ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer.

Slides:



Advertisements
Similar presentations
Laboratori Nazionali di Legnaro (Italy) DTL design status A. Pisent.
Advertisements

Components of HVAC System
University of Iowa Indoor Practice Facility Outside-the-box HVAC Lincoln Pearce, PE – KJWW Engineering David Hahn – University of Iowa Chilled Water Plant.
Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Thomas Jefferson National Accelerator Facility Page 1.
ESS Cooling and Heat Recovery system Thomas Hjern
ESS Cryogenic System Design
High Temperature Cooling of Cryoplants and RF Systems at the European Spallation Source 2 nd Workshop Energy for Sustainable Science at Research Infrastructures.
ESS Cryogenic System Process Design Philipp Arnold Section Leader Cryogenics CEC – ICMC 2015 June 29, 2015.
ESS | Power System | | Frithiof Jensen ESS Power System Ion Source, Front-end.
The ESS vacuum team has overall responsibility for all technical vacuum systems used on the: Accelerator, Target and Neutron Scattering Instruments and.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
Introduction Topic: The Basic Ground Source Heat Pump Name: Matthew Stoangi Objective: To provide a clear understanding of the mechanics involved in the.
ESS Cryogenic Distribution System for the Elliptical Linac MBL/HBL - CDS requirements Preliminary Design Review Meeting, 20 May 2015, ESS, Lund, Sweden.
Cryogenik waste heat utilization for DESY and European XFEL 2nd Workshop on Energy for Sustainable Science at Research Infrastructurs Jens-Peter Jensen,
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
The ESS Cryogenics System J. G. Weisend II, P. Arnold, J Fydrych, W. Hees, J. Jurns, A. Lundmark, X. T. Su, X.L. Wang June 2015.
Anders Sunesson RF Group ESS Accelerator Division
January 4, 2007 Project Overview RHIC II Project Internal Cost Review Roberto Than Cryogenics Systems January 4, 2007.
HWDB: Operations at the Spallation Neutron Source Workshop on Accelerator Operations August 6-10, 2012 Glen D. Johns Accelerator Operations Manager.
ESS RF System Design Stephen Molloy RF Group ESS Accelerator Division SLHiPP2 4-May-2012.
An Overview of Cryogenic Operations at ESS J. G. Weisend II, P. Arnold, E. Bargallo, C. Darve, N. Ellias, J Fydrych, W. Hees, J. Jurns, D. Piso, X.L. Wang.
An introduction to Energy aspects at CERN June 2014.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
ESS Linac Modifications for ESSnuSB Dave McGinnis Chief Engineer / Accelerator Division August 27, 2014.
The ESS Cryogenics System J. G. Weisend II, P. Arnold, J Fydrych, W. Hees, J. Jurns, A. Lundmark, X. T. Su, X.L. Wang February 2016.
DISTRICT HEATING District heating is an infrastructure which allows heat generated in a centralized location to be distributed to residential homes and.
J. G. Weisend II for the ESS Team Energy Efficiency & Recovery at ESS.
General overview of WU : Cryogenic Distribution for Elliptical Linac Jarosław Fydrych Cryodistribution Project Engineer Preliminary Design Review,
PIP-II Cryogenics Arkadiy Klebaner and Jay Theilacker PIP-II Collaboration Meeting 9 November 2015.
ESS Vacuum Systems TAC 6 November 2012 Peter Ladd Senior Vacuum Expert.
PXIE Cryogenics Concept Arkadiy Klebaner Session 5 / WG1 (CW Linac and PXIE) October 26 th, 2011.
1 ESS Warm End Linac Cooling Water 5-6 May 2014 John Jurns.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
Accelerator Tunnel Layout (G01) Nick Gazis Senior Mechanical Engineer Review of ESS Accelerator Conventional Facility Design.
Project X Workshop - Cryogenics1 Project X CRYOGENICS Arkadiy Klebaner.
Cooling Water and Heat Recovery system Thomas Hjern Harald Bäck Design Leader Process systems Conventional Facilities Accelerator Review November 3-4,
ESS Cooling System - Interface with DTL 1 John Jurns Cooling System Engineer.
Overview of the ESS Linac Cryogenic Distribution System
Accelerator Installation Plan: Graphical representation E. Sargsyan & L. Lari DRAFT - March March 2016.
Chapter Editor: John Weisend TDR Chapter 6 Cryogenic System, Vacuum System & Test Stands.
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
FCC Infrastructure & Operation Update on the cryogenics study Laurent Tavian CERN, TE-CRG 28 October 2015.
ESS Cryomodule Status Meeting – Introduction | | Christine Darve Introduction to Cryomodules for the ESS 2013 January, 9 th Christine Darve.
TDR Cryogenics Parameters Tom Peterson 28 September 2011.
ESS | Helium Distribution | | Torsten Koettig Linac – Helium distribution 1.
Update on the PSB Cooling and Ventilation Systems
Review of the International Linear Collider (ILC) Electrical and Mechanical System Design to be held at CERN on 21 March, 2012 The purpose of the Review.
RF cell Anders Sunesson RF group leader
Existing Prototype Test Facility (PTF) and planned Series Test Facility Schroeder, Claus Cryo-Review Darmstadt
Cryomodule test stand at ESS site
Process Simulation for the LCLS-II Cryogenic Systems
Innovative He cycle Francois Millet.
Overview and System Design for ESS LLRF Systems
BDS Cryogenic System RDR Status and EDR Plans
ESS RF Development at Uppsala University
ESS Target Cryogenic System European Cryogenic Days CERN
Optimum cryomodule length at the ESS
Mathew C. Wright January 26, 2009
ILC Experimental Hall Cryogenics An Overview
Maintenance at ALBA facility: Strategy for the conventional services
Operator Training Requirements
Managing Parameters Karin Rathsman
RF systems introduction
Operation of Target Safety System (TSS)
RF introduction Anders Sunesson RF group leader
Charge and Agenda of the 18th TAC meeting
Project Support Meeting January 9, 2019
Presentation transcript:

