Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.

Slides:



Advertisements
Similar presentations
The Student Handbook to T HE A PPRAISAL OF R EAL E STATE 1 Chapter 10 Improvement Analysis.
Advertisements

Unit 2 Construction Process Part Illustrated Words and Concepts Figure 2-1 Schedule of Stages in Typical Single House Construction Figure 2-2 Approvals,
Roofs are one of a building’s primary elements and play a major part in giving a building its character. There are several different types of roof in.
Complete Custom Remodeling For all your remodeling needs All-Wood Cabinets Granite Countertops Laminate Countertops Cabinet Hardware Computer Designs.
An Overview of the Production Process. -Stable Workforce -Controlled Environment -Less Waste -Repetitive Tasks -Lean Manufacturing Principles -Just-in-time.
New Homes Construction Overview To Code 4 Long Meadow, Diss Mark Hart Divisional Construction Director.
INTD 59 bathroom design basics. five basic steps in bath design 1.gathering client & project information 2.setting priorities 3.researching and selecting.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Progress Report 12/13/11. Progress Schedule December 2011 Work Completed December: Installed Concrete topping on roof Rough In M&E East side screen wall.
Futureview Solar Solutions Elysburg, Pa. Call
Building Australia’s Future Energy Efficiency Introductory Awareness Training AUSTRALIAN Greenhouse Office Supported by: Step by Step Application of BCA.
Resolve Business Disputes and Select and Prepare a Construction Contract Lesson Eight Cert IV - M. S. Martin March 2012.
Prefabricated Timber Frame Construction
IET 120 CONSTRUCTION PROJECT Name: David Marcum. Dwelling  Number of Floors 2 Place image of your floor plan in this space.
NGfL CYMRU GCaD SITE CARPENTRY.
Residential Wall Systems. Building Walls Wood Framed Walls Precast Concrete Walls Steel Framed Walls Sustainable Walls.
BUILDING WITH THASTYRON
IET 120 CONSTRUCTION PROJECT Name: Clarence Hunt.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Summary of Energy Star Site Inspection July 11, 2007
How to build a two storey house
Building for Learning Project Photo Progress Report 6 February 2010– March 2010 Project commencement 21 st September 2009.
CONSTRUCTING HOMES & OTHER BLDGS. Preparing the Construction Site –Clearing the Site: the site must be cleared of anything that would get in the way of.
© OnCourse Learning. All Rights Reserved. Basic House Construction Learning Objectives  List the primary styles of residential architecture  Describe.
Architect Drawing of New Entrance. Location Location of Phase II Construction Project – Old tennis courts west of the existing building.
Click here for Game Rules & Instructions: Copyright © 2009, Steve Beutler, All rights.
Finishing the Building
Careers in Carpentry & Construction. Types of construction carpenters can enter Residential – 52% of the industry 1 and 2 family structures Commercial.
Wall Framing Grimsby Secondary School Technology Dept.
By: Nick Richardson. The job requires the worker to have good math skills, and the ability to work with several different heavy machines along with all.
WHAT I WANT TO BE WHEN IM OLDER! CAPENTER AND JOINER.
The joiners fit all the internal doors. They have to cut out all the hinge positions and fix these in place as well as the locks and keepers and fit the.
QuickWalls® strong. fast. simple. *Light Weight *Insulated
Building for Learning Project Photo Progress Report 5 December 2009 – February 2010 Project commencement 21 st September 2009.
Prof Ralph V. Locurcio, PE CON 2001 CVE Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.
CHELSEA LINKS 22 LAWSON STREET NELSON BAY NEW TOWNHOUSES DUE FOR EARLY 2016 Architecturally designed townhouses are now being offered for sale! 5 x 3 Bedroom.
Week 6 Timber based columns
The space behind the window sill has to be filled up with concrete and the cavity walls have to be filled up with insulation. One way is to pump the insulation.
Sprinkler Loads on Trusses
Lesson 5.  The carpentry trade covers many items. That is, it is not confined to a few specific items such a reinforcing steel, painting etc.  Common.
1BED & 2 BED APARTMENTS – TOTAL 40 UNITS TOP FLOOR BRICK WORK IN PROGRESS.
JLC CONSTRUCTION FIELD GUIDE The most comprehensive and trusted reference guide to best practices for the construction market ANY TIME. ANY PLACE. ANY.
Construction Foundations of Technology Construction © 2013 International Technology and Engineering Educators Association STEM  Center for Teaching and.
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
Unit 210: How to communicate with others
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 29 PowerPoint presentation Types of organisation,
AUSTERVILLE RECTIFICATION PROJECT. PROJECT DETAILS 1148 OF DWELLINGS TO BE RECTIFIED BUDGETED AT R / UNIT TOTAL BUDGET R 96 million EXPECTED.
 We have the perfect solution to rebuild and prevent damage from future Flood, Wind and Fire.  QBSI is an Australian based company supplying building.
Floor Systems and Foundation Support
Professional Landscaping Company in Victoria, BC
Commercial Constructions o Nations Construction provides best Commercial Constructions service. Commercial Constructions o It is one of the best construction.
Foundations of Technology Construction
Prefabricated Timber Frame Construction
Major Steps In Building a SFR
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
RIBA Plan of Work 2013.
Craft Occupations in the Construction Industry
Residential Wall Systems
Skill Pro Handyman EMERGENCY HANDYMAN REPAIRS. Handyman Services in Sydney Property and home owners will surely need various kinds of remodelling, installation.
“Planning and Scheduling a SIMPLIFIED Construction Project” BCT458 September 27, 2009 Group Signatures Taggart.
History of Pool Construction
2911 AW Grimes Blvd., Pflugerville TX 78660
Welcome to Haberfield Holdings
Both D bathrooms and e kitchen What makes you special!
Residential Wall Systems
FINISHES (FLOOR, WALL & CEILING)
House Construction Budget Plan
Foundations of Technology Construction
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
RIBA Plan of Work 2013.
Presentation transcript:

Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle WA USA. We offer customer satisfaction commercial building service, residential construction building service, industrial construction building service, remodels, repair and maintenance service, general contractor service several areas of Washington.

Construction Phase Include 1) Site Preparation, 2) Slap 3) Frames and Roof Trusses 4) Roof Tiling of Metal Roofing 5) Brick Work 6) Rough Linings 7) Internal Linings 8) Waterproofing and Tiling 9) Timber Mould Out 10) Lock Up 11) P.C Fit Out 12) Practical Completion 13) Handover 14) Thanks

Site Preparation This involves clearing of the site and pegging out of the site by the surveyor. Sometimes retaining walls will also be built at this stage if required.

Slab The plumber will need to lay plumbing that will be located beneath the slab of the development. This needs to be done before the slab can be formed up. The slab pairing is then completed as per the engineer’s specifications and plans and then the slab can be poured. It’s very exciting to see the slabs go down.

Frames and Roof Trusses The frames are generally prepared before being delivered to site and can be erected very quickly with a day or so. It’s great to walk around the site once the frames are up and get a feel for each room.

Roof Tiling of Metal Roofing Some builders prefer to complete the roof before starting the brickwork and other builders work the other way around. I’ve found predominately builders want to get the roof on as quickly as possible to protect the frames.

Brick Work This stage really gives the development true structure, and you can feel the development making good progress when you see the brickwork completed.

Rough Ins This involves the electrical and plumbing wiring and pipes to be installed before the internal linings to the frames.

Internal Linings After the rough in is complete, the insulation will be installed into the wall and ceilings and then the plaster will start on lining the walls and ceilings. You really get a good sense of space within the dwellings at this stage.

Waterproofing and Tiling The wet areas will be water-proofed in preparation for the tilers to start work, generally after or even during the timber mould out.

Timber Mould Out This stage involves the carpenters installing the skirting boards, architraves, door jams and doors and kitchens.

Lock up Is when all external doors including garage doors are on.

P.C. Fit Out P.C. is a term for a prime cost item and includes tap ware, bath, mirror, vanities and other accessories, which are installed at this stage.

Practical completion This is the point in time when an inspection is conducted when builder is almost finished. You will walk through the development with the site manager and point out any items that still need attention. By this time it should only be touch ups and minor items requiring installation.

Handover This is when you are happy the construction has been completed to your satisfaction and to the plans and after paying the builder’s final invoice, keys will be handed over to you.

THANKS FOR WATCHING CONSTRUCTION BUILDING AND BUILDING CONTRACTORS SERVICE FOR TOPRUN LLC.