A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment.

Slides:



Advertisements
Similar presentations
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Advertisements

TBITE 05/15/ Heather Sobush, Senior Planner Christopher Cochran, Senior Planner
City of High Springs - Traffic Study City of High Springs Traffic Study Sept. 16th, 2003 Public Meeting #2.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Presented to presented by East Central Florida Corridor Task Force Space Coast TPO 02/16/15 Huiwei Shen Systems Planning Florida Department of Transportation.
Greater Cleveland Regional Transit Authority THE HEATHLINE EUCLID CORRIDOR BUS RAPID TRANSIT PROJECT Michael J. Schipper, P.E DGM- Engineering & Project.
1 Bayshore Elementary School District Community Forum November 12, 2014.
State of Florida Department of Transportation SR 7 (US 441) Value Engineering Study September 24-28, 2001 Segment III - From North of Hollywood Blvd to.
Economic Stimulus Information Meeting Project Information Overview March 18, 2009 W. H. Stuart Center.
1 S.R. 426/C.R. 419 Project Update City Council Work Session November 13, 2006.
PROPOSED HPD BIKE-PED MASTER PLAN HPD PRESENTATION.
State Highway 6 Corridor Access Plan. SH 6 Project Description Project Initiated and funded by –City of Houston –Missouri City –City of Sugar Land –Harris.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Broward Transformation: 2035 Long Range Transportation Plan mpo.org.
Florida Department of Transportation District 4 TSM&O Program Advanced Transportation Management System (ATMS) Installation in South Broward County ATMS.
River to Sea TPO CAC A Presentation to: May 19, 2015.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Improving Your World. RS&H tradition began in 1941 Employee-owned company Six programs of client-focused services Multi-disciplined team of planners,
Multimodal Corridor Plan BCC Discussion Item Transportation Planning Division August 19, 2014.
South/West Corridor Improvements Service and Facility Alternatives September 9, 2014 Planning & Project Development Committee March 3, 2015.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Monroe Street Access Management and Lake Ella Implementation Study CRTPA Board Meeting January 23, 2012.
Polk Transportation Planning Organization 2035 Mobility Vision Plan June 2010 Steering Committee - January 28, 2010 Polk Transportation Planning Organization.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Greenwood Transit and Sidewalk Project N 90th St to N 105th St Community Open House Sarah Butler, Project Manager September 14, 2015 Presentation begins.
Metrobus 30s Line Study Improving Your Customer’s Transit Experience Virginia Transit Association May 20,
Public Comment Mobility Vision Plan 2035 MVP Website 2035 MVP Brochure and Survey. Provides specific information on the Plan Update. Survey – your opinion.
Broward Complete Streets Technical Advisory Committee (TAC) Meeting Monday August 10, 2015.
Urban Partnership Agreement Summary August 27, 2007.
AGENDA OPEN HOUSE 6:00 – 8:00 PM  Review materials  Ask questions  Provide feedback on purpose, needs, and alternatives  Sign up for list  Fill.
1 SOUTH FLORIDA EAST COAST CORRIDOR TRANSIT ANALYSIS STUDY Municipal Meetings September 2006.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
How Would a Transportation – Land Use Grant Program Work in the Washington Region? Presentation to the Transportation Planning Board Technical Committee.
West Phoenix / Central Glendale Transit Corridor Study Public Meetings May 2013.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Regional Transit Study Project Update. Four open houses held between November , 2009 Informed and engaged the public in the study process Provided.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
Premium Transit District 4, Office of Modal Development Making the Connection.
PROJECT UPDATE PUBLIC OPEN HOUSE #5 MARCH 12 4:00 PM – 6:00 PM Northern Service Center.
COUNTY ROAD 517 Improvements from State Highway 172 to Howe Drive DECEMBER 16, 2015 At Tribal Multipurpose Facility.
Metropolitan Council 1 Twin Cities Region Transportation Policy Plan Nacho Diaz Metropolitan Council Evaluating Economic and Community Impacts of Transit.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2013/14 – 2017/18 Presentation to Board of County.
ALACHUA COUNTY TRANSPORTATION PRIORITIES FOR FLORIDA DEPARTMENT OF TRANSPORTATION WORK PROGRAM Fiscal Year 2015 – 2019 Presentation to Board of County.
South/West Corridor Transit Improvements ZARZAMORA AND MILITARY PRIMO BRT PROJECTS ENVIRONMENTAL AND PRELIMINARY DESIGN PHASE September 9, 2014 VIA Community.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
Virginia Street Bus RAPID Transit Extension City of Reno Council Meeting April 29, 2015.
District VI, Florida Department of Transportation SE 2 nd Avenue and SE 4 th Street/Biscayne Boulevard Way March 25 th, 2014 Bicycle/Pedestrian Advisory.
U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET INTERSECTION IMPROVEMENTS U.S. 1 AT CANAL STREET From South of Smith Street To.
The Reno Streetcar March 8, 2016 RTC 2040 Regional Transportation Plan Economic Development Forum.
STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY - US 19 to BRUCE B. DOWNS BOULEVARD STATE ROAD 54/56 PROJECT CONCEPT DEVELOPMENT STUDY.
Colfax Corridor Connections (Denver) & 15/15L Transit Priority Study (RTD) RTD Board - Planning & Development Committee August 6, 2013.
Calvin, Giordano & Associates, Inc.
Pedestrian Facility Improvement Program
Multi Agency Exchange May 16, 2017.
S.R. 44 Corridor Management Plan S.R. 44 Corridor Management Plan
S.R. 30A / U.S. 98 / Panama City Beach Parkway
US 92 Pedestrian Connectivity & Safety Assessment Study
BELLE TERRE BLVD/PKWY CORRIDOR COMMUNITY DEVELOPMENT DEPARTMENT
2010 Regional Intelligent Transportation Systems Plan: 2017 Progress Report on Implementation The Florida-Alabama, Okaloosa-Walton, and Bay County Transportation.
River to Sea TPO Meeting US 92/International Speedway Boulevard
US 92 Pedestrian Connectivity & Safety Assessment Study
Florida Transportation Commission FY 2009
SANDY SPRINGS CITY COUNCIL MEETING
Hillsborough County Initiatives to Address School Safety
Status Report on Rochester’s DMC Transportation Plan
MPO Board Presentation
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
Presentation transcript:

