Dublin Waste to Energy Project (WTE) Traffic and Transport Information Session 2 GERALDINE KEARY, Chartered Engineer, Associate of RPS Consulting Engineers.

Slides:



Advertisements
Similar presentations
Moving Cellular Materials
Advertisements

Engineering in business and the environment Lesson 4: Environmental effects of engineering activities.
SOUTHERN FRINGE DEVELOPMENTS –CONSTRUCTION MANAGEMENT STRATEGY JUNE 2011 Outline /Full Planning Permissions –provisions 1. Strategic Construction Environmental.
NICHOLS SCHOOL TRAFFIC OPERATIONS STUDY. Existing Operations Examined Data Collection  On-site Count Collection of Representative Traffic Conditions.
GREATER NEW YORK A GREENER White Papers on Congestion Mitigation Strategies New York City Traffic Congestion Mitigation Commission November 20, 2007.
I-394 Express Lane Community Task Force March 18, 2004.
Time 1 day = 24 hours 1 hour = 60 minutes 1 minute = 60 seconds 1 year
A Resident’s View David Kaner West End Partnership Board Covent Garden Community Association.
TNS mrbi /JNLR January - December 2005/February 2006 Graphic Presentation January – December 2005.
A Comparative Study of the Economic Suitability and Viability of New Generation Intelligent Transport Systems (ITS) in Dublin Port Kay McGinley BA(Hons)
24 Hour Clock Activities.
Humber Bridge Review Results from the HUMBER ESTUARY TRANSPORT MODEL.
A Very Big Experiment Congestion Charging in London Peter Jones Transport Studies Group University of Westminster.
CIVIL ENGINEERING.
The London Congestion Charge. Facts Traffic speed in central London had fallen more that 20% since the 1960s (14.2 mph to 10mph) I n 1998 drivers in inner.
Research | consulting | technology safety and efficiency in transport through knowledge Moving people and freight in the urban.
Using Traffic Models as a Tool When Creating Noise Maps - Methods used in the EU project QCity Pia Sundbergh Div. for Transport and Localisation Analysis.
Pg. 1 Energy Intelligence Program Monitor your industrial facility and save energy! Tool that provides real-time feedback to help you manage energy in.
TERRAMIN AUSTRALIA Limited Angas Zinc Project. The Angas Zinc Project: noise Noise issue is a “work in progress” –Final noise outcomes and decisions awaiting.
Network Models Tran Van Hoai Faculty of Computer Science & Engineering HCMC University of Technology Tran Van Hoai.
The Cell and its Environment: The processes behind the movement of substances in and out of cells.
PierPASS & Operations as a Solution to Freight Congestion FHWA Talking Freight Seminar June 21, 2006 Bruce Wargo President & CEO, PierPASS Inc.
Central London Congestion Charging David Hutchinson GREATER LONDON AUTHORITY International Union of Air Pollution Prevention and Environmental Protection.
Olympic Transportation Planning For London 2012 A Peak Flow And Modal Share Analysis For Rail Usage At The Stratford Regional Station.
Tshwane Line 1 Traffic Simulation Results October 2012.
Tackling Transport in Africa The TEST Network M. M. Jackson & Mrs. R. Mapinduzi Ardhi University (ARU) Tanzania
Development of A Traffic Monitoring Program Using Emme 3 Based on A San Joaquin COG Travel Demand Model Jia Hao Wu, Ph.D., Joy Bhattacharya, P.E. and Chris.
Part 2 Processes and approaches associated with the FHWA method 1 1 HPMS Vehicle Summary Data.
Environmental Impacts Socio-Economic Environment Land Use Transportation System Design & Construction of Facilities Operations & Maintenance Activities.
Challenges in Using Paramics in a Secondary Plan Study – Case Study of Downsview, Toronto Paramics Users Group Meeting October 5, 2009.
Transfer Station Design
Congestion Charging and Air Quality in central London 12 November 2004 Charles Buckingham Monitoring Manager, Congestion Charging Division, Transport for.
Department of the Environment Near Road NO2 Monitoring Update MWAQC Technical Advisory Committee January 10, 2012.
Research Priorities for the Transportation and Traffic Safety Center in Kuwait Dr. Fahad AL-Rukaibi Director Transportation & Traffic Safety Center Faculty.
Rookery South Resource Recovery Facility (RRF) Community Liaison Panel Transport Presentation – 14 th December 2009 John Hopkins, Peter Brett Associates.
Evaluation of Automated Camera Enforcement on Red Light Running Violations by Time into the Red Phase Nicole Oneyear and Shauna Hallmark.
McKellar Park Information Session
Chapter 8-1: Cellular Transport. Osmosis Water wants to be equal on both sides of the cell.
EMERGENCY MANAGEMENT WARRANDYTE COMMUNITY FORUM, 12 NOV 2015 TRAFFIC MODELLING.
Presented by: Stephen Crane City Administrator Downtown Lancaster Parking Study Completed by the International Transportation Engineering (ITE) UW-Platteville.
PG Funding and Management Strategies Paris Some thoughts on Road Pricing.
Monrovia Planning Commission Agenda Item PH-1 October 14, 2015 Conditional Use Permit CUP East Colorado Boulevard Applicant, Julie Kalicki.
Waikato Regional Transportation Model A Strategic Tool for Land Use and Transport Investigations SPN Meeting, November 2015.
TNS mrbi /JNLR July 2004-June 2005/September 2005 Graphic Presentation July 2004 – June 2005.
CFOA Road Safety Group Protection Workstream Kevin Pearson Frank Duffield Louis Jones.
University of Oxford Environmental Sustainability Team Environmental Sustainability at the University of Oxford Twitter and £
Delivery and Servicing Plans Central London FQP 16 th February 2011 Ian Wainwright – Freight Policy Officer Better Routes and Places Transport for London.
Santiago Hills II East Orange General Plan Noise Assessment Matthew B. Jones, P.E. Mestre Greve Associates.
1 Austrian State of Environment report Process and experience Source: ??????
The Challenge of Urban Rail Infrastructure The Design of William Street Underground Station Barry Moore 23 rd November 2005 AusRAIL PLUS 2005.
Rye House Energy Recovery Facility
AECOM Transport CLG Richard Corbin September 2016.
Brendan Curtin, Transport Statistician, CSO
Normal Hills Route Departure Times from Normal Hills
Traffic Engineering Division Nestor A. Flores, P.E., PTOE
Summary of Traffic Conditions I210-E
Thornbury Road new green-man cycle and pedestrian crossing
Fishermans Bend Draft Framework Transport Recommendations
Quantification of the Natural Variation in Traffic Flow
Team 1 Design Team 4 Inc Team 3 LLC Team 7 Global Team 11 Design
Rush-hour truck ban.
Cell Energy Show how the mitochondria, chloroplasts and vacuole work
Impact of Land use on Air pollution in Austin
7:30 am 20% River City High School
Improving Transportation Inventories Summary of February 14th Webinar
What do we really care about?
1. Where should buses run and with what frequency?
Cost of Electricity & Energy Usage Energy Use Recall: Measured in Watts (W) Electrical power is the rate at which electrical energy is produced.
FREEWAY MANAGEMENT SYSTEMS:
Presentation transcript:

