Optimizing and controlling process through statistical process control Chapter 18 page 442 Doaa Abu Alwafa.

Slides:



Advertisements
Similar presentations
Statistical Quality Control Basic Concepts Product Control Process Control Variations in Quality.
Advertisements

Quality Tools and Techniques Standards in Action Quality Tools and Techniques Practicing quality techniques Author:
Oil Analysis Implementation Strategy J. Mike Weiksner BSME - Auburn University Years in Industry (EMO) Hold Certifications in Vibration & Oil.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render Principles.
HABEEB HATTAB HABEEB Office: BN-Block, Level-3, Room Ext. No.: 7292 H/P No.:
By: Dr. David L. Goetsch and Stanley Davis Based on the book
Chapter 5. Methods and Philosophy of Statistical Process Control
CD-ROM Chap 17-1 A Course In Business Statistics, 4th © 2006 Prentice-Hall, Inc. A Course In Business Statistics 4 th Edition CD-ROM Chapter 17 Introduction.
S6 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S6 Statistical Process Control PowerPoint presentation to accompany Heizer and Render.
By: Dr. David L. Goetsch and Stanley Davis Based on the book
© 2008 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control PowerPoint presentation to accompany Heizer/Render Principles.
Tumolo’s Toolbox 7 Step Improvement Process.
Tools of quality control A-Team. Basic tools of quality control  control chart  histogram  Pareto chart  check sheet  cause-and-effect diagram 
11-1 Quality Improvement Model Purpose: To provide a sequence of steps to improve any process so that the customers will realize the highest quality and.
8-1 Quality Improvement and Statistics Definitions of Quality Quality means fitness for use - quality of design - quality of conformance Quality is.
Statistical Process Control
MIM 558 Comparative Operations Management Dr. Alan Raedels, C.P.M.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Statistical Process Control
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
Total Quality Management BUS 3 – 142 Tools of Quality Week of Mar 7, 2011.
TOTAL QUALITY MANAGEMENT (Continuous Quality Improvement)
15 Statistical Quality Control CHAPTER OUTLINE
Paul Prunty The 7 Basic Quality Tools ~ The DMAIC Process Continuous Improvement and … To a hammer, everything’s a nail … How many tools do you have in.
IE 355: Quality and Applied Statistics I Short Run SPC
Quality Control and Improvement
Statistical Process Control
Chapter 18 Optimizing and Controlling Processes through Statistical Process Control.
10-1Quality Control William J. Stevenson Operations Management 8 th edition.
© 2005 Wiley1 Total Quality Management Chapter 5.
THE MANAGEMENT AND CONTROL OF QUALITY, 5e, © 2002 South-Western/Thomson Learning TM 1 Chapter 12 Statistical Process Control.
Overview of Total Quality Tools
1 Software Quality Engineering CS410 Class 5 Seven Basic Quality Tools.
Tools and Techniques for Performance Excellence
SIX-SIGMA QUALITY Chapter Understand total quality management. 2. Describe how quality is measured and be aware of the different dimensions of quality.
Chapter 36 Quality Engineering Part 2 (Review) EIN 3390 Manufacturing Processes Summer A, 2012.
Statistical Process Control Chapters A B C D E F G H.
Business Statistics: A Decision-Making Approach, 6e © 2005 Prentice-Hall, Inc. Chap 17-1 Business Statistics: A Decision-Making Approach 6 th Edition Chapter.
MANAGING FOR QUALITY AND PERFORMANCE EXCELLENCE, 7e, © 2008 Thomson Higher Education Publishing 1 Chapter 14 Statistical Process Control.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Statistical Process Control (SPC)
Chapter 36 Quality Engineering (Part 2) EIN 3390 Manufacturing Processes Summer A, 2012.
Operations Management
By: Dr. David L. Goetsch and Stanley Davis Based on the book
Measure : SPC Dedy Sugiarto.
Eng. Mgt 385 Statistical Process Control Stephen A. Raper Quality Management.
Chapter 8 Problem-Solving Using Define, Measure, Analyze, Improve, Control.
2 How to use the seven tools of quality Tools for identifying problems / collecting data Check sheets Scatter diagrams Statistical process control (SPC)
6 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry Render.
1 Project Management C53PM Session 3 Russell Taylor Staff Work-base – 1 st Floor
Inspection- “back-end quality control” BUT, Start by designing quality into the front end of the process- the design QFD (Quality Function Deployment)
Traditional Economic Model of Quality of Conformance
Using Total Quality Management Tools to Improve the Quality of Crash Data John Woosley Louisiana State University.
Quality Control  Statistical Process Control (SPC)
Quality Control All activities undertaken to control materials, processes and products in order to ensure quality of conformance Detects defects before.
THE 7 BASIC QUALITY TOOLS AS A PROBLEM SOLVING SYSTEM Kelly Roggenkamp.
UNIT 5.
Section 5 Control Charts. 4 Control Chart Applications Establish state of statistical control Monitor a process and signal when it goes out of control.
Yandell – Econ 216 Chapter 17 Statistical Applications in Quality Management Chap 17-1.
36.3 Inspection to Control Quality
How to use SPC Before implementing SPC or any new quality system, the manufacturing process should be evaluated to determine the main areas of waste. Some.
POPULATION VERSUS SAMPLE
Optimizing and controlling process through statistical process control
TM 720: Statistical Process Control
DMAIC STANDARD WORK TEMPLATE
The 7 Basic Quality Tools ~ The DMAIC Process
DMAIC STANDARD WORK TEMPLATE
BUS 4543 Quality Management Tools
Six Sigma (What is it?) “Six sigma was simply a TQM process that uses process capabilities analysis as a way of measuring progress” --H.J. Harrington,
Presentation transcript:

