Emergency dump update 2. M. Solfaroli – 23/10/2015 Goal 2 GENERAL STRATEGY Force open the BIS loop Generate an internal fault in the LBDS Scrape the beam.

Slides:



Advertisements
Similar presentations
Stéphane Gabourin TE/MPE-EP 21 st March 2014 BIS & SMP changes for Run 2 SPS – Extractions – Injections – LHC.
Advertisements

Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
Etienne CARLIER AB/BT/EC
12/03/2013MPP Workshop Annecy Update on Beam Failure Scenarios Jan Uythoven Thanks to: T.Baer, R.Schmidt, J.Wenninger, D.Wollmann, M.Zerlauth, other MPP.
LHC progress Thursday 30 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Mystery unable to inject: timing, BIS, SIS… 8:15 to 12: 30 Injection/LBDS studies  Fine delay adjustment of injection kickers  Synchronization of MKI.
MEF - Machines & Experimental Facilities Technical Stop #4 29 th August - 2 nd September 2011 Summary Julie Coupard Schedule and Coordination LHC-TS4 -
1 MKBH Erratic Jan Uythoven On behalf of the ABT team (Viliam, Nicolas M., Etienne, Laurent, Francesco etc…..) MPP meeting 8/5/2015.
Failure mode impact studies and LV system commissioning tests
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
LBDS Kicker Electronic and Slow Control Etienne CARLIER AB/BT/EC.
LHC Beam Dump System Technical Audit Trigger Synchronisation Unit.
LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Sat 18/6 – Sun 19/6 07:48 Beam dump due to spurious interlock from BIS 08:30 access BIC repair. RF intervention in parallel. 13:00 Intervention on BIC.
Distribution of machine parameters over GMT in the PS, SPS and future machines J. Serrano, AB-CO-HT TC 6 December 2006.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
LHC Status Sat Morning 18-June Bernhard Holzer, Gianluigi Arduini et al Tentative Planning: Luminosity 1092 x 1092 Access: installing low pass filter at.
Premature Dumps in 2011 Acknowledgements: A.Macpherson, G.Papotti, M.Zerlauth M.Albert LHC Beam Operation Workshop December 2011.
“we believe the reason why the first bunch is more intense than the following 3 is that it's on that one that the SPS RF loops are locked” Philippe & Django.
SPS RESTARTING AFTER LS1 05/03/2015 Stéphane Cettour Cavé.
R.Giachino / M.Albert Be/op 12 th March 2012 LHC Machine check out 1v1.
1 Beam Plans for Accelerator Systems: The Machine Protection System Jan Uythoven On behalf of the MPWG and the MPS Commissioning WG Special thanks to R.Schmidt,
1 Interlock logic for LHC injection: intensity limitations Jörg Wenninger AB-OP-SPS Outcome of the join Machine-Experiments Workshop on Machine Protection.
Friday March 4 th LHC morning report the short story: from a global point of view we had basically only one access !!!
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
LHC Status Mo Morning 20-June Bernhard Holzer, Gianluigi Arduini et al 7 runs The Week.
1 Beam Dumping System MPP review 12/06/2015 Jan Uythoven for the ABT team.
The LBDS trigger and re-trigger schemes Technical Review on UPS power distribution of the LHC Beam Dumping System (LBDS) A. Antoine.
Improvements of the ALFA and TOTEM Roman Pot Movement System in TS1 Mario Deile with input from P. Fassnacht, S. Jakobsen, J. Kaspar, S. Ravat for the.
LMC 27 November 2013 Status of LBDS LS1 activities and plans for 2014 reliability run Jan Uythoven for the many, many people working on the mentioned equipment.
LHC Beam Dumping System Experience from reliability run and Re-commissioning procedures MPP Nicolas Magnin – TE/ABT/EC.
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Dry runs and cold checkout Markus Albert, Reyes Alemany, Rossano Giachino, Delphine Jacquet, Verena Kain, Belen Salvachua Ferrando, Matteo Solfaroli Camillocci.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
Stéphane Gabourin on behalf of TE/MPE-EP MPP Linac4 – 9 th July 2015 BIS installation in Linac4 For 50 MeV operation.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
LHC ACCESS SYSTEM 1 EDMS: January 2008 Global Tests of the LHC Access system Outcome P. Ninin, T. Petterson, S Grau, T. Ladzinski 18 th January.
LHC progress Sunday 3rd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
1 Commissioning and Operation of the machine protection system L. Ponce Acknowledgements: M. Zerlauth, J. Wenninger, D. Wollmann, V. Chetvertkova, G. Valentino,
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
Commissioning / Reliability Runs / Dry runs 1 Jan Uythoven, LIBD meeting on LBDS Reliability Run 04/02/2014 Nov – Dec 2013 Commissioning individual MKDs.
LHC Status Sat Morning 9-June Bernhard Holzer, Joerg Wenninger Status Friday Morning: 09:00h end of fill “studies” rf coupler fine tuning ADT gain reduced.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
LBOCM. ZerlauthMarch 06 th 2012 Acknowledgements : B.Todd, C.Martin, I.Romera, E.Carlier, J.Wenninger, C.Zamantzas, S.Redaelli et al. 1v0 MPS Commissioning.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
LHC Beam Operation WorkshopM. ZerlauthDecember 2011 Thanks to : rMPP and MPP members, K.Fuchsberger, M.Galetzka, B.Goddard, R.Schmidt J.Wenninger, et al.
PC Current Interlocking for the SPS Fast Extractions. 1 J. Wenninger July 2009.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
E. Hatziangeli – LHC Beam Commissioning meeting - 3 rd March 2009.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
LHC Beam Commissioning Meeting V. Kain & R. Alemany
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Dependability Requirements of the LBDS and their Design Implications
ATLAS-AFP interlock validation
Monday 14th March Second fill with pilot + 3 nominal bunches
Operational Issues L. Ponce.
Saturday 30th June - Sunday: Rocky !
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
M. Zerlauth, I. Romera 0v1.
Friday morning 10:30 Optics measurements and corrections.
Sunday/Monday & :30 Stable beams. Fill #1851.
Beam Interlocks for Detectors and Movable Devices
SPS Injection BIS - Draft requirements
Presentation transcript:

