SLIDE 1 Power Of Choice Metering Competition Pre-Final Rule Determination Workshop #2 24 th September 2015 FINAL.

Slides:



Advertisements
Similar presentations
Summary of Customer Service Rules for Low-Income Electricity Customers Paul Gasparatto Policy Advisor.
Advertisements

SRC Application Process Fall 2014 Version: November 12, 2014.
Project Nexus Workgroup 9 th September Background During detailed design a number of areas have been identified that require clarification with.
1 Exemption AdministrationTraining Related to Accepting Certificates Prepared by the Streamlined Sales Tax Governing Board Audit Committee Prepared January.
PN UNC AMR Topic Workgroup Meeting 19 – Meter Reading.
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
On Target Contractor’s Blueprint Chart Your Course to Business Success On Target Business Intensive: Session 8 November 14, 2013 Advisors On Target 1.
RMSUpdate January 6, 2005 Retail Market Subcommittee Update to TAC.
Lead from the front Texas Nodal 1 Resource Entity Owned Transmission Asset Data Collection Feb 27, 2009 Kick Off Meeting.
TX SET Update to RMS Wednesday, October 10, 2007.
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Shipperless & Unregistered Workgroup Monday 1 st July 2013.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
TAA2 Assessor Workshop Learning and Innovation. PROGRAM OUTLINE Workshop Introduction Overview of the TAA Scheme Outline of the TAA2 Activity Break TAA.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Finance Process Review Committee Meeting November 19, 2009 Bob Hammond Defense Logics Management Standards Office (DLMSO) DLMSO Web Site:
1 RMS TAC Update April 3, Test Plan Flight Dates It is the practice of RMS to approved the dates for future testing flights. This enables new.
LCG CCRC’08 Status WLCG Management Board November 27 th 2007
IGGIGG Industry Governance Group Secretariat: RMDS Secretariat: RMDS 1 IGG Agenda – July 19 th 2007 Minutes from last IGG meeting10.00.
1 SYSTEMS ANALYSIS Pertemuan 7 s.d 12 Matakuliah: A0554/Analisa dan Perancangan Sistem Informasi Akuntansi Tahun: 2006.
RMDSRMDS Retail Market Design Services 1 IGG Agenda – March 8 th 2007 Minutes from last IGG meeting10.00 – Review of Action Items10.10.
RMDSRMDS Retail Market Design Services 1 IGG Agenda – September 21 st 2006 Minutes from last IGG meeting10.00 – Review of Action.
Demand Response Task Force. 2 2 Outline  Overview of ERCOT’s role in the CCET Pilot  Overview of Stakeholder Process – What’s been done to date?  Questions.
RMDSRMDS Retail Market Design Services 1 IGG Agenda – November 1s t 2006 Minutes from last IGG meeting10.00 – Networks AIM Project.
Retail Market Update August 6, Load Profile Guides In accordance with section § (e) (3) and PUCT Project 25516, Load Profiling and Load Research.
Materials and Methods: How to describe what we did Today’s agenda: 1.Discuss the purpose and structure of the Materials and Methods section 2.Examine the.
PN UNC Workgroup Invoicing 24 th October Objectives of the Workgroups To determine detailed business requirements Consider/review comments made.
RMS Update to TAC October 2, RMS Update to TAC TAC Confirmation Vote Request Kyle Patrick of Reliant Energy and Independent Power Marketer segment.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
Retail Market Subcommittee Update to TAC March 4, 2004.
Oncor Electric Delivery Project No – TDU Advanced Metering Prepaid Project Revised January 23, based on market input received at January.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
1 Customer Objections in Complete Status (CCO Clean-up Phase 3) Background Next Steps.
Modification Proposal 0435: Arrangements to better secure firm gas supplies for GB customers Initial Workgroup discussion 1 November 2012.
SLIDE 1 POC PROCEDURES WORKING GROUP (POC-PWG) 14 January 2016.
Data Pipeline Town Hall February 26, 2015 The goal of the webinar is to provide updates on the Data Pipeline and current and upcoming collections. These.
SLIDE 1 POC PROCEDURES WORKING GROUP (POC-PWG) 11 March 2016.
Retail Market Update November 6, Flight Time Lines Retail market has several market occurring in the second quarter Flight 0304, GISB.
Power of Choice (PoC) Program Overview
Direct Participation Enrollment Process for 2017 DRAM
B2B Working Group Workshop
Power of choice – embedded networks information session
COMET Working Group Progress Report 11/13/03
GC0104 – Demand Connection Code (DCC)
Sample Fit-Gap Kick-off
B2B Working Group Workshop
B2B Working Group 30 November, 2016
IGG Agenda – April 19th 2007 Minutes from last IGG meeting – 10.10
DOM Integration Meeting D. Vivolo - DOM Integration Meeting
POC Procedures Working Group (POC-pWG)
ESB Networks AIP Programme
POC Procedures Working Group (POC-PWG) Work package 3 (As Built)
Harmonisation Working Group
T-D Interface Working Group November 2, 2017 Energy Storage and Distributed Energy Resources Phase 3 (“ESDER 3”) UPDATE Jill Powers.
5MS Joint Metering/Systems Focus Group
EXECUTIVE forum DATE: 27 MARCH 2017 TIME: 2.00 PM – 3.30 PM (AEDT)
IGG Agenda – August 10th 2006 Minutes from last IGG meeting – 10.15
Harmonisation Working Group
Approach to Market Cutover - Draft for Discussion
Theft on Shipper-less Sites
UNC Mod 392/ IGT Mod 040 Proposal to amend Annex A of the CSEP NExA table, by replacing the current version of the AQ table August 2011.
UNC Modification Proposal 0172 National Grid Distribution
PN UNC AMR Topic Workgroup Meeting 14 – Meter Reading
Working Party on General Safety Provisions (GRSG) General information
ESB Networks AIP Programme Meeting of the IGG, November 1st 2006
Retail Energy Code - Data Access Schedule
Title Goes Here Organization CEOS Plenary 2016 Agenda Item #
Presentation transcript:

SLIDE 1 Power Of Choice Metering Competition Pre-Final Rule Determination Workshop #2 24 th September 2015 FINAL

SLIDE 2 Power of Choice – Metering Competition AGENDA 1.10:00-10:05 Attendance and apologies 2.10:05-10:10 Confirm agenda 3.10:10-10:15 Purpose of meeting 4.10:15-10:30 Supporting materials – Issues Log 5.10:30-11:30 Supporting materials - Role Mapping 6.11:30-12:30 Supporting materials - Process flows for services 7.12:30-1:00Lunch break 8.1:00-2:00 Supporting materials - Process flows for services 9.2:00-3:00 Service level procedures: Meter Data Provider Services 10.3:00-3:30 Metrology Procedure: Part B 11.3:30-3:45 MDFF 12.3:45-4:00 Next steps & Close meeting TimeAgenda Item

SLIDE 3 Power of Choice – Metering Competition 3. PURPOSE OF MEETING Objective of the 2 nd workshop o Ongoing review the first set of papers developed as part of the early preparation and drafting being done prior to receipt of the Final Determination for the Metering Competition Rule change o Items for discussion today are:  Issues Log  Role mapping  High level process flows for services  Review of change marked: Service level procedures: Meter Data Provider Services Metrology Procedure: Part B MDFF Power of Choice – Metering Competition

SLIDE 4 Power of Choice – Metering Competition 4. ROLE MAPPING Role Appointments & Commercial Agreements o Updated diagrams o Clarifications : “Another person”, “Appoint”, order of priority, “large customer” o Practical scenarios – Role changes Appointment requirements for distribution connection points o Updated diagrams o Clarifications o Practical scenarios – VIC AMI Meters, Type 5/6 Meters

SLIDE 5 Power of Choice – Metering Competition TRANSACTION MODEL Current transaction model presented Suggestions for alternate models captured Process mapping to help determine efficient approach prior to final determination.

SLIDE 6 Power of Choice – Metering Competition REMAINING QUESTIONS/FEEDBACK Can an obligation on the MC under rule be passed on to a service provider? At some point we need to consider what will happen when the DB undertakes a site visit for a faulty type 5/6 meter. It is unlikely that the MC will have sufficient afterhours people on call (who can reach each site) - customers cannot be left off supply (e.g. especially life support, sensitive load etc.) – so what will happen? Diagram 3 should recognise billing process between MC and the DNSP/Other Authorised Parties for services

SLIDE 7 Power of Choice – Metering Competition 7. PROCESS FLOWS FOR SERVICES Business process maps for the following services have been updated based on the participant feedback collected during and after the previous workshop: o New Connections (Not NSW) o New Connections (NSW) o Manual Re-energisation and De-energisation o Remote Reconnection and Disconnection This is only a draft version of the process maps to stimulate discussion in the workshop to be able to identify changes to roles and retail market business processes as a consequence of the MC rule change. Other business process maps will be updated and developed for discussion in the upcoming workshops (i.e. Abolishment, Meter Change, etc.) Power of Choice – Metering Competition

SLIDE 8 6. LUNCH BREAK

SLIDE 9 Power of Choice – Metering Competition SERVICE LEVEL PROCEDURE MDP Review analysis on: o Exemption requirements o Reversion of meters type 4A to type 4

SLIDE 10 Power of Choice – Metering Competition 9. METROLOGY PROCEDURE: PART B Discuss issues raised by participants in the previous workshop as the following: o Consider if registration, substitution and validation provisions for current type 4 is still valid for mass market type 4 o Clarify issue with sample meter requirements Power of Choice – Metering Competition

SLIDE 11 Power of Choice – Metering Competition 10. MDFF Summary of changes on MDFF file: o Section – section title changed. o Section NMI data details record (200) – change in “Definition” column for RegisterID field. Field is required for type 4A and type 5 meters. o Section B2B details record (500) – change in “Definition” column for IndexRead field. Field is required for small customers with type 4A, 4 or 5 metering installations. Power of Choice – Metering Competition

SLIDE 12 Power of Choice – Metering Competition 10. NEXT STEPS Additional workshops are being planned in the months of October and November this year. The proposed dates of those workshops are as follows: o 22 October o 26 November DISCUSSION ITEM - Scope and agenda for subsequent workshops to be discussed Power of Choice – Metering Competition