2010-04-15E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.

Slides:



Advertisements
Similar presentations
FC7 AMC FMC carrier for CMS
Advertisements

TileCal Optical Multiplexer Board 9U VME Prototype Cristobal Cuenca Almenar IFIC (Universitat de Valencia-CSIC)
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
HCAL FIT 2002 HCAL Data Concentrator Status Report Gueorgui Antchev, Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
Huazhong Normal University (CCNU) Dong Wang.  Introduction to the Scalable Readout System  MRPC Readout Specification  Application of the SRS to CMB-MRPC.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
21 January 2003Paul Dauncey - UK Electronics1 UK Electronics Status and Issues Paul Dauncey Imperial College London.
Preliminary Design Review: Hub Implementation Dan Edmunds, Wade Fisher, Yuri Ermoline, Philippe Laurens Michigan State University 01-Oct-2014.
SRS Readout System for VMM2 Sorin Martoiu, IFIN-HH (RO)
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Saverio MINUTOLITOTEM Trigger Meeting 12 January ~6k wires VFAT2 CSC T1 ARM 1 8 x ~6k wires VFAT2 CSC T1 ARM 1 8 x2 1 x2x15 30 T1 TRG_TOTFED.
Gueorgui ANTCHEVPrague 3-7 September The TOTEM Front End Driver, its Components and Applications in the TOTEM Experiment G. Antchev a, b, P. Aspell.
Trigger Interface and Distribution J. William Gu Jefferson Lab 1. What is TID 2. TID Structure and functions 3. Possible usage in the system 4. TID related.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
MTF7 hardware status Alex Madorsky for UF group. Muon Trigger structure rework A. Madorsky2 Endcap TF Overlap TFBarrel TF - Overlap TF is now.
CMX Collection file for current diagrams 30-Apr-2014.
SRS Trigger Processor Option Status and Plans Sorin Martoiu (IFIN-HH)
S. Durkin, CMS EMU Meeting U.C. Davis Feb. 25, DMB Production 8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board 550 Production Boards.
Electronic System Design GroupInstrumentation DepartmentRob Halsall et al.Rutherford Appleton Laboratory30 July 2001 CMS Tracker FED CMS Tracker System.
Gueorgui ANTCHEV PH-TOT TOTEM Collaboration Meeting – December TOTFED – Firmware (1) Firmware: - 3 different ALTERA FPGA’s Cyclone Stratix Stratix.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
Global Trigger Upgrades for SLHC Vienna, Global Trigger Group A.Taurok, C.-E. Wulz SLHC Workshop, FNAL, 19 Nov
E. Hazen -- Upgrade Meetings1 AMC13 Project Development Status E. Hazen, S.X. Wu - Boston University.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- ACES ACES 2011 MicroTCA in CMS E. Hazen, Boston University for the CMS collaboration.
Eric Hazen1 Ethernet Readout With: E. Kearns, J. Raaf, S.X. Wu, others... Eric Hazen Boston University.
E. Hazen -- CMS Week HCAL Back-End MicroTCA Upgrade Status E. Hazen Boston University.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- xTCA IG1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 HCAL uTCA Readout Plan E. Hazen - Boston University for the CMS HCAL Collaboration.
E. Hazen -- TWEPP MicroTCA Developments in CMS E. Hazen - Boston University for the CMS Collaboration TWEPP 2012 – Oxford.
10/28/09E. Hazen FNAL Workshop1 HCAL DAQ / Timing / Controls Module Eric Hazen, Shouxiang Wu Boston University.
E. Hazen -- Upgrade Meetings1 AMC13 Project DAQ and TTC Integration For MicroTCA in CMS Status Report E. Hazen - Boston University for the CMS.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 Fermilab CMS Upgrade Workshop November 19-20, 2008 A summary of off-detector calorimeter TriDAS electronics issues Eric Hazen, Boston.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
T. Gorski, et al., U. Wisconsin, April 28, 2010 SHLC RCT MicroTCA Development - 1 SLHC Cal Trigger Upgrade SLHC Regional Calorimeter Trigger MicroTCA Development.
E. Hazen -- Upgrade Week1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
HO / RPC Trigger Links Optical SLB Review E. Hazen, J. Rohlf, S.X. Wu Boston University.
MicroTCA Introduction ● New telecom standard from PICMG ● 75mm high cards with ~ 10Gbit/sec serial backplane (up to 20 ports) ● Selected for SLHC trigger.
E. Hazen - Back-End Report1 AMC13 Status Update ● Version 1 (5Gb/s links, Virtex-6 chip) ● 15 modules built, all but 3 distributed to colleagues.
E. Hazen - CMS Electronics Week
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
26 Sept 2013E. Hazen - TWEPP / AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University Representing the work of J. Rohlf, S.X. Wu, A. Heister,
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
AMC13 Project Status E. Hazen - Boston University
DAQ and TTC Integration For MicroTCA in CMS
TWEPP 2010 – Aachen Development of a MicroTCA Carrier Hub
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
The First HCAL Readout Schedule! (7/22/99 UMD meeting)
AMC13 Module CMS MicroTCA Overview E. Hazen – Boston University
E. Hazen - Back-End Report
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
AMC13 Status Report AMC13 Update.
Production Firmware - status Components TOTFED - status
LATOME LAPP Nicolas Dumont Dayot on behalf of the LAPP team
HCAL Data Concentrator Production Status
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
Status of the oSLB project
xTCA in CMS Magnus Hansen Thanks to many CMS collaborators
MicroTCA A look at different options...
DAQ Interface for uTCA E. Hazen - Boston University
FED Design and EMU-to-DAQ Test
HCAL DAQ Interface Eric Hazen Jim Rohlf Shouxiang Wu Boston University
Presentation transcript:

