The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.

Slides:



Advertisements
Similar presentations
Operating Nitrox Systems 11 Presented by Nuvair. Operating Nitrox Systems2 Membrane systems produce nitrox efficiently Compressed air flows through the.
Advertisements

Winter shutdown 08/09 Summary of HV interventions Barrel Muon Workshop, 02/09 Jesús Puerta-Pelayo, CIEMAT 17-February-2009.
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
Focus Coil Update Roy Preece / Tom Bradshaw / Mike Courthold STFC – RAL VC 17 th Jan 2013.
2.3.9 Student Book © 2004 Propane Education & Research CouncilPage Identifying Procedures for Purging Containers & Injecting Methanol Prior to.
Next Home EcoCompact troubleshooting guide Start the slide show then click Next.
NOvA Near Water and Dryer System Design and Status
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
Status of COUPP Experiment in the MINOS tunnel Erik Ramberg AEM 4 February, 2008.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 12, 2010.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 20, 2011.
Hydronic Mechanical Controls
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Malte HildebrandtMEG Review Meeting, 14th February 2007 Report of Run Coordinator Run 2006 Summary Malte Hildebrandt MEG Review Meeting, 14th February.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jun 4, 2012.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
THEMIS TIMPURGE- 1 UCB, JUNE 16, 2005 THEMIS INSTRUMENT NITROGEN PURGE.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
1 HBD Update Setback via Gas Accident T.K. Hemmick for the HBD Crew.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
Gas Coordination Panel 24/08/2004 Flammable Gas Installation Requirements, Interlocks, etc. F.H.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 17, 2013.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
The Design and Performance of the MINER A Detector Howard Budd, University of Rochester Technology and Instrumentation in Particle Physics 2011.
Muon System Safety Issues Burkhard Schmidt.
Active gas system status. S.Konovalov, K.Zhukov. Active gas system operation. S.Konovalov "Active gas system..."TRT Overview  Good design.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep 26, 2011.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar
PDT’s  Control Board DSP Software (Sten,HH) u Updated so as to include the wire-length in the module data  Readout u All 6 crates in global run. u 90/94.
Test beam setup: status report 31/03/2009 M. Alfonsi (CERN)
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 17, 2011.
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
Status of NA62 straw electronics Webs Covers Services Readout.
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
All Exp Mtg July 7, 2008 NuMI-MINOS Status Report – Laura Loiacono FAR DETECTOR: FD live time was 95.7% for cosmics last week (ROP7 problems reported at.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
Booster Pump/ Compressor Procedures Rescue 31 Operator Instructions.
March 18, 2008 TJRMICE Beamline Status1 MICE Beamline Status (March 18, 2008) Tom Roberts Muons, Inc. Illinois Institute of Technology.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 24, 2013.
MINER A Operations Report All Experimenters’ Meeting Steve Hahn, FNAL July 1, 2013.
New Product Developments World Leaders in Combustion Management Solutions C.E.M.S., MCERTs & E.P.A. Exhaust Gas Analysers C.E.M.S., MCERTs.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
SNuMI 1 Outline Action Items PP2 Progress [Nancy/Elaine] –Org Chart Update –FY07 Budget/Plans Discussion –FY08 Summer Shutdown –Overall cost Reduction.
Update on the HBD Craig Woody BNL DC Meeting May 11, 2005.
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
26/03/2014L-Ph. DE MENEZES & F. MERLET CERN/PH-DT-DI New recuperation system for n-Pentane:  Installation of the module in parallel of the first.
Lab Activities: Chamber Baking & Mixing Station Flushing Claudio Curtis Dan PPS meeting 22 June, 2011.
 94 LVPS Packages mounted 4’-25’ from the front-end electronics.  4 modules per package. u +5V& -5V “Digital”, +5V & -5V “Analog” 18 A 1A 18A 18Amps.
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Jan 25, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Mar 30, 2015.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Minerva Test Beam 2 Status Geoff Savage for the Test Beam 2 Team March 23, /23/2015AEM - Minerva Test Beam 2 Status1.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 8, 2016.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Dec 9, 2013.
مفاهیم بهره وري.
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014

Data MINERvA Live time Feb –  Given a MINERvA gate was there a MINOS gate so it is the total MINERvA MINOS live time Feb 6 FEB replacement Feb 9 not all MINOS files ready Couldn’t get efficiencies for Feb We create the POT data from the lumberjack plotter. For those days the plotter would not send any data. We have contacted AD about this problem. –We ran fine for these days 2

Putting the Roof Back On During the filling of the He target, 1 of the 3 panels above the detector was removed. –Uncovered were parts of the He Target and the veto counters. –During the shutdown the detector was covered with all 3 panels. While taking off the roof, connecting the spreader bar to the hooks on the middle roof panel was difficult. During the reinstallation of the roof, the spreader bar was attached to the hooks in a slightly different way. The techs were able to make connection to the panel quickly. We elected not to change the hooks for the middle panel –Thank John Voirin’s group for this 3

Rock Muons/POT Rock muons are generated in the berm, not the detector. Staring the plot at Jan POT/PulseRock Muons/POT

Status of Muon Monitor 4 A review of the MM4 gas rack took place on Feb 14. It passed the review with one finding. –A question arose regarding the system’s relief valve. The location of this relief valve was not defined A relief valve was put on the output of the panel i.e. input to the chamber to protect the chamber. The gas panel and the chamber were pressurized with nitrogen to a couple of PSI. In this test all components of the panel worked as expected. 5 Muon Monitor 4 Gas Rack Alcove pressure transducer readback Flow control valve Output pressure transducer readback Output valve Flow meter Input valve Input pressure Purge valve

MM4 The connection to the hadron monitor and MM1,2, & 3 He line was made. –The flow meter was reading negative flow –Pressure transducer in alcove went from 760 Torr to 50 Torr –The decision was made to remove MM4 from He line With Bob Barger of PPD the next day –The flow meter problem was due to a connector into the readout which was not properly secured. –The connector in the pressure transducer to the readback in the alcove was reconnected and that fixed the problem. This connector was difficult to seat correctly. Connector was shaken to be sure the problem was fixed. –Misunderstanding of the flow control valve. Belief was that it was a shutoff valve. –We needed to install a relief valve between the flow valve and the output valves. This protects the output pressure transducer. 6

MM4, the Plan The relief valve set for 12.5 PSI in the gas rack between flow valve and output valve has been installed. Pressure test the system with He – The gas rack to 65 PSI – The chamber to 2-4 PSI. Update documentation to be sent to safety committee With approval of safety committee, we will start flowing He from a single gas He bottle to MM4 through the entire system. There will be no connection to the gas line to the other monitors. Purge the nitrogen with He. Put MM4 on HV and check out MM4. Seal off the gas rack and chamber. At this point we are ready to connect MM4’s gas line to main gas supply. 7

Event Display 8 Nuclear Target Event Outer Calorimeter X ViewU View V View

NuMI Beam Plots 9

Protons for the Week 10 xx 0.26×10 19 POT Feb

FY2014 Protons 11 xx 11.98×10 19 POT Oct Feb

Protons for ME Run ×10 19 POT Sep at 15:00 – Feb xx