Dublin Waste to Energy Project (WTE) Traffic and Transport Information Session 2 GERALDINE KEARY, Chartered Engineer, Associate of RPS Consulting Engineers 25/02/'06

If Plant accepts 600,000 tonnes per annum If all deliveries go directly to the Plant If no mitigation measures undertaken Equals 230 deliveries a day “WORST CASE” TRAFFIC SCENARIO

How do we mitigate? – Bulk Transport – Deliveries outside peak times – 5 / 5.5 working days per week – Enforcement. MITIGATION MEASURES

Payloads – Refuse Collection Vehicle10 tonnes – Bulk Transport Vehicle 20 tonnes Bulk Transport

Bulk Transport (Cont.)

Plant Acceptance Times – Day time: 10am – 4pm6 hours – Night time: 7pm – 10:30pm3.5 hours Existing Collection Times – Day time: 8am - 2:30pm 6.5 hours – Night time: 7pm – 12 Midnight 5 hours Deliveries Outside Peak Times

5 Working days – Day and night time deliveries Total 144 deliveries per day Number of Working Days

Number of Working Days (Cont.) Day Time Deliveries 10am – 4pm Night Time Deliveries (Dublin Port Tunnel / East Wall Road) 7pm – 10:30pm

5.5 Working days – Day and night time deliveries Total 132 deliveries per day Number of Working Days

Number of Working Days (Cont.) Day Time Deliveries 10am – 4pm Night Time Deliveries (Dublin Port Tunnel / East Wall Road) 7pm – 10:30pm

How do we enforce movements? – Opening times of the Plant – Release of waste from the Transfer Stations – GPS monitoring – Licence control – Penalties for breaches. Enforcement

What does this mean for Local Traffic? – 40 Refuse Vehicles during the daytime on Local Road Network – Bulk transfer vehicles will use the Port Tunnel / East Wall Road – % Increase Sean Moore Road0.36% Increase in AADT East Link Road1.18% Increase in AADT IMPACT ON LOCAL TRAFFIC

Impact on Local Traffic (Cont.)

Dublin Waste to Energy Project (WTE) Traffic and Transport Information Session 2 GERALDINE KEARY, Chartered Engineer, Associate of RPS Consulting Engineers 25/02/'06