© 2016 Electric Power Research Institute, Inc. All rights reserved. Aidan Tuohy EPRI Grid Ops and Planning Iowa State University.

Slides:



Advertisements
Similar presentations
1 Demand-Side Management Influence on Reliability NERC Demand-Side Management Task Force (DSMTF) Rick Voytas, Chair November 2007 Presented To The U.S.
Advertisements

Transparent, Repeatable, Defendable, and Published Generation, Transmission & Nat Gas Network Co-Optimizations
Operating Reserves Task Force
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
Aidan Tuohy Sr. Project Engineer NWPCC Flexibility Metric Roundtable April 2013 Metrics and Methods to Assess Power System Flexibility.
PV Market Trends and Technical Details. All of US has Suitable Solar Resource for Large Scale PV Deployment.
Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
A Summary on Probabilistic Workshop held on September 9, 2014 Milorad Papic (RAWG Chair) Salt Lake City, January 13, 2015.
05/14/2014 Flexibility Methods Workgroup. 2 © 2014 Electric Power Research Institute, Inc. All rights reserved. Overview/Agenda Discussion of Literature.
Secure System Scheduling with High Wind Penetrations J. Kennedy March 2009.
1 SEEEI International – Electricity 2012: “Effects of volatile RES on Power Systems” Israel – Eilat 14 November 2012 Effects of volatile RES on Power Systems.
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
Electric Power Infrastructure: Status and Challenges for the Future Mark Lauby Director, Reliability Assessments and Performance Analysis.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
The impacts of hourly variations of large scale wind power production in the Nordic countries on the system regulation needs Hannele Holttinen.
ERCOT Public 1 AS Demand Curves for Real-Time Co-optimization of Energy & Ancillary Services.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Lynn Coles, PE National Wind Technology Center National Renewable Energy Laboratory Golden, Colorado USA 10 FAQ’s (Frequently Asked Questions) About Wind.
ERCOT PUBLIC 4/21/ Loss of Load Probability Assessment for NERC April, 2015.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
NASUCA Meeting Integration of Intermittent Renewable Resources Panel Michael McMullen MISO June 10, 2013.
Julia Matevosyan, Resource Adequacy January, 2014 Application of KERMIT in the DOE LTS process.
Western Wind Integration Study Debbie Lew NREL. Goal To support multi-state interests in understanding the operating and cost impacts due to the variability.
RELIABILITY and RENEWABLES: Two Case Studies Using the SuperOPF Tim Mount Department of Applied Economics and Management Cornell University
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
Black Sea Regional Transmission Planning Project By Predrag Mikša EKC - Electricity Coordinating Center Istanbul, March 2011.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Power Plant BI POWER GENERATION Evolution of Plant Ownership From Regulated Era Regulated Utility Monopolies To “Partially” Deregulated Era Independent.
Sixth Northwest Conservation & Electric Power Plan Adding Incremental Flexibility to the Pacific Northwest Power System? Maury Galbraith Northwest Power.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 2009 Draft Resource Program Released: September 30, 2009 Accepting Comments until: November 30,
ENERGY CENTER State Utility Forecasting Group (SUFG) Alternative Resources and Energy Capacity Presented by: Douglas J. Gotham Purdue University Presented.
Enhancing Reliability of the North American Transmission Grid Enhancing Reliability of the North American Transmission Grid Presented By Dejan J Sobajic.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
1 Open University Integrating Renewables Conference 24 January 2006 Wind power on the grid… What happens when the wind stops blowing? David Milborrow
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
John Norden, Manager, Renewable Resource Integration ISO New England Inc NASUCA Mid-Year Meeting June 30, 2009 Roadmap to Renewable Integration in.
ISO Proposed Flexible Capacity Requirements Stephen Keehn Senior Advisor California ISO CPUC Workshop January 26, 2012.
IRP Review  IRPs with Significant Detail on Flexibility Assessment  Portland General Electric  Puget Sound Energy  Other IRPs.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
Long Term Study Transmission Results May 21 st, 2013.
January 14, 2016 PacifiCorp-CAISO-NVE EIM Initiative Overview.
Recent TSO report on changes because of larger amounts of renewable enery IEA Task 25, January 14, 2016 Edf – Clamart – Paris – France Lennart Söder Professor.
Smart Grid Vision: Vision for a Holistic Power Supply and Delivery Chain Stephen Lee Senior Technical Executive Power Delivery & Utilization November 2008.
Understanding Value of Short-Duration Resources CPUC RA Workshop March 5, 2016.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
© 2016 Electric Power Research Institute, Inc. All rights reserved. Salvador A. Casente, Jr. Vice President, General Counsel, Chief Compliance Officer.
Estimating the resource adequacy value of demand response in the German electricity market Hamid Aghaie Research Scientist in Energy Economics, AIT Austrian.
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
Contents Introduction Focus area Wind scenarios
Erik Ela, Eamonn Lannoye, Bob Entriken, Aidan Tuohy
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
GENESYS Redevelopment Strawman Proposal
Overview of New Control Room Desk
penetration of wind power
Additional clarifications on economic and adequacy running hours
2013 Long-Term Reliability Assessment and Other Key Assessment Initiatives Briefing.
30 Minute Reserves EPFSTF January 4,
Impact of Wind Farms Aggregation on Large System Scheduling Cost Under Frequency Linked Deviation Settlement Mechanism Presented by Anoop Singh Authored.
RE Grid Integration Study with India
Forecasting and Operations CAISO Case
DECISION
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

