBAF The Continuous Electron Beam Accelerating Facility (CEBAF) at JLab in Newport News, Virginia, is used to study the properties of quark matter. CEBAF.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
Fiducial Cuts for the CLAS E5 Data Set K. Greenholt (G.P. Gilfoyle) Department of Physics University of Richmond, Virginia Goal: To generate electron fiducial.
MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.
Transverse Momentum Dependence of Semi-Inclusive Pion and Kaon Production E : Spokespersons Peter Bosted, Rolf Ent, Hamlet Mkrtchyan 25.5 days.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Budget Status and FY03 Requests Elton Smith Hall D Collaboration Meeting Sep 12-14, 2002.
Dual Target Design for CLAS12 Omair Alam and Gerard Gilfoyle Department of Physics, University of Richmond Introduction One of the fundamental goals of.
FSC Status and Plans Pavel Semenov IHEP, Protvino on behalf of the IHEP PANDA group PANDA Russia workshop, ITEP 27 April 2010.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
The 12 GeV equipment Hall D – Hall D – GLUEx detector for photoproduction experiments Hall B – Large acceptance detector CLAS12 for high luminosity measurements.
HPS Summary Costs, Manpower, Schedule John Jaros Searching for a New Gauge Boson at JLab Jefferson Laboratory September 20, 2010.
COMET μ-e conversion search at J-PARC. μ-e conversion physics SUSY-GUT, SUSY-seesaw (Gauge Mediated process) – BR = = BR(μ→eγ) × O(α) – τ→lγ SUSY-seesaw.
Hall C - 12 GeV pCDR Max. Central Momentum 11 GeV/c 9 GeV/c Min. Scattering Angle 5.5 deg 10 deg Momentum Resolution.15% -.2% Solid Angle 2.1 msr 4.4 msr.
Experiment Readiness Review P. Rossi – Hall C Coll. Meeting Jan 21, 2016.
Early Career Internal Review Measurement of Double DVCS using SuperBigBite Spectrometer Nuclear Physics Alexandre Camsonne.
Septum Magnets in Hall A Hall A Collaboration Meeting 6/10-11/2010 John J. LeRose.
1 Melynda Brooks, “Understanding the Origin of the Nucleon Spin” Understanding the Origin of the Nucleon Spin Andi Klein, P-23, Melynda Brooks P-25, Pat.
JEFFERSON LAB CLOSE-OUT 6 GeV  Finish analysis on CLAS eg1-DVCS (SSAs + DSAs in   production with longitudinally polarized H and D targets) and.
Status of Hall C 6 GeV Analysis Software Robust Fortran/CERNLIB code, “ENGINE”, for analysis of HMS/SOS coincidence and single arm experiments that has.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
Fiducial Cuts for the CLAS E5 Data Set K. Greenholt (G.P. Gilfoyle) Department of Physics University of Richmond, Virginia INTRODUCTION The purpose of.
BSM Group Activities DUNE Collaboration Meeting –ND Physics Jan. 14, 2016 Jae Yu Univ. of Texas at Arlington.
CALOR 2012 Vardan Tadevosyan XVth International Conference on Calorimetry in High Energy Physics Santa Fe, NM, June 4 – 8,
Stephen Wood DVCS meeting November 12, OUTLINE Brief Hall C Overview 6 GeV 12 GeV Examples of pi0 and photon detection in Hall C Potential pi0 and.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
Aerogel Čerenkov Requirements for the SHMS ( e,e’K + ) Program Hall C User’s Workshop, August 7, Garth Huber.
12-GeV Upgrade of Hall-C: Project Scope and Status
Jefferson Lab Overview
IHEP group Shashlyk activity towards TDR
Overview of CLAS12 Calibration
Preparation of the CLAS12 First Experiment Status and Time-Line
AM Software Review.
Schedule Rolf Ent HPS Meeting, May 22, 2018.
Early running planning process
SOLID Collaboration Meeting
Presentation transcript:

Stephen Wood NPS Collaboration Meeting November 19, 2014 Hall C Status And Lab Perspective on NPS

Hall C Status – SHMS Structure Assembly 2 Bogies on SHMS Rail

Slide 3

Dipole Magnet Coil Winding Mold being placed onto Dipole Coil “B” Layers 1&2 in preparation for VPI (May 27, 2014). Dipole Coil “A” Layer 3 being wrapped and readied for winding layer 4 (May 27, 2014).

