TC meeting P2 planning wks 3&4 A.Tauro 17-1-2012.

Slides:



Advertisements
Similar presentations
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
Advertisements

MOM Summary 19/01/10 Water Now the ice has cleared I am able to get on the roof again. Could do with getting the conductivity readings fed back similarly.
LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
Antiproton Lens Replacement (Unfortunately Part 2) Keith Gollwitzer Antiproton Source Department for the Experts and Mechanical Support Department Target.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
TC meeting P2 planning wks 7&8 A.Tauro
Dimuon Forward Spectrometer May 2008 Cosmic Run Day by Day report Interesting runs.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
DCS - general Unscheduled power cut Wed. morning ( , human error) –DCS (and HLT) off, due to UPS on bypass –In the middle of DB migration, had.
winter shutdown preparatory meeting A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D. J.Pothier CERN EP/CMIC.Schäfer CERN EP/L3D SAFETY J.Pothier (GLIMOS) C.Schäfer (deputy GLIMOS) DISMANTLING.
winter shutdown planning A.Tauro
LS1 reference slides LS1 plans Detector’s plans Services and central systems availability 8/2/13LS1 planning meeting - A.Tauro1.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
ALICE 5 o’clock meeting Wk 49
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.
TS4 preparatory meeting TS4 – weeks Underground access possible in week 51 – as from Monday morning 9:30 –Ulli and Philippe will start.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
winter shutdown preparatory meeting A.Tauro /12/11ALICE winter shutdown schedule - A.Tauro 1.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
DSS  Informal review Tuesday 24 th October 10:00 Room , organized by Laurent Roy.  Subsystems will not be allowed to run overnight or at weekends.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
ALICE TC meeting – Plans for the next technical stop A. Tauro.
André Augustinus 9 October 2006 Interlocks update.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
winter shutdown planning A.Tauro
winter shutdown planning A.Tauro
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
ALICE planning meeting /2/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
TC meeting P2 planning wks 9&10 A.Tauro
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
ALICE 5 o’clock meeting Wk 49. INDICO You’ll find this meeting here: – The full shutdown planning.
winter shutdown planning A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
ALICE 5 o’clock meeting Wk 49
TC meeting P2 planning wks 5&6 A.Tauro
TS2 preparatory meeting A.Tauro. General information LHC- TS2: from Monday 31st 6am, to Friday 4th 5pm LHC beam stops on Monday morning.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
TS3 preparatory meeting 14/9/2012 TS3: 17-21/
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
TS3 preparatory meeting A.Tauro. General information LHC-TS3: from Mon 9 6am, to Fri 13 5pm LHC beam stops on Mon morning at 6:00.
ALICE planning meeting /11/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
DCal-ALICE integration and installation plan and status A. Tauro.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
1 04 April 2007 L. Roy Detector Safety System for infrastructure - General fire detection (barracks, cavern) - Sniffer system (smoke detection above the.
ALICE Installation: Planning Meeting Agenda: 1- ALICE shutdown schedule 2- Miniframe removal sequence.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
ALICE 5 o’clock meeting Wk 51.
ALICE planning meeting
TS2 preparatory meeting
LS1 planning meeting - A.Tauro
LS1 planning meeting
ALICE 5 o’clock meeting Wk
TS1 preparatory meeting
ALICE TC meeting – Plans for the next technical stop
Fiber Installation for RUN 3&4
ALICE 5 o’clock meeting Wk
November technical stop activities:
Sun Mon Tue Wed Thu Fri Sat
Sun Mon Tue Wed Thu Fri Sat
Sun Mon Tue Wed Thu Fri Sat
Presentation transcript:

TC meeting P2 planning wks 3&4 A.Tauro

Planning wk3 1/2 EMCal installation –Monday 16/1 PM: travel to CERN – /1: modification new nose in SXL2 + cavern preparation (insertion SM into rotator if possible) –Friday 20/1 PM: travel to Nantes TPC capacitors TOF: repair 3 HV connectors Move PMD to parking position (Thu 19 th ) Muon TRG: check on RPC (MTR21-OUT) for gas tightness Muon TRK: repair bus bars on slats: ST4, ST5 and ST3 T0: –Investigation of the problem with laser system (rack 018,019) –Upgrade of electronics and check of spare modules (rack 018,019) 17/1/122

Planning wk3 2/2 GS-ASE: –Jan 18 th : connect the redundant power to CSAM and evacuation. No access UX25 cavern from 7:00 AM to 8:00 AM –Jan. 20 th : test fire detection EN-CV-DC: maintenance TOF-PHOS-EMC-SPD and TPC cooling plants EN-CV: –Restart chilled water CRs –Maintenance L3 extraction unit. Test of alarms –Maintenance ventilation unit SG2 (Mon-Tue)  will cut Ar/H2 EN-EL: –Wed 18 th Jan: maintenance power transformers: Will cut EXD1/2X for 3h  cut power to CRs (normal network) Will cut ITS ventilator and HMPID rack in CR5 –Test AUG P2: Fri Jan 20 th – No access UX25 Major electrical perturbation affecting P2 for whole day 17/1/123

Planning wk4 EMCal installation –Monday 23/1 PM: travel to CERN – /1: insertion –Friday 27/1 PM: travel to Nantes TPC capacitors PMD maintenance Remove SPD&SSD boxes PP1 –Mon 23/1 AM: disconnect and displace SPD box –Mon 23/1 PM: disconnect and displace SSD box –Tue-Fri: TPC A-11/12 (4 days) –Sat: put back and test SSD box Muon TRK: –Repair bus bars on slats: ST4, ST5 and ST3 –Change one quadrant in ST2 (3 Right Bottom) Survey MTG GS-ASE: Jan. 26 th : test fire detection EN-CV-DC: maintenance HMPID and TPC-RR cooling plants EN-CV: –Repair leak FB pipe (23 rd Jan) –Replacement CR3 racks and removal air conditioning CR /1/12TC meeting - A.Tauro4

DAQ restart Different service levels identified: –Level 0: no activities –Level 1: LDCs only, no runs –Level 2: DCA only, no recording/migration –Level 3: PCA and/or DCA, no recording/migration –Level 4: PCA and/or DCA, recording/migration Plan for the restart: –Until Tue 17 Jan: minimum services (level 1 or - if requested - level 2), ECS/DAQ HW/system upgrade in progress –Tue 17 16:00 or Wed 18 Jan 8:30: power off LDCs –Wed 18 Jan: maintenance power transformer –Wed 18 Jan late afternoon (if requested) or Thu 19 8:30: restart minimum services –Thu 19 Jan: expect CTP back on –Thu 19 16:00: power off ACR/WRs/CR1 –Fri 20 Jan: AUG –Fri 20 Jan late afternoon (if requested) or Mon 23 8:30: power on ACR/WRs/CR1 –Mon 23 8:30: power on, all services back in production 12/1/12Shutdown progress and planning A.Tauro 5 Roberto

New DCS cluster The 'old' DCS cluster has been fully upgraded and patched, detectors are invited to test functionality (several already did, and no major issues were reported) The 'new' DCS cluster is from 75% physically installed and currently being cabled with power and network. First machines shall be available for detectors for migration by the end of the week 12/1/12Shutdown progress and planning A.Tauro 6 Andre’

CTP CTP crates are off till Thursday morning. If urgently needed, we will switch them on (just call Anton on ) 12/1/12Shutdown progress and planning A.Tauro 7