E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University

E. Hazen - DTC2 HCAL DTC (aka CMS-MCH) What should it do (for HCAL, others)? Send timing/controls and buffer state from AMCs Concentrate DAQ data, send to central DAQ Optionally, manage selective readout Implementation Lives in MCH slot for connectivity Based on NAT-MCH base board Stack of 2 custom mezzanines plus connector board

E. Hazen - DTC3 HCAL DTC (aka CMS-MCH) T1 T2 T3 T4 NAT-MCH base board Standard MCH functions GbE to mezzanines SPI for flash programming I2C bus T2 gets power, GbE, SPI, I2C from NAT-MCH. 3.3V Regulators Clock fanout Spartan-3A FPGA Single-width MCH module Provides controls, clock distribution (TTC initially) Provides DAQ interface via fat pipes (external SLink/TTS adapter) Font panel I/O: 2x SFP+ optical transceiver DAQ + Spare TTCrx fiber receiver Built on NAT-MCH base board T3 logic board V6 FPGA Fabric I/O to T3, T4 Connector board TTC optical rx, CDS SFP+

E. Hazen - DTC4 Front Panel 2 x SFP(+) TTC Fiber rx GbE Port 1 GbE Port 2 Provided by NAT-MCH Provided by DTC mezzanines

E. Hazen - DTC5 Sparta n 3A FOFO FOFO FOFO FO DIV Virtex 6 Op to Rx CD R Tx: TTC Rx: TTS Fabric D (port 4/8) DAQ I/O Fabric B (port 2/3) Fabric E (port 5/9) Spare Ctrl CLK1 40.xxx LHC Clk 160MHz TTC Data 160MHz 40Mhz TTC in T3 PCB T2 PCB DTC – Emphasis on CLK/Ctrl for 2010 TB and tests GT X GbE Switch 40/80 Mhz TTC Data SFP+ (2) DAQ

E. Hazen - DTC6 First prototype PCB TTC Input JTAG CPLD (Will omit in Final design) Spartan-3A FPGA TTC decoding, MCH interface Flash memory Voltage Regulators Mounted on NAT-MCH Base board

E. Hazen - DTC7 DTC 2010 Prototype First proto T2 board tested Management functions, flash, FPGA prog all working fine TTC receiver/decoder in Spartan-3 ok  Waiting for TruLight opto-rx for final jitter tests Final layouts of T2, T3 and connector PCB almost done T2 in fab, T3 about to go out Fabricated / assembled by mid-May All parts here or expected shortly

E. Hazen - DTC8 DAQ / Controls for SLHC Phase I, II Compatibility with existing system TTC support built-in SLink64, TTS provided via adapter (details follow) Future Options Up to 6Gb fiber I/O in prototype; upgrad easy to 10Gb Invited to participate in new RUWG-like group by DAQ to define new DAQ interface for phase II Worst-case scenario is we must replace one DTC PCB for phase II -- not bad

E. Hazen - DTC9 Legacy DAQ Adapter Carrier PCB (i.e. 9U VME!) Power (only) from VME SFP+ SLink64 SFP+ SLink64 Virtex 5/6 FPGA Fiber I/O from 2 uTCA crates Crate 1: SLink (2) TTS Dual RJ-45 Crate 2: TTS SLink (2) One i.e. 9U VME module handles two uTCA crates, each with 400MBytes/sec out