A presentation by Kittelson & Associates, Inc. Broward Boulevard Presentation to the Broward MPO TCC and CIR March 2012 Agenda Item NA-1, Attachment

A presentation by Kittelson & Associates, Inc. Broward Corridor Project Types Transportation System Management and Operations ITS ATMS Reconstruction Rehabilitation Resurfacing (RRR) Operations/ Maintenance Landscaping/ Facilities Land Use/ Redevelopment Transit Livability Grant New buses Bus stops Landscaping Terminal Upgrades BCT Program New shelters and amenities Mobility Hubs Fort Lauderdale Plantation Fort Lauderdale Downtown Master Plan Downtown New River Master Plan Police Station Housing Authority I-95 Interchange Plantation Central Plantation Conceptual Master Plan (Midtown) Community Redevelopment Plan (Gateway) Broward Blvd. Transit Study Central Broward East- West The Wave Streetcar SFECC Shelters & Amenities Program Universal Fare Card AVL System Installation

A presentation by Kittelson & Associates, Inc. Broward Corridor Projects Timeline* Funded Projects Near (0-4 yrs)Mid (5-9 yrs) Long (9+ yrs) ‘11/’12‘13 ‘14 ‘15 ‘16/’17‘18‘19 ‘20 ’21-’30 Flagler Greenway Livability Grant Broward Transit Study BCT Shelters/Amenities ATMS RRR The Wave Streetcar Central Broward E/W SFECC LRTP Mobility Hubs *Timeline subject to change

A presentation by Kittelson & Associates, Inc. Project Limits US 1 Pine Island Rd Where Plantation Lauderhill Ft. Lauderdale I-95 Turnpike SR 7 University Dr Purpose and Needs Increase Corridor Transit Mobility Increase Access to Transit Improve Quality of Transit Service

