Industrial practice Industrial production methods There are four main types of industrial production methods: One-off production is when only one product.

Slides:



Advertisements
Similar presentations
Technology Interactions Chapter Title Copyright © Glencoe/McGraw-Hill A Division of The McGraw-Hill Companies, Inc. Technology Interactions Manufacturing.
Advertisements

Technology Interactions ‹ Chapter Title Copyright © Glencoe/McGraw-Hill A Division of The McGraw-Hill Companies, Inc. Technology Interactions Manufacturing.
METHODS OF PRODUCTION Business must decide on the most suitable method of production. The objective is to minimise the cost per unit, i.e. productive.
C3 – THE IMPACT OF CAD/CAM ON MANUFACTURING Option C: CAD/CAM.
Name:Candidate No: Unit 18: Engineering Marking Out Task: 1a i Grading Criteria: P1Key Skills: Assignment: 1 - Selecting appropriate methods of measuring.
 Which of the following is CAD and CAM ?  Computer aided desk  Computer and design  Computer aided design  Computer and drawing  Computer and manufacturing.
Components of an Automated Manufacturing System
Unit 2 - How Organisations Use ICT
5.1 Production Methods IBBM.
Industrial Manufacture
Manufacturing Input Ingredients Process Mixing, chopping, baking
Exploring One-Off Batch and Mass Production Techniques for KS3
Unit 5 Operations Management Production Methods. Learning Objectives To describe and compare the features and applications of job, batch, line, flow and.
Specification section 3.1
Lesson Objectives We are learning to: Understand how CAD/CAM and ICT systems are used in manufacturing We will be able to: Apply this theory in order to.
CAD CAM CADMAT A2 Graphics. CADMAT We will look at … We will look at … CADMAT CADMAT –Computer aided design, manufacture and Testing PDM PDM –Project.
Production.
Level 2 Unit 6 Application of Manufacturing Techniques in Engineering Engineering Diploma Level 2 Unit 6 Application of Manufacturing Techniques in Engineering.
MANUFACTURING VOCATS 7.O5. MANUFACTURING is A system or group of systems used in the manufacturing process to make products for an end user.
Batch/Mass Production! Design your product to be suitable for Mass/Batch production. When your designing a product for Batch/mass production -Choose a.
The way products are manufactured depends on the quantity required. For example, cars are continually manufactured in hundreds of thousands, a prototype.
Applications and advantages/ disadvantages of the following modern production methods for production/ assembly lines: Robots Computer Numerically Controlled.
4.1.2 The Main Methods of Production
Manufacturing in school Brian Russell. Exam expectations Issues associated with manufacturing using school facilities are regularly tested in the written.
Competency 7.00 Competency 7.00 Develop an Awareness of the Designed World CommunicationTransportationManufacturingStructural Energy and Power Biotechnology.
The Production Process What are the four stages of production? How are things mass produced?
GCSE Textiles Exam The Basics…
Lesson objective – to understand what is meant by one-off, batch and mass production Textiles – Production Processes.
Title: Production Processes
Commercial Production Methods: Job production; understand that this involves producing ‘one off’ products. Every item produced is different. It is labour.
Collect your work from the front table and your folder from the desk. Hole punch your work. On your initial ideas, circle, mark or label your favourite.
You will understand how mass production is used to produce large numbers of one product. You will understand how and why quality checks are carried out.
Year 10 Summer Exams Guide to revision! Focus - CAD/CAM.
CAD CAM. 2 and 3 Dimensional CAD: Using 2-dimensional CAD software, designers can create accurate, scaled drawings of parts and assemblies for designs.
Jigs and Fixtures to aid repetition. Jigs, Fixtures & Templates These are essential to gain consistency when making more than one product. If the exam.
Production Scale Theory. Knowledge and Understanding.
Product Analysis Product Analysis Theory. Knowledge and Understanding.
Textiles Year 9: Shorts Assessment: Design Brief, Specification, Planning and Making.
Product manufacture Scales of production Organising production Scales of production Organising production.
Industrial Machinery.  The machine opposite is a lock stitch machine.  It only does a basic straight stitch.  Different specialist machines do other.
Production Processes The following slides will describe the various types of production processes – there is an overview below One off production -one.
COMPUTER APPLICATIONS. CAD and CAM and ICT in Graphics.
Practice exam - Answer the following questions: Above there are four different designs of Razors, choose what you think is the most sustainable and give.
Identify job, batch and flow production - E Explain when job, batch and flow production are likely to be used - C Analyse the advantages and disadvantages.
Level 1 Diploma in Electrical Installation © 2014 City and Guilds of London Institute. All rights reserved. 1 of 7 PowerPoint presentation Supporting information.
Manufacturing systems Brian Russell. Exam expectations Issues associated with Manufacturing are regularly tested in the written paper. Questions often.
Level 1 Business Studies AS90837 Demonstrate an understanding of internal factors of a small business.
Product Design ~ Summer Task Real World Engineering A report on the production of a cordless drill.
GCSE Revision (Section B) - Manufacturing Methods.
Health and Safety The Legal Side Health and safety of the workforce
understanding of the terms;
Project Overview CNC Introduction Applying CNC Designing for CNC
GCSE Revision Manufacturing
Question four manufacturing question
- To be able to understand to different scale of production that products are made from - To be able to select an appropriate scale of production for a.
Structure of exam paper 1 hour 30 mins
Modern Production Methods
Level 1 Business Studies
Use of computers in the textile industry
Components of an Automated Manufacturing System
AQA GCSE 5 Scales of production Design and Technology 8552 Unit 4
AQA GCSE 4 Production techniques and systems
Computer Aided Design (CAD) Introduction to CAD
Operations Management
Support for writing the extended writing question
COMMERCIAL MANUFACTURING PRACTICES
Commercial Production Methods:
Yr 11 – Product Design Exam Technique.
Scales of Production.
Presentation transcript:

Industrial practice Industrial production methods There are four main types of industrial production methods: One-off production is when only one product is made at a time. Every product is different so it is labour intensive. Products may be made by hand or a combination of hand and machine methods. Batch production is when a small quantity of identical products are made. Batch production may also be labour intensive, but jigs and templates are used to aid production. Batches of the product can be made as often as required. The machines can be easily changed to produce a batch of a different product. Mass production is when hundreds of identical products are made, usually on a production line. Mass production often involves the assembly of a number of sub- assemblies of individual components. Parts may be bought from other companies. There is usually some automation of tasks (eg by using Computer Numerical Control machines) and this enables a smaller number of workers to output more products. Continuous flow production is when many thousands of identical products are made. The difference between this and mass production is that the production line is kept running 24 hours a day, seven days a week to maximise production and eliminate the extra costs of starting and stopping the production process. The process is highly automated and few workers are required.

Batch production is described like this…..

Visual example

CAD/CAM The production flow chart seen below is used to demonstrate the stages involved in manufacturing a product using batch production techniques. The example shows the stages of making the parts for the picnic table through CAD (computer aided design) and CAM (computer aided manufacture). Quality control is seen at two stages. This is when the product is checked for faults as it should be in perfect condition at each stage

Exam Question Q5a Now you need to choose a product that you know you could produce in the workshop. Think about how you would make it, what equipment do we have here that you would use? What batch equipment would you use? Q5a For this question I would draw the product and add in extra notes like: each part of the product / names of equipment used / features / how it would be assembled (brief) / sizes. Q5b - A concise and detailed response showing a good understanding of use of an assembly line in manufacturing complex products. 3 marks A sound response showing a basic understanding of use of an assembly line in manufacturing complex products. 2 marks A simplistic statement or only partially correct response. 1 mark

Exam Question (i) All main stages of assembly listed correct and in correct order. 3 marks Some main stages of assembly identified but information may be insufficiently, detailed and in wrong order. 2 marks Little or no main stages of assembly identified or information is vague and/or in wrong order. 1 mark (ii) Appropriate quality control measures identified and in the correct place. 2 marks Appropriate quality control measures identified but may not be in correct place. 1 mark Appropriate quality control measures may not have been identified or may be incorrect for the manufacturing process. 0 marks (iii) Correctly named tools and equipment for major stages of assembly and quantity of production. 2 marks At least one suitable item of tools or equipment identified. 1 mark (iv) Appropriate waste outputs and system for removal correctly identified. E.g. sprue removed from plastic components; off cuts of fabric and removal of excess threads from textiles products. 2 marks Appropriate waste output identified without removal system or vague waste/removal identified in brief. 1 mark

Exam Question Risks associated with using tools and equipment to assemble the product e.g. use of scissors, glue, clamps, general housekeeping rules such as trailing leads etc. Identified risk must be appropriate to product and assembly process described in 5(c). Appropriate H&S risk identified and described in sufficient detail. 2 marks Appropriate H&S risk identified but may not be sufficiently described. 1 mark Appropriate intervention or guideline identified to minimise risk e.g. stowing tools safely between uses, good ventilation when using toxic substances, safety goggles, keeping areas tidy, no trailing leads etc. Appropriate intervention described in sufficient detail. Intervention matches risk in (i). 2 marks Appropriate intervention identified but may not be sufficiently described. Intervention matches risk in (i). 1 mark