ESS Cooling System - Interface with RFQ 1 John Jurns Cooling System Engineer

What is the purpose of the cooling system? The cooling and heat recovery system of the ESS plant shall be designed to meet the following requirements: Provide reliable and efficient cooling of all parts of the ESS site that requires water cooling Transfer as much heat as possible from the cooling system to the city of Lund district heating system and/or other external waste heat recovery systems What systems are included in our scope of work? The scope of the cooling system design is primarily to manage the flow of heat in the technical infrastructure (i.e. – the machine). Cooling is accomplished primarily with water. Systems in scope include: Accelerator – klystron gallery and linac tunnel Target – interface at target internal cooling systems boundary Cryoplant – compressor and helium cooling Instruments – cooling as required for instruments and instrument support equipment Conventional Facility – interface with conventional HVAC

Cooling system parameters Majority of cooling provided by closed loop water-water heat exchanger and pump systems. Water temperature range approximately deg C Water system pressure nominally 10 bar Three primary cooling loops – low, medium & high temperature ranges. Total flow through each loop ~ 8000 liter/minute Primary cooling loops interface with: Substations located close to cooling loads Central utility building where cooling loops interface with external District Heating system Secondary cooling loops interface with individual cooling loads and substations Linac will have two cooling substations. One of these substations will manage heat from the RFQ

ESS cooling system overview

Cooling loads Cooling substation To Central utility building Typical cooling substation flow Cooling load

Lo beta Ion source Klystron gallery Tunnel Accelerator Cold end substation Accelerator cooling system piping cold end substation Hi beta HEBTCouplers, etc. J. Jurns 24 October 2012 To Central utility building

RFQ cavity Klystron gallery Tunnel Accelerator Warm end substation Accelerator cooling piping – warm end substation RFQ/DTL DTL cavity Warm end high accuracy temperature control Spokes To Central utility building

RFQ cooling ? RFQ Cooling Substation TBD Interface

RFQ cooling assumptions & questions 1500 kW input X 2.91μS X 14 Hz = 61 kW average power input. Assume that approximately 50% of this power is heat that must be cooled. Questions for RFQ cooling: RFQ cooling temperature deg C? Temperature control limits? That is - ± x,x deg C? Cooling medium – glycol? Water? RFQ cooling controls & interface requirements? Cooling system architecture Separate dedicated cooling subsystem for RFQ? Integrated cooling subsystem for RFQ & DTL? Separate fluid loop for RFQ cooling, or direct supply from cooling system? If direct, any specifications on water quality?