A presentation by Kittelson & Associates, Inc. Coordination Efforts Coordination and Partner Meetings 15+ Meetings Occurred Agencies Florida Department of Transportation, District 4 Planning, Operations, Office of Modal Development, Design, ROW Broward Metropolitan Planning Organization Broward County Transit, Traffic Engineering, Planning South Florida Regional Transportation Authority City of Fort Lauderdale City of Plantation City of Lauderhill Who

A presentation by Kittelson & Associates, Inc. Project Work Plan Data Collection Previous Studies Existing Conditions Problem Definition Project Development Corridor Analysis Simulation Conceptual Design Final Concept How

A presentation by Kittelson & Associates, Inc. Alternative 1 – Future Baseline ~$20-25 Million Invested! BCT –Transit Shelters and Amenities Program –9, New buses –Broward Central / West Regional Terminal Renovations FDOT –Advanced Traffic Management System –Broward Boulevard RRR Project –Universal Fare Card (in conjunction with the MPOs) Cities –Median Landscaping (Fort Lauderdale/Plantation)

A presentation by Kittelson & Associates, Inc. Alternative 2 – Enhanced Local Service Transit Signal Priority –all signalized intersections Queue Jumps –SR 7, W 24 th Avenue Bus Stop Location Optimization –SR 7 Local Sidewalk and Crosswalk Additions –Corridor-wide Secured Bicycle Storage –Broward Central and West Regional Terminals

A presentation by Kittelson & Associates, Inc. Alternative 3 – Express Service Limited Stop Overlay Service New Stop Locations –SR 7, Tri-Rail, W 1 st Ave Transit Priority Left Turn Phasing –Pine Island Rd, W 84 th Ave, University Dr Pedestrian Connection –Tri Rail Fort Lauderdale Station to Broward Boulevard Park-n-Ride Lot –West Regional Terminal

A presentation by Kittelson & Associates, Inc. Alternative 4 – Transit Lanes Business Access and Transit (BAT) Lanes Corridor viewSigningIntersection view

A presentation by Kittelson & Associates, Inc. Future Baseline Existing programmed projects Capital Cost: ~$20 – 25 Million Operating Cost: ~$4.5 Million / Year Alternative 1Alternative 4 Alternative 3 Alternative 2 Business Access and Transit Lane Alternative 3 with curbside lane for transit and right- turning vehicles Capital Cost: ~$4.9 Million Operating Cost: ~$4.6 Million / Year Limited Stop Overlay Service Adds Limited Stop Rapid Service to existing route with schedule adjustment Capital Cost: ~$3.7 Million Operating Cost: ~$5.1 Million / Year Enhanced Local Service Maintains existing Route 22 service with minor corridor improvements Capital Cost: ~$1.6 Million Operating Cost: ~$4.2 Million / Year

A presentation by Kittelson & Associates, Inc. Preferred and Recommended – Alternative 3 Substantially improved transit service –Express service is ½ the transit travel time of the local –Enhanced pedestrian facilities Potential access for more than 6,500 additional people –Via downtown Fort Lauderdale loop Potential for additional future improvement –Business Access and Transit Only lanes Elements support other services –RTA Shuttles, Sun Trolley, I-95 Express, I-595 Express, Wave Little impact to corridor vehicle capacity

A presentation by Kittelson & Associates, Inc. Next Steps Develop and finalize scope for Phase II, Design Involves significant amount of coordination Begin Phase II activities Develop critical path with partners Work on a continuous basis with implementing agencies Ensure successful implementation Continuous coordination with other on-going future baseline projects ATMS, RRR, Greenlights, Shelters and Amenities, Terminal upgrades, etc.

A presentation by Kittelson & Associates, Inc. Building Connections… Coordination with City of Fort Lauderdale’s Broward Boulevard Gateway Implementation Project One project with three components: 1.The Broward Boulevard Gateway Implementation Project 2.The Downtown Fort Lauderdale Walkability Analysis 3.The Downtown Fort Lauderdale Joint Development Initiative Gateway Implementation Project to lay out City’s long-term vision for Broward Boulevard. Project Workshop is Summer 2012

A presentation by Kittelson & Associates, Inc. Broward Boulevard For more information, please contact: FDOT D4 Project Manager Khalilah Ffrench, Consultant Project Manager Jessica Josselyn,