Over 100 hundred submissions received 52 proposals (some multiple options) 3 gaps identified 58 Templates for first sift 10 surface transport proposals.

Slides:



Advertisements
Similar presentations
Experience of Turkmenistan in the use of IEA for Decision Making Irina Mamiyeva.
Advertisements

Health impact assessment explained
Challenges in Finding and Connecting New Water Sources J. Tupling, P.Eng. June 22, 2009.
Airports Commission Stakeholder Briefing: 20 th February 2013 Philip Graham Head of Airports Commission Secretariat.
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
Airport Sustainability is a holistic approach to managing an airport to ensure Economic viability, Operational efficiency, Natural resource conservation,
Evaluation framework climate-proofing (Netherlands) EEA meeting on adaptation indicators 3-4 September 2008 Rob Swart Alterra.
Energy National Policy Statements Anne Stuart DECC Energy Development Unit 22 October 2009.
Environment case Episode 3 - CAATS II Final Dissemination Event Brussels, 13 & 14 Oct 2009 Hellen Foster, Jarlath Molloy NATS, Imperial College London.
Copyright 2009 Northumberland County Council Northumberland Local Plan Core Strategy Update Riding Mill Parish Council 28 April.
Towards Action Planning Linda Story Air Noise and Nuisance Team.
Feasibility Study Preparation Venelina Varbova. Session Overview  Purpose of the Feasibility Study  The Feasibility Study process according.
BMT Cordah Limited 1 Offshore Wind Energy Strategic Environmental Assessment (SEA) Phase 1 “Progress and Lessons” Mark Jennison and Trevor Baker BMT Cordah.
Energy National Policy Statements Nick Cooper DECC.
Air Quality and Land Use Planning Land Use Consultants 11 th March 2008 Susanne Underwood.
1 Directorate-General for Energy and Transport / Air Transport Directorate EU Directive on Airport Charges Background and content.
Somerset County Council Climate Change Strategy Abigail Stretch Sustainable Development Officer.
ACT CANADA 2014: Using Business Cases To Get Great Projects Financed and Delivered December 1, 2014| Michael Sutherland.
Delivery Methodology.
SCATTER WORKSHOP KARI LAUTSO / LT CONSULTANTS SCATTER SPRAWLING CITIES AND TRANSPORT: FROM EVALUATION TO RECOMMENDATIONS SCATTER WORKSHOP MILAN,
Preparing a Development Plan A councillor’s view.
Forward Planning. 3 components: i) Forward planning Plans (County Development Plan and 12 Local Area Plans) Strategies (Housing/Retail/Wind) Studies (Housing.
SEEA Experimental Ecosystem Accounts: A Proposed Outline and Road Map Sixth Meeting of the UN Committee of Experts on Environmental-Economic Accounting.
Aberdeenshire Local Development Plan 2016 Identification of issues.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
Inventory, Monitoring, and Assessments A Strategy to Improve the IM&A System Update and Feedback Session with Employees and Partners December 5, 2011.
Better Business Cases “Investing for change” Overview
Partnership for Urban South Hampshire Sustainable Growth.
Anna Donald Marine Planning and Strategy Marine Scotland
EVALUATION AND APPRAISAL REPORT MAJOR COMMUNITY ISSUES RELATED TO COMPREHENSIVE PLAN Board of County Commissioners/ Local Planning Agency Joint Meeting.
GREATER BIRMINGHAM & SOLIHULL LOCAL ENTERPRISE PARTNERSHIP AREA Priority Axes 4 & 6 - Calls Workshop Supporting the shift towards a low carbon economy.
SOUTH EAST PLAN South East Plan ESPACE - reminder Aim Incorporation of adaptation to climate change within spatial planning mechanisms at local, regional,
1. Hybrid Planning Application Detailed Application = Stadium and related infrastructure Outline Application = Enabling development sites 2.
Kingsclear Consolidated School Parent / Community Meeting November 29, 2010.
The TIDE impact assessment methodology TIDE Final Conference Barcelona, September 2015 Wuppertal Institute for Climate, Environment and Energy Oliver.
Infrastructure planning Sustainable Development Partnership 21 April 2009 Sustainable Development Partnership work programme discussion Designing the social,
Sustainability Appraisal. SA process Stage A (Scoping) complete – Scoping Report consulted on from the 7 th April to 12 th May 2008) Stage B and C started.
Lecture(9) Instructor : Dr. Abed Al-Majed Nassar
Noise Policy Options for Farnborough Airport – Presentation on work carried out by Hepworth Acoustics for Rushmoor Council Peter Hepworth Thursday 31 st.
Planning for the future of our district Core strategy options Presentation to C4B Associates February 2010.
FLOOD RISK MANAGEMENT The next steps. The National Technical Advisory Group On Flooding Issues An Overview and the Future.
PLANNING, TRANSPORTATION & ESTATES WASTE PLANNING ISSUES Mark Jones Deputy Director.
Greater Manchester a resilient city region U-Score Essential 5 In partnership with: European Commission Humanitarian Aid & Civil Protection Salford United.
Environment SPC 24 th June 2015 New Climate Change Strategy.
Environment SPC 24 th June 2015 Draft Dublin City Development Plan
Building Resilience Well-being of Future Generations Act and the Environment (Wales) Bill Emily Finney – Resilience Policy, Welsh Government.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
The planning response to climate change Peter Bide Planning Directorate Office of the Deputy Prime Minister Peter Bide Planning Directorate Office of the.
Philip Graham Head of Secretariat Airports Commission June 2014.
State of Natural Resources Report Ruth Jenkins. Sustainable management of natural resources State of Natural Resources Report (SoNaRR) State of Natural.
Marine Planning since 2011 Linda Rosborough – Director of Marine Scotland.
Nigel Hannam and David Phillips Parish Conference – 11th September 2013 Balancing Development.
Excellence in Collections Introduction & Overview December 2014 EXCELLENCE IN COLLECTIONS.
Evaluating the benefits of SuDS Using CIRIA’s BeST July 2015 Elvetham Heath, Hampshire 1.
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
ULI Symposium: Central City Commercial Development 1988.
12 th April  What is it?  Why now?  Who’s doing it?  What are the benefits?  What will the plan look like?  How is it done?
European Truck Platooning Challenge Conference HGV Platooning Trial in the UK Ian Thompson Senior Technology Advisor Highways England.
Site Specific Proposals Local Development Document Background Papers Presented by Julia Baish 9 November 2011.
Planning Explained Module 4 – Engaging with Neighbourhood Planning.
Condover Parish Neighbourhood Plan
The Feasibility Study: something we already know
Vale of Aylesbury Local Plan
The Investment Assessment Framework
Infrastructure planning and management
Feasibility Study Preparation Venelina Varbova
England’s Economic Heartland Strategic Alliance A National Policy Statement for the Heartland? Robbie Owen, Partner and Head of Infrastructure Planning.
A Blueprint to safeguard Europe’s Water Resources
DG Environment, Unit D.2 Marine Environment and Water Industry
Presentation transcript:

Over 100 hundred submissions received 52 proposals (some multiple options) 3 gaps identified 58 Templates for first sift 10 surface transport proposals compressed into 3 options 1 “no new runways / airport operations max” option 1 do nothing / assessment of need Phase 1 Long Term Options in numbers Result = 3 credible options shortlisted, 1 option subjected to further work to assess credibility

Cost Each promoter had different assumptions –Risk amount –Surface transport –Unknown quantity Noise Promoter used different models to assess noise if at all –INM v. ANCON –No noise measurements 2 There were many differences in methodology and level of detail between proposals Comparison required equalisation of methods

Over 80 submissions received 25 objectives 16 modules 5 design elements 3 options to appraise (possibly 4) 1 business case and appraisal of sustainability per option 1 consultation Phase 2 Appraisal Framework in numbers Result = Government receives a recommendation of how to ensure the UK maintains its aviation hub status and materials to support preparation of a National Policy Statement

Cost Delivery People Economy Operations Phase 2 Appraisal Framework Strategic Fit Economy Impacts Local Economy Surface Access Quality of Life Community Cost and Commercial Viability Delivery Operational RIsk Operational Efficiency Noise Air Quality Biodiversity Carbon Water and Flood Risk Place Environment Business case

What’s in a module: Noise 5 Measurement Metrics N70, LAeq, L DEN Tranquility Amenities Monetisation Health Qualitative assessments Operations Technology Location Households Population Land area

Noise Scorecards 1 6

Noise Scorecards 2 7