Emergency dump update 2

M. Solfaroli – 23/10/2015 Goal 2 GENERAL STRATEGY Force open the BIS loop Generate an internal fault in the LBDS Scrape the beam away Information flow LHC Machine coordinator OP LHC section leader OP group leader LHC MPP chairman Nota Bene: Details for all “non-physical”, SW based actions are not contained in the EDMS procedure, but only in the version stored on TN: Accessible also from the OP sequence A paper copy must be available in CCC

M. Solfaroli – 23/10/2015 Actions 3 N.ACTIONOPTION #1Timing event #2OP switches #3Different BIC user input AC-dipole activation ADJUST mode set (in case present mode = SB) SIS trigger by stopping BLM subscription #4BIS controller power cycle #5Switch off MKB generator #6Disable RF freq on LBDS #7 LBDS VME crate power cycle sync async BD!! #8Scrape the beams away ADT blow-up Third resonance tune move CLIENTS LBDS Action on beam

M. Solfaroli – 23/10/2015 Actions on LBDS 3 VME crate containing: BLMDD TSU RF freq receiver N.ACTION #5Switch off MKB generator #6Disable RF freq on LBDS #7LBDS crate power cycle #8 TSU reboot N.ACTION #5Switch off MKB generator #6Disable RF freq on LBDS #7 LBDS VME crate power cycle Async dump Crate containing: BLMDD RF freq receiver TSU-BTSU-A Before LS1 After LS1

M. Solfaroli – 23/10/2015 Tests 5 Test nameDateResult OP switches #1 Sep 22 #2 Sep 22 #3 Sep 22 #4 Sep 22 OK AC dipole B1 - Sep 22 B2 - Sep 22 OK SIS – BLM Sep 22 OK SIS – BPMS Removed. Conditions changed (same effect as previous one) BIC crate power cycle (via SW) Sep 22 OK BIC crate power cycle (via HW) Sep 22 OK Access system Shall we add it (large impact test)? MKB generator in not ready state Stop F_rev received by LBDS Power cycle the LBDS crate Power cycle of the TSU Beam scraping with ADT Not tested, parameter to be defined if decided to keep the method in Beam scraping V tune resonance COLL closing

M. Solfaroli – 23/10/2015 Section 5 – future improvements 7 For additional diagnostics in case of major failures in the LHC control system (e.g. power cuts in the CCC...) a fully passive ‘beam presence’ display in the CCC could be envisaged…