Fiber Cable/Spectrograph Interface: The Slit-Plate Slit-Plate models are coming together. Who will fab and assemble the parts, and how, will be integral.

Slides:



Advertisements
Similar presentations
Manufacturing Processes lab I Running a lathe machine
Advertisements

Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
MICE Radiation Shield Design review for the proposed ‘Direct Drive’ MICE Spectrometer Radiation Shield 17/11/2011Norbert Collomb.
HFT PXL Mechanical WBS 1.2 March 2010 Howard Wieman LBNL 1.
M. Gilchriese SQP Clearance June 8, M. Gilchriese 2 Overview A1-2 inners have been mounted on backbone An A1-2 outer has been mounted on the backbone.
HCAL RBX PRR Overview Jim Freeman RBX PRR March 1-2, 2001.
MERIT Hg System Final Design Review Hg Target System Design Interfaces V.B. Graves P.T. Spampinato T.A. Gabriel MERIT Collaboration Meeting MIT Plasma.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
1 Configuration Development for HIF Final Focus Superconducting Quadrupole Array HIF Final Focus Meeting July 2, 2002 Tom Brown Chang Jun Phil Heitzenroeder.
MICE modules interface proposal FAC module Phone meeting Edgar Black IIT 2/13/2004.
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Diffuser Mounting Design Stephanie Yang.
111/3/2004 GLAST LAT ProjectLAT Engineering Meeting LAT Face to Face Manager’ Meeting Nov. 3, 2004 LAT Level Design Status LAT Face to Face Manager’ Meeting.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
Mechanical Work Plan Discussion Bill Cooper Fermilab.
Single PET-module Design Update 1 TRIMAGE Meeting Munich, Dec. 12,2014 WP 3 Design and optimization of PET-system Andreas Seebacher, raytest.
9/13/2015Robin Lafever BigBoss1. Fiber and Ferrule 9/13/2015Robin Lafever BigBoss2 Typical fiber and Ferrule: My current model is out of date. Jerry Edelstein.
H. Felice - P. Ferracin – D. Cheng 09/19/2013 Update on structure CAD model.
H. Felice - P. Ferracin – D. Cheng 09/11/2013 Update on structure CAD model.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Coming soon! hd-sct.com Coming soon Full specifications & application data for SCT HD camera support.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 5.1 Grid Box Design 1 GLAST Large Area Telescope:
Door seal test set-up concepts 10/10/2015Robin Lafever LBNL1 Generic Door seal concepts for personnel access and feed-through applications in the CUORE.
Design Progress Allen Ellis 18-September
Notes from Apr 21 Whiteboard session 1 Robin Lafever Thursday afternoon, 21 Apr We convened around a Whiteboard to try to integrate the spectrum of ideas.
Module Flex status. 4 types: M4, M2, M1plane, M1mountain. constraint: components and bonding on the same side → folded wing geometry of the flex module.
Helene Felice, Dan Cheng Support structure modifications Update on discussion at CERN.
M. Gilchriese Module Assembly and Attachment at LBNL M. Gilchriese for F. Goozen April 2000.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
Nov. 8, 2001M. Garcia-Sciveres -- PP0 & Service Panels1 PP0 & Service Panels 1.Introduction 2.Technical Status 3.Goals for 2002.
EPT 221 CONFIGURATION DESIGN. Objective of This Lecture Describe the configuration design phase Describe ways to generate product and parts configurations.
11/30/20151Robin Lafever The existing 300 K Flange This is certainly an older version but is useful to illustrate The proposed modifications.
Robin Lafever For Russell wilcox Fiber Synch System Basic Box Fit-up 25mm and 50mm deep boxes installed in 17” chassis 12/1/20151Robin Lafever LBNL.
CERN adb Chamber Support Structure Installation MUON SYSTEM INTEGRATION MEETING - Status of Production of support panels - Things to be settled.
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
As-built 09 April 2008 Cuore concrete support structure with jack screws in place Cuore site with elevator deck ready for installation 1 Robin Lafever.
1 03/21/2006 GLAST CU Beam Test Workshop Scanning Table.
1 LAPPD Team meeting 6/10/2010 Ossy Siegmund, Experimental Astrophysics Group, Space Sciences Laboratory, U. California at Berkeley Integration of Front-End.
A 128 fiber Slit-Plate assembly, Kinematic mount
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
Design of a Precision Robot Wrist Interface
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
109-IDPU-Chassis-Donakowski 1 30 Sep – 01 Oct 2009DRAFT RBSP EFW ICDR 109-IDPU-Chassis-Donakowski IDPU Chassis Mechanical Design and Development Bill Donakowski.
Overall Layout 1 IP2 64 m LEReC-I (1.6-2MeV): Gun to dump SRF gun used as a booster cavity Booster Cavity and Gun move (next slide)
D. Peterson, for discussion of LC-TPC LP, interface of Endplate and Field cage, Discussion of the LP endplate and field cage geometry A version.
Gigabit Ethernet: An Affordable Solution Preliminary Design G4 Gaurav Asthana James Denaro.
Practical aspects of small aperture quadrupoles Dr Ben Leigh Tesla Engineering Ltd.
Status of Prototype Preparation (I) Wander Baldini On behalf of the Ferrara SuperB group SuperB Workshop, LNF Dic. 2-nd 2009.
QXF Reaction / Impregnation Fixtures J. Schmalzle 4/9/13.
Baby MIND Scintillator modules 11 November 2015 Revision E. Noah.
Dan Cheng 8/27/2015 MQXFS1 Observations and Feedback from the Assembly Processes, Part II.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Integral Field Spectrograph Opto-mechanical concepts PIERRE KARST, JEAN-LUC GIMENEZ CPPM(CNRS),FRANCE.
EC: 7 DISK concept Preliminary considerations
ATLAS pixel module assembly flow
Baby-MIND Modules & Services
nSW Alignment Installation
IR Detector - Test cryostat For IPNL - Shrinkage measurement at 120 K
HB RM prototypes Ianos Schmidt Aug 17, 2017.
Design of the He and HB ODU
Preliminary PXL support models with assembly fixtures
Presentation transcript:

Fiber Cable/Spectrograph Interface: The Slit-Plate Slit-Plate models are coming together. Who will fab and assemble the parts, and how, will be integral to further design. Models and drawing are being worked up to address these issues. Mounting and handling details will be critical in managing the tolerance budget. Mount details are also influenced by fab and assembly requirements; i.e. the alignment features must survive machining and assembly processes. Tolerance and alignment questions arise: Tolerance budget Glue allowance Fiber/Slot allowance Fab and assembly allowances Spectrograph aperture Spectrograph interfaces 1 Robin Lafever SSL/LBL

Slit-Plate Module 128 Fibers 4 x 32 fiber Connectors 2 Robin Lafever SSL/LBL Cover Plate Fiber Array (128 fibers) Cable Clamp Lenslet Slit-Plate Body Fiber array Pigtail Each array contains 32 fibers 32 fiber Connector Furcation tube, 4.5 mm dia.

Slit-Plate Module 128 Fibers 4 x 32 fiber Connectors 3 Robin Lafever SSL/LBL Generic 128 fiber Module (no mounting features) Simplified fab and assembly: 1.Lenslet Cover, Body, and Pigtail are fabbed separately. 2. Fibers are glued into slots, sandwiched between Cover and Body And staked at this surface. Pigtails are clamped. 3. Surfaces are ground and polished 4. Lenslet bonded on.

4 Robin Lafever SSL/LBL

4 Modules, 512 Fibers, at the Spectrograph 5 Robin Lafever SSL/LBL Approximate alignment using 4 x 128 fiber Modules

4 Modules, 512 Fibers, at the Spectrograph 6 Robin Lafever SSL/LBL In the current Spectrograph design, these 2 surfaces are available for mounting and alignment features

4 Modules, 512 Fibers, at the Spectrograph 7 Robin Lafever SSL/LBL A crude envelope, carrying the slit-plates, mated to the Spectrograph aperture

Adapter envelope 8 Robin Lafever SSL/LBL A crude envelope, carrying the slit-plates, mated to the Spectrograph aperture No space in here for the “Lossy Fiber” assembly !

Adapter envelope 9 Robin Lafever SSL/LBL At present, these 2 faces are available for alignment features Surface defines the Aperture slot ( This image was worked up to illustrate a misfit between the Spectrograph model and the Slit-Plate model, based on place- holder dimensions. This has since been resolved. New models are in the works. ) Conspicuously missing, is the “Lossy Fiber Assembly”. No room. Needs rethinking.

128 fiber Module x 4, 512 fibers 10 Robin Lafever SSL/LBL 512 fiber Slit-Plate Assembly With base-plate.

128 fiber Module x 4, 512 fibers 11 Robin Lafever SSL/LBL 512 fiber Slit-Plate Assembly With base-plate. This is not kinematic. Pins set the azimuthal alignment, Ground pads set the in-plane alignment. Ground stops set the radial alignment.

100 fiber module x 5, 500 fibers 12 Robin Lafever SSL/LBL 500 fiber Slit-Plate Assembly

100 fiber module x 5, 500 fibers 13 Robin Lafever SSL/LBL Similar Pin-Pad treatment.

Next It’s time to start considering the Spectrograph integration scheme and moving toward an Interface Document. At present, confirmation of a few critical dimensions will be adequate but more details will be needed soon. New models are underway to match the current Spectrograph geometry. Drawings will follow soon, to be sent to fab candidates to get real feed-back. Now, however, I am soliciting input on mounting and alignment schemes. Candidate methods, at the moment, include: Bolts, or Bonding, or Magnets. Rework to the new numbers may open up some space at the Spectrograph aperture to accommodate the “Lossy Fiber Assembly”. Maybe not. It needs some more thinking. 14 Robin Lafever SSL/LBL