SHMS Detectors Detector stands and preshower Heavy gas Cerenkov Aerogel assembly and testing

Slide 6 Somewhat obsolete, but only “public” schedule

Hall C Timeline MagnetDelivery Date Q1January o Horizontal BenderFebruary 2015 DipoleDecember 2015 Q2, Q3January/Feb 2016 Mid 2013 SHMS installation began Fall 2013 SHMS Shield house 2014 (Pre) Shower counter and electronics/DAQ 2015 Detector installation July 2016 First beam Commissioning Experiments in Hall C

High Impact Experiments (PAC41)

Early running plans – Year : Precommissioning – detector checkout ~25 PAC days – Commissioning “Experiment” 9 days of E search for color transparency A(e,e’p) only – “easy” coincidence measurement E F 2 p,d structure functions at large x Momentum scans help understand acceptance 2 days E EMC Effect Integrate light nuclei with F 2 run, Point target helps acceptance studies. 3 days of E d(e,e’p) If time available Push to lower cross sections

Early running plan – Years : E P t dependence of basic SIDIS cross sections Push particle ID capabilities of SHMS E Precise  +  - ratios in SIDIS – Charge Symmetry Detector efficiencies E L/T separated p(e,eK + ) factorization test Easiest L/T separation 2018: Choose a “High Impact Experiment”? E Pion Form Factor (needs well understood SHMS) E x>1 E A 1 n (needs high Luminosity 3 He) g 2 n, GeN?

SHMS Fringe Fields Potentially Mitigated by extra iron bolted to HB and iron pipes around beamline at strategic locations. Are sweeper magnet fringe fields an issue? Iron pipes on beamline not desirable.

Hall C Analysis Software Upgrade FORTRAN ENGINE analysis code being replaced with C++/ROOT analyzer Based on Hall A analysis software Ease sharing of software and people with Hall A Easier to reuse code between HMS & SHMS Likely easier and more natural to add new detectors (done often in Hall A) Status Code, “hcana”, managed with “git” on github.com Supports CTP like parameters and reports. Hall A cut and histogram definition package similar to CTP DC Tracking code ported, Shower counter, hodoscopes, Cerenkov Basic support for most HMS/SOS detectors and spectrometer optics Best/Golden track selection in progress

Lab Support NPS receiving appropriate support from Halls A, C and Physics division Small scale R&D spending Parasitic in beam tests (Hall A) Lab space, DAQ test stands Design & Engineering Support for visiting scientists SHMS electronics available for NPS experiments Much “evidence” of lab support that can be pointed to

Capital Projects An NPS specific capital project not envisioned at this time: Don’t want same level of “help” as for example SBS but do want DOE awareness, to help with external funding (e.g. MRI) Two Physics Division capital projects directly help NPS. Small enough to avoid formal DOE oversight. Fast Electronics This capital equipment project is to provide sufficient fast pipelined electronics at Jefferson Lab to serve a third large-acceptance device running simultaneously with CLAS12 and GlueX. In its first phase, it pre-buys electronics components that may become obsolete, such as FPGAs for the flash ADCs. In a second phase, it would augment this with the fast pipelined electronics to serve large ancillary detectors on the floor for out- year experiments. Included in last year’s capital projections given to DOE. FPGA purchases for flash ADCs have been made. High Resolution Calorimeter This capital equipment project follows up on the foreseen need in the out-years of large-acceptance PbWO4 neutral-particle calorimeters that have been part of highly-rated approved experiments in Hall C, and are part of proposed rare eta decay experiments in Hall D. Will be included in labs capital projections to DOE if DOE guidance is optimistic in light of favorable House and Senate bills.

Lab Perspective Five experiments approved to use NPS, three with A/A- rating. On radar at directorate level. Experiment physics topics part of 12 GeV physics “mission” Provides a natural extension to L/T separation capability of Hall C NPS experiments should run after “high impact” experiments and some healthy usage of SHMS Perhaps work toward physics division review with DOE observers like done with Hall B RICH

Slide 16