Optimizing and controlling process through statistical process control Chapter 18 page 442 Doaa Abu Alwafa

STATISTICAL PROCESS CONTROL DEFINED All process are affected by multiple factors such as: 1.The environment the machines employed 2.The materials used 3.The methods(work instruction) provides 4.The measurement taken 5.The manpower(people) who operate the process These factors called the 5 M’s

STASTISTICAL PROCESS CONTROL DEFINED Statistical process control (SPC) is a statistical method of separating variation resulting from special causes from variation resulting from natural causes in order to eliminate the special causes and to establish and maintain consistency in the process, enabling process improvement.

Rational for SPC 1.Control of variation 2.Continual improvement 3.Predictability of processes 4.Elimination of waste 5.Product inspection

Control chart development Data categoryChart typeStatistical qualityapplication Variables(measured values) x bar-R( See figure page 453 Mean value and rangeCharts dimensions and their precision, weight, time, strength, and other measurable quantities. example: anything physically measurable x tilde-R(Median and rangeCharts measurable quantities, similar to x bar-R, but requires fewer calculation to plot. Example as above

Control chart development(continue) Data categoryChart typeStatistical qualityapplication Variables(measured values) x-Rs(also called x- chart See figure page 453 Individual measured values Used with long sample intervals; when subgrouping not possible. Example: products made in batches such as solution, coaching, etc. or grouping too expensive. Histogram must be normal

Control chart development(continue) Data categoryChart typeStatistical qualityapplication Attributes(counted values) p-chart See figures page 454, 455 Percentage defective (also fraction defective) Charts the number of defects in samples of varying size as a percentage or fraction. Example: anywhere defects can be counted np-chart(also pn)Number of defective pieces Charts the number of defective pieces in sample of fixed size. Example: as above, but in fixed- size samples

Control chart development(continue) Data categoryChart typeStatistical qualityapplication Attributes(counted values) c-chart See figure page 457 Number of defectsCharts the number of defects in a product( single piece) of fixed size. Example: specific assemblies or products( e.g., pc boards, tires) u-chartNumber of defects per unit area, time, length, etc. Charts the number of defects in a product of varying size (i.e., unlike products). Example: Carpet( area), extrusions length)

Management’s role in SPC 1.Commitment 2.Training 3.Involvement See page 462

Role of the total quality tools There are several tools: 1.Pareto charts 2.Cause and effect diagrams 3.Stratification 4.Check sheets 5.Histograms 6.Scatter diagrams 7.Run charts and control charts 8.Flow charts 9.Design of experiments 10.Five-s 11.Failure mode and effects analysis(FMEA)

Role of the total quality tools(continue) With SPC, the total quality tools have a dual role: First: they help eliminate special causes from the process so that the process can be brought under control. Second: their second role comes into play when, from time to time, the control chart reveals cause or when the operators wants to improve a process that is in control.

Implementation and deployment of SPC The implementation steps are divided into three phases: 1.preparation 2.planning 3.execution

Implementation and deployment of SPC (continue) phaseresponsibilityaction preparationTop management Consultant or in-house expert Step 1:Commit to SPC Step 2:Organize SPC committee Step 3:Train SPC committee planningSPC committee assisted by consultant or experts Consultant or in-house expert QA Management Step 4: Set SPC objectives Step 5:Identify target processes Step 6: train appropriate operators and support personnel Step 7: ensure repeatability of instruments and methods Step 8: delegate responsibility for operators to play key role

Implementation and deployment of SPC (continue) phaseresponsibilityaction executionSPC committee, operators, suppliers, customers Operator w/ expert assistance Consultant or in-house expert Operator Operator w/ expert assistance Operator SPC committee and management Operator w/ assistance as required All Step 9: flowchart the process Step 10: eliminate the special causes of variation Step 11: develop control charts Step 12: collect and plot SPC data; monitor Step 13: determine process capability Step 14: Respond to trends and out-of-limits data Step 15: track SPC data Step 16: eliminate root causes of any new special causes of variation Step 17: continually improve the process (narrow the limits)

Inhibitors of SPC 1.Capability in statistics 2.Misdirected responsibility for SPC 3.Failure to understand the target process 4.Failure to have processes under control 5.Inadequate training and discipline 6.Measurement repeatability and reproducibility 7. low production rates See page