© 2016 Electric Power Research Institute, Inc. All rights reserved. Aidan Tuohy EPRI Grid Ops and Planning Iowa State University Seminar March 21, 2016 Power System Flexibility Assessment InFLEXion flexibility assessment tool

2 © 2016 Electric Power Research Institute, Inc. All rights reserved. Overview  Introduction and Background  EPRI Multi-Level Flexibility Assessment Approach  Flexibility Requirements  Flexibility Adequacy Metrics  Conclusions

3 © 2016 Electric Power Research Institute, Inc. All rights reserved. Background

4 © 2016 Electric Power Research Institute, Inc. All rights reserved. Impact of Variable Generation: Increased Variability Increased requirement for downward ramping capability in the morning More upward ramping capability is required when sun goes down Need lower minimum generation levels to avoid over-generation Source: ENEL

5 © 2016 Electric Power Research Institute, Inc. All rights reserved. Impacts of Variable Generation: Increased Uncertainty Source: Pierre Pinson, DTU, Denmark Example Wind Power Forecast Increased Operational Uncertainty Requires Capability to Respond to Unexpected Changes in Net Load

6 © 2016 Electric Power Research Institute, Inc. All rights reserved. When do we need flexibility? Source: V. Silva, EdF R&D Need ramping capability for variability and uncertainty over multiple time periods Both physical and institutional sources of flexibility are important

7 © 2016 Electric Power Research Institute, Inc. All rights reserved. Planning Issue Operational Issue Reliability Economic Consequences of Insufficient Flexibility RES CurtailmentHigh reserve pricesHigh cost energyEnergy and Reserve Scarcity Reserve shortages Over-generation Under-generation Area Control Error (ACE)Frequency deviationLoad sheddingGenerator disconnection

8 © 2016 Electric Power Research Institute, Inc. All rights reserved. Options to provide flexibility Generation Flexibility Demand Response Transmission & Distribution Energy Storage

9 © 2016 Electric Power Research Institute, Inc. All rights reserved. Multi-Level Flexibility Assessment

10 © 2016 Electric Power Research Institute, Inc. All rights reserved. EPRI Flexible System Planning R&D Flexibility Assessment Software Tool Flexibility metricsFlexibility metrics Screening analysisScreening analysis Detailed flexibility evaluationDetailed flexibility evaluation Resource and Transmission Flexibility Resource adequacy: variability/uncertainty & operation methodsResource adequacy: variability/uncertainty & operation methods Transmission impact on flexibilityTransmission impact on flexibility Utility/ISO Flexibility Case Studies Insights as to time horizons concernsInsights as to time horizons concerns Order of magnitude of possible riskOrder of magnitude of possible risk

11 © 2016 Electric Power Research Institute, Inc. All rights reserved. Flexibility Metrics for system planning  Multi-Level Approach –Levels 1 and 2  screening Levels 3 and 4  detailed metrics  Three detailed metrics: –Periods of Flexibility Deficit –Expected Unserved Ramping –Insufficient Ramping Resource Expectation  Post processed metrics based on simulation or historical data  White paper available on epri.com Level 1 Variability Analysis & Flexibility Requirement Level2 Resource Flexibility Calculation Level 3 System Flexibility Metrics Level 4 Transmission and Fuel Constrained Flexibility

12 © 2016 Electric Power Research Institute, Inc. All rights reserved. Inflexion Screen Shot

13 © 2016 Electric Power Research Institute, Inc. All rights reserved. Example Flexibility Assessment Study – Southwest Power Pool (SPP) Wind Integration Study  Recently completed study for SPP –Part of larger wind integration study –Other parts covering thermal and voltage issues –Ramping analysis performed by EPRI  Uses historical analysis to understand ramping issues –How much does wind increase ramping? –How much ramping was available? –Baselines for future years  not expecting flexibility issues for 2014/15 period studied –Simulations of future years are also possible  Installed wind during study period increased from 7.3 GW to 8.6 GW (now over 12 GW) –Used actual dispatches, including some wind that was dispatched down as part of Dispatchable Variable Intermittent Resource (DVER) study –5-minute and hourly resolution market data for 1 year Provides example results for use of metrics and tool

14 © 2016 Electric Power Research Institute, Inc. All rights reserved. Flexibility Requirements

15 © 2016 Electric Power Research Institute, Inc. All rights reserved. Unit 1Unit 2 Level 1 - Flexibility Requirements Concept: Time Horizons  Ramping occurs at a variety of time scales  Magnitude and speed of ramping different in different time scales  Resources can respond differently in different time horizons Concept: Direction  Upward ramps and downward ramps tend to occur during certain periods  Resources ability to provide upward flexibility differs to its downward flexibility contribution Aim: Understand how much flexibility is required and when it is needed. Fast Variability Slower Variability Min. Gen Capacity Up Flexibility Down Flexibility

16 © 2016 Electric Power Research Institute, Inc. All rights reserved. -Helps to understand cycling requirements -Identifies changes needed to operating practices Level 1 – Flexibility Needs Variability Needs Predictable ramping needs Uncertainty Needs Forecast error induced ramping needs Timing of Requirements Seasonality Diurnal nature -Using historical production data -Useful in planning horizon to characterize needs in: short horizons ( 5 hours) -Using historical forecast error data -Useful for identifying the need for operational flexibility for time horizons between 5 minutes and 36 hours

17 © 2016 Electric Power Research Institute, Inc. All rights reserved. Maximum Inter-Hour Variability over different time horizons Values are Ramp over given time period, starting from every hour in 8760 dataset

18 © 2016 Electric Power Research Institute, Inc. All rights reserved. Within-Hour Ramps as Function of Time Horizon Wind does increase ramping within hour also- by 5%-10% of installed capacity

19 © 2016 Electric Power Research Institute, Inc. All rights reserved. Differences between inter- and within-hour analysis results, due to data used More granular data used to study within-hour ramps compared to day ahead look in previous results – more ramping is expected

20 © 2016 Electric Power Research Institute, Inc. All rights reserved. Curtailment – Impact on Wind Ramping DVER can reduce wind ramp sizes, especially at very short intervals

21 © 2016 Electric Power Research Institute, Inc. All rights reserved. Curtailment – Impact on Net Load Ramping DVER reduces net load variability, particularly down ramps

22 © 2016 Electric Power Research Institute, Inc. All rights reserved. Seasonal Maximum 1-hour Wind Variability Generally wind showed more variability in winter But impact on net load was greater in summer for short time horizons (<3 hr)

23 © 2016 Electric Power Research Institute, Inc. All rights reserved. Largest 1-hour Wind Down Ramps by Hour of Day and Month Largest ramps in morning, particularly during winter and spring

24 © 2016 Electric Power Research Institute, Inc. All rights reserved. Impact of wind on largest 1-hour ramps by time of day and month Wind Increases Ramping in Some Hours, Decreases In Others

25 © 2016 Electric Power Research Institute, Inc. All rights reserved. 1-hour Wind Ramping as Function of Output – Maximum and 95 th percentile

26 © 2016 Electric Power Research Institute, Inc. All rights reserved. Inter-Hour Ramping Mileage More general ramping behavior in hourly ramps when wind is added Approx 10% more ramping mileage when wind is 12.2% of installed capacity

27 © 2016 Electric Power Research Institute, Inc. All rights reserved. Flexibility Adequacy

28 © 2016 Electric Power Research Institute, Inc. All rights reserved. Level 2 – Flexible Resources Online Flexibility  Flexibility limited by –Production level –Ramp rate (MW/Min) –Capacity (MW) –Minimum generation level (MW) –Minimum up time (hours)  Understanding the online flexibility available to the system will give an initial estimate of the overall flexibility of the system’s resources. Offline Flexibility  Flexibility limited by –Start up time (Hours) –Minimum down time (hours) –Run up rate (MW/Min) –Outages and availability  Understanding the contribution of cycling resources to ramping needs is critical to managing longer time horizon ramps. Aim: Understand how much flexibility is available from system resources Battery HVDC Hydro Recip. Gas CT Gas CCGT Coal Nuclear Increasing Speed Increasing Quantity

29 © 2016 Electric Power Research Institute, Inc. All rights reserved. Available upwards 1-hour Flexibility by hour Calculated based on actual dispatch – more than 8 GW ramp in most hours

30 © 2016 Electric Power Research Institute, Inc. All rights reserved. Level 3 - System Flexibility Assessment Operations Ex-Post Analysis NERC Standards Control Performance Standards (CPS2) Balancing Authority ACE Limit (BAAL) Price spike magnitude and frequency Load shedding incidents Ex-Ante Analysis Early stage development Ramp Forecasting Reserve price offers Planning Reliability Analysis EPRI Flexibility Metrics LOLE with Commitment & Dispatch Monte Carlo scheduling and analysis Generation Expansion Early stage development Probabilistic expansion planning

31 © 2016 Electric Power Research Institute, Inc. All rights reserved. Flexibility Available and Net Flexibility Duration Curves Sorted data from high to low ramping requirements, then subtracted actual or potential needs – always more than enough 1-hour ramping

32 © 2016 Electric Power Research Institute, Inc. All rights reserved. Level 3 - System Flexibility Assessment – EPRI Metrics Periods of Flexibility Deficit Number of periods when the system has insufficient ramping capability to manage the expected ramping of the system’s net load By: direction, time horizon and ramp percentile Expected Ramping Unserved Total shortage of flexibility when the system has insufficient ramping capability to manage the expected ramping of the system’s net load measured in MW By: direction, time horizon and ramp percentile Time Horizon

33 © 2016 Electric Power Research Institute, Inc. All rights reserved. Periods of Flexibility Deficit Longer time horizons may require redispatch/recommitment, particularly downwards load ramping which can be managed with DVER

34 © 2016 Electric Power Research Institute, Inc. All rights reserved. Insufficient Ramp Resource Expectation Probabilistically, very little problems with upwards ramping but need to think about dispatching wind down relatively often

35 © 2016 Electric Power Research Institute, Inc. All rights reserved. Summary and Conclusions

36 © 2016 Electric Power Research Institute, Inc. All rights reserved. Summary  Increasing VG penetration is impacting system operations and may need to be considered in planning  Flexibility is needed to manage net load variability  Planning time frame methods and tools available –Flexibility requirements –Resource flexibility –System flexibility assessment  Can be integrated into existing and evolving planning processes –Production Cost Tools for Simulating Operation –EPRI InFLEXion metrics to post-process historical or simulated data

37 © 2016 Electric Power Research Institute, Inc. All rights reserved. Current R&D in the area of flexibility assessment  ‘Deliverability’ of flexibility –Developing and testing a number of methods for how flexibility is deployed through the network –A number of methods were developed and are being tested on realistic systems (likely ERCOT) –Aim is to understand how existing and new transmission can be used to provide flexibility  Resource Adequacy and Resource Expansion –Understand how resource adequacy metrics such as Loss of Load Expectation can consider flexibility –Investigate how standards such as Planning Reserve Margin can be adjusted to consider flexibility –Examine if and how resource expansion tools should consider flexibility metrics  Demonstration of InFLEXion and development of guidelines –Projects to demonstrate the metrics, with vertically integrated utilities and ISOs, and improvements to InFLEXion through working with multiple end users –Improving data handling capabilities and user interface of InFLEXion and vendor engagement to transfer technology (long term plan is to get metrics into vendor tools) –Guidelines for flexibility assessment for utility/ISO planners based on experience to date

38 © 2016 Electric Power Research Institute, Inc. All rights reserved. Together…Shaping the Future of Electricity

39 © 2016 Electric Power Research Institute, Inc. All rights reserved. Appendix/Additional Materials

40 © 2016 Electric Power Research Institute, Inc. All rights reserved. Hosting Capacity Energy Thermal Capacity Distribution System Bulk System Customer or Owner Cost/Benefits Societal Costs/Benefit s Benefit/Cost Core Assumptions Adoption/ Deployment Scenarios Market Conditions Resource Adequacy Flexibility Operational Practices & Simulation Transmission Performance Transmission Expansion System Net Costs System