Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the.

Slides:



Advertisements
Similar presentations
AMSAT-NA FOX Satellite Program Review, Status, and Future JERRY BUXTON, NØJY AMSAT VP-ENGINEERING.
Advertisements

Slide 1 MIPA Progress Presentation For SERENA Progress meeting, Santa Fee, May 2008 Prepared by Johan Svensson and Stas Barabash.
Solar turbine. If the sun's rays fall on the photovoltaic cell, which is connected to the side of the windmill, it is converted into electricity able.
RULES FOR THE 2013 SOLAR CAR CHALLENGE. Important Dates September 1 to January 31 - “Intent-to-Race” Form This notifies Race Officials of your team’s.
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
Payload Design Criteria for the Space Test Program Standard Interface Vehicle (STP-SIV) Mr. Mike Marlow STP-SIV Program Manager Payload Design Criteria.
BillikenSat – II Pico-Satellite that conforms to the CubeSat standard Team Leader: Darren Pais Electrical Eng.: Ben Corrado Payload: Rob Arechederra MISSION:
Delta II –7920 Fitup Study Model TMA-56 f10 optics In-Line configuration Delta II Launch Vehicle 7920 H 10L Composite Fairing.
Tower Electronics Module and Tower Power Supply EM Tower Electronics Module (TEM) before coating/staking TEM & TPS assembly Close to 60 TEM & TPS assemblies.
AMS-02 tracker mechanics status of construction, assembly, integration Production: - Ladder integration - Installation on planes Inner tracker assembly:
Smart Home Current Progress Summary. Main Processor – Stellaris.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Final Version Bob G. Beaman May 13-17, 2002 Micro-Arcsecond Imaging Mission, Pathfinder (MAXIM-PF) Electrical Power System (EPS)
Progress Report 2010 John Parker Chairman, Get Ready Central Florida.
1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /
IMPRS June Space Research, in praxis, illustrated by a ground-based example The „Ozonometer“ as a student project.
Bob G. Beaman June 28, 2001 Electrical Power System SuperNova / Acceleration Probe (SNAP)
KUMU A’O CUBESAT Amy Blas. Background 2 What is CubeSat?  10x10x10 centimeter cube  Launched in lower earth orbit (LEO)  The project started last.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
USAFA Department of Astronautics I n t e g r i t y - S e r v i c e - E x c e l l e n c e Astro 331 Electrical Power Subsystem—Intro Lesson 19 Spring 2005.
A Solar Powered Bus Stop System
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
Mechanical SuperNova/Acceleration Probe SNAP Study Dave Peters George Roach June 28, a man who's willing to make a decision in the first place can.
Philip Luers NASA/GSFC Code 561 August 16-17, 2005
DINO PDR 23 October 2015 DINO Systems Team Jeff Parker Anthony Lowrey.
Please read all the instructions carefully before the installation. Installation shall be carried out by experienced mechanic. Follow the steps in the.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
1 IBL Integration & Testing activities University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, M. Weber  Preliminary definition of Integration.
PCB procurement WG Status report PCB WG status, 25/03/2014Joerg Wotschack.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
CMS ECAL End Cap Meeting CERN 18 Oct to 22 Oct ECAL End Cap High Voltage and Fibre Optic Monitoring Systems Progress. Progress on High Voltage and.
Complex Circuits Notes Series Circuit + Parallel Circuit = Complex Circuit.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
1 Laser Swarm EPS Final Design Solar panel hold down and release mechanism Solar panel deployment Pointing driver Bus regulation Battery Solar panels Summary.
GIST 24 Meeting GERB Hardware Status 14 th December 2005 Eric Sawyer.
[1]. Mardreagus Williams Electrical Engineer -Electrical Subsystem Design - Hardware Design.
Haripriya Head, Integration Team Pratham, IIT Bombay 19 th June, 2010.
Goddard Space Flight Center Cryogenics and Fluids Branch Status of the AMS-02 Cryocooler January 2007 TIM.
Prox-0.3 Georgia Institute of Technology Kiichiro DeLuca Richard Zappulla Matt Uhlman Ian Chen 1.
AEP Mechanical and Power System H. Heetderks. CDR July, 2001NCKU UCB Tohoku AEP Mechanical and Power System H. Heetderks 2 AEP Mechanical Design System.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL System Engineer David Curtis, SSL STEIN.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Electrical circuits By Caroline.
1 PFDPU Mechanical Packaging PEER REVIEW MAVEN PFDPU Particle and Fields Data Processing Unit Mechanical Packaging and Design Overview May 09, 2011 Bill.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
TRIO-CINEMA 1 UCB, 2/08/2010 CINEMA Solar Array Design Review Yashraj Khaitan David Glaser Kevin Jenkins Chris Pasma Space Sciences Laboratory University.
Dec
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
CubeSat for Ions, Neutrals, Electrons and Magnetic Fields PI Robert Lin, SSL Project Manager Thomas Immel, SSL Systems Engineer Chris Pasma, SSL Mechanical.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 P. Dizon Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
STEREO IMPACT SEP Critical Design Review 2002-Nov-21/22 TvR1 SEP Mechanical Design Sandy Shuman, GSFC ) Tycho.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
Amy Blas Hawaii Space Flight Laboratory University of Hawaii.
K UMU A ’ O C UBESAT Amy Blas March 7, W HAT IS C UBE S AT ? 10x10x10 centimeter cube Launched in lower earth orbit (LEO) Started last semester.
Micro Arcsecond X-ray Imaging Mission Pathfinder (MAXIM-PF) Mechanical George Roach Dave Peters 17 May 2002 “Technological progress is like an axe in the.
C181 Launch Presentation. CONTENTS 1.Key Features 2.Detailed Specification 3.PCB Layout 4.ESD Industrial Standard 5.Service Tools 6.Disassembly – Assembly.
S A Griffiths CM42 June 2015 Electrical & Control.
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
Electric Circuits.
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
G. Carboni for the Muon Group
सोलर पॅनेलचा उपयोग करुन रीचर्जेबल टॉर्च बनवणे.
GLAST Large Area Telescope:
Structures March 13, 2004.
System Engineering (Pratham and beyond)
Unit 3 OSPF Single Area Chapter 7 Configuring OSPF in a Single Area
BIRDS-4 Computer Aided Drawing (CAD)
Radio Interface Board Status
Presentation transcript:

Status of EPS Battery configuration finalized Solar panel layout –finalized Solar panel Substrate is ready for bonding EM – fabricated and Completed the Testing EM – integrated with OBC and tested FM- Version 1 available for integration with S/C Advanced FM – Design completed, Fabrication in progress. Pending activities Advanced FM –card fabrication in progress EPS Readiness for S/C integration – OCT 2013

1.Solar panel layout and panel bus bar layout drawing for the fabrication (1:1 drawing). 2.Electrical wiring diagram of the solar panels 3.Anodisation of spacecraft structural elements 4.Bonding of solar cells on the spacecraft structural elements (Side and TOP panels), wiring and testing of panels - This will be done by Solar panel division of ISAC 5.Availability of storage box for the panels - Solar cells have to be protected from damage during mechanical integration of the spacecraft and during handling till launch. 6.Fabrication of battery clamp and base plate 7.Finalisation of SNAP switch configuration and routing. – The interface with launch vehicle and type and location of SNAP switch 8. Flight EPS PCB fabrication & checking bare PCB 9.Wiring of EPS PCB 10.EPS card testing. 11.Integration of EPS with S/c (Solar panels and Card) 12.Space level thermal design for the improved EPS configuration Pending Activities – EPS