Software Troubleshooting Eliminate possible programming and timing errors by stopping all programs ( and ). Use the Executive program terminal and send.

Slides:



Advertisements
Similar presentations
SPiiPlus Feedback Tuning
Advertisements

Managing Cisco IOS Software. Overview The router boot sequence Locating IOS software The configuration register Recovering Passwords Backing Up the Cisco.
PMAC-NC Standard Header Files, PLCs and Motion Programs.
Troubleshooting Training Course.  Visual and General Test  Perform System Test (Mode  Perform System Test)  Identify The Error  If you need Technical.
InnoSys Process Sequence. End Effector Components End Effector Prox Switch Load Cell Wire Conduit Crows Foot Nut Runner.
In this presentation you will:
Delta Tau Coordinate Systems and PLCs at Diamond Matthew Pearson Controls Group, Diamond Light Source Overview: Delta Tau Geobrick motor controller Delta.
Main Components of a CNC System
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
KX-NS1000 Initial Set Up For step by step : 16 May,
5300 CNC CONTROL TRAINING GUIDE. 1. Turning the Control ON After the control has been turned ON press F10 to continue. Then press ENTER to select CNC.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.1 Module 6 Switch Configuration.
Introduction to LabVIEW 8.5
Timers and Interrupts Shivendu Bhushan Summer Camp ‘13.
Microprogrammes control the KOMBIS TMM8003. For the reliable operation of its systems and devices there are several programs located in two controllers.
EZ Positioning with SINAMICS S120 Agenda
1 Semester 2 Module 2 Introduction to Routers Yuda college of business James Chen
A walkthrough of the SageQuest Mobile Control Online & ESC integration.
EPICS Meeting, APS, June 14 th 2006 MCS-8 The 8 axes motion control system Rok Šabjan
COMPUTER MANAGEMENT. System start-up Before switching on a computer, make sure that all the components are properly connected. The computer must be connected.
Workflow Manager and General Tuning Tips. Topics to discuss… Working with Workflows Working with Tasks General Tuning Tips.
PowerFlex 755 DeviceLogix
DELTA TAU Data Systems, Inc. 1 UMAC TurboTurbo PMAC PCIGeo Drive Single Source Machine Control motion logic data Power PMAC Project Management November.
1 © 2003, Cisco Systems, Inc. All rights reserved. CCNA 3 v3.0 Module 6 Switch Configuration.
Copyright © 2007 Heathkit Company, Inc. All Rights Reserved PC Fundamentals Presentation 43 – The Network Interface Card (NIC)
Power PMAC Electronic Cam Tables April 2014
DELTA TAU Data Systems, Inc. 1 UMAC TurboTurbo PMAC PCIGeo Drive Single Source Machine Control motion logic data Power PMAC Data Structures January 2012.
MICROPROCESSOR INPUT/OUTPUT
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
How to use Touch Screen SeneS Technology. Co, Ltd.
DELTA TAU Data Systems, Inc. 1 UMAC TurboTurbo PMAC PCIGeo Drive Single Source Machine Control motion logic data Power PMAC Operational Summary November.
Turbine Crane CRANES TURBINE NEA39. Turbine Crane PLANT STATUS! PV Daily Status Report.
Date: File:PRO1_12E.1 SIMATIC S7 Siemens AG All rights reserved. Information and Training Center Knowledge for Automation Troubleshooting.
Chapter 10 Advanced Programming, PLC Interfacing, and Troubleshooting
Advantage 900 PMAC-NC Pro2 CNC AutoPilot Utility.
© 2004, D. J. Foreman 1 Computer Organization. © 2004, D. J. Foreman 2 Basic Architecture Review  Von Neumann ■ Distinct single-ALU & single-Control.
Introduction to LabVIEW 8.5
© 2004, D. J. Foreman 1 Computer Organization. © 2004, D. J. Foreman 2 Basic Architecture Review  Von Neumann ■ Distinct single-ALU & single-Control.
Microcontrollers Module 3: Digital Display. 7 – Segment Display A seven-segment display (SSD), or seven- segment indicator, is a form of electronic display.
11 INSTALLING AND MANAGING HARDWARE Chapter 6. Chapter 6: Installing and Managing Hardware2 INSTALLING AND MANAGING HARDWARE  Install hardware in a Microsoft.
Sem 2v2 Chapter 5 Router Startup and Setup. A router initializes by loading the bootstrap, the operating system, and a configuration file. If the router.
DELTA TAU Data Systems, Inc. 1 UMAC TurboTurbo PMAC PCIGeo Drive Single Source Machine Control motion logic data Power PMAC Shared Memory December 2013.
1 i-Pendant for the R-J3iC & R-30iA Controllers ArcTool Version (GMAW) i Pendant New.
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
By the end of this lesson you will be able to explain: 1. Identify the support categories for reported computer problems 2. Use Remote Assistance to connect.
Copyright © 2014, 2008 Pearson Education, Inc. Publishing as Pearson Addison-Wesley Starting Out with C++ Early Objects Eighth Edition by Tony Gaddis,
SEMINAR ON P.L.C. SUBMITTED BY HRIDAY MUKHERJEE AMIT DEBNATH SOMNATH SHIL
SPECIAL FUNCTIONS ON ASDA-A2. To Audience Advance level This slide will teach some special functions on ASDA-A2. For better understanding the content,
© ABB Entrelec AC 500 Page SD Memory Card Insert image here The Application of the SD Memory Card Advant Controller 500.
INTEGRATED SUBSYSTEM BUILD & TEST ANDRE PELLETREAU, JEREMY WILLMAN, KAI MASLANKA, VINCENT STOWBUNENKO, & KERRY OLIVEIRA.
Copyright © 2015 Rockwell Automation, Inc. All Rights Reserved. PUBLIC PUBLIC CO900H L06 - Developing Safety Applications Using the Guardmaster®
SPiiPlus Training Class
CCNA 2 v3.1 Module 2 Introduction to Routers
Getting started with the Arxterra software and 3DoT Firmware
Do-more Technical Training
IBM PC Controlled Keypunch4b
Router Startup and Setup
Tool removed during cycle Fault #2
Newly Released PLC product
CONFIGURING HARDWARE DEVICE & START UP PROCESS
Programmable Logic Controllers (PLCs) An Overview.
Chapter 1: Introduction to Computers and Programming
NC,CNC machines and Control Programming.
Router Startup and Setup
Controller interfaces
Managing Cisco IOS Software
Chapter 1: Introduction to Computers and Programming
Presentation transcript:

Software Troubleshooting Eliminate possible programming and timing errors by stopping all programs ( and ). Use the Executive program terminal and send on-line commands. Know the PMAC’s “Chain of Command”, what order things must happen in PMAC. 1. Proper encoder counts per revolution. Both directions! 2. DAC output gives proper encoder count direction? 3. No faults in Status Screens. Look at FULL status, not condensed status.

UMAC Hardware Troubleshooting Eliminate possible hardware conflicts by disconnecting as much as possible and using a “Known” GOOD configuration. I use a demo-box whenever possible. Now the software should reflect the input status and the outputs should reflect the commands. If not, is there a software reason for this? Does the “connector status” screen see the inputs? Does a voltmeter see the inputs and outputs? Can you point an M-variable at the source? M102->DAC

Machine Troubleshooting If you have followed the previous two slides, then you should know if the trouble is internal or external to PMAC or external. Try measuring or commanding to I/O directly with the PMAC disconnected and using a voltmeter to see the changes.

UMAC Troubleshooting Tools l PMAC Executive Software –Motor Status l Fatal Following Error, Amplifer Fault, Position Limits –Coordinate System Status –Program Status –Data Gathering -- Motion Programs: List PE, S, % l Manuals l Schematics l Multi-Meter, Oscilloscope l Gauge Wire l Extra Motors, Amplifiers, & Cables

UMAC Troubleshooting Examples l Definition of Working System l Position Feedback l Motor not Running l Inputs/Outputs not working l Watchdog Timer l Changing Firmware

Definition of Working System l If it is a traditional Servo system –Position Limits (if it is a linear axis) –Home Flags –Motor can servo (closed loop) l Jog and Run Motion Programs l Has proper PID settings for the application l Homing has been setup l Machine I/O is working l Emergency Stop Procedure is working l Complete back-up of Source Code and UMAC Configuration files

No Position Feedback l Check I4900 to make sure UMAC sees the Servo Card l Check Encoder Decode parameter I7mn0 l Check Encoder Conversion Table Setup (I8000-I8191) l Check Ixx03 (and Ixx04) for proper assignment l Check 5V supply to encoder l If quadrature encoder, check Gate Array up/down counter –Suggested M-variable Mxx01 points to this location l Check the encoder inputs to UMAC with Oscilloscope l Check Encoder Shields

Motor Does Not Move l Check I4900 to make sure UMAC sees the Servo Card l Check I7mn6 (Motor Output Mode) l Check Fatal Following Error l Check ± 15V supply for DAC’s l Check Limit Status –If limits are active motor will not move l Change Ixx24 if necessary l Check Ixx25 to see if Amplifier Enable is directed to proper memory location l Check Ixx02 to see if Effort Command is directed to proper location l Check PID and/or Motor parameters –If at defaults, motor might not move l Check Feedrate Override (% Command)

Machine IO Troubleshooting l Inputs are not Working –Check indicator LED’s –Check Inputs Directly at UMAC memory location –Make sure IO board is addressed properly –Check the actual input state coming into IO card. –Check power to Card l Outputs are not working –Write Directly to output UMAC memory location –Make sure IO board is addressed properly –Check indicator LED’s –Check power to Card To troubleshoot Inputs or Outputs the user may have to turn off the PLC which is servicing the read/write functions of the hardware. If problems persist you can re-initialize the card to factory defaults and create simple definitions to the memory locations.

UMAC Watchdog l Watchdog occurs immediately at power-up –Check 5V supply –Not enough background time? –Re-initialize UMAC to Factory Defaults (E3) and download working Source Code or UMAC Backup configuration l Watchdog occurs randomly –Check 5V supply –Check Watchdog Timer counter (M7000->Y:$000025) –Run PLC’s one at a time If problems persist you can re-initialize the card to factory defaults and then download and run programs one at a time

Changing Firmware l Obtain firmware file from Delta Tau l Make a backup configuration file (or know where the files are at your company) l Power Down System l Jumper E23 to put UMAC into bootstrap mode l Download TURBO2.BIN for UMAC using PMAC Executive Software l Power down system and remove bootstrap jumper (E23) l Download configuration file or source code to the UMAC l SAVE configuration to UMAC memory l Restart UMAC ($$$ command or cycle power)

Important Information l Where are the Delta Tau Hardware and Software References located at your company? l Where is the known working Backup Configuration file for your machine? l Where is the known working Source Code for your machine? l Where is the PMAC Executive Software CD? l Who is the machine integrator? –Name and Company

Our Test System On our test system here we have. 1. KNOWN hardware state. 2. KNOWN software state. We clear memory and load our own programs. With this we check all major connections. This includes gate-arrays, DAC’s, opto-couplers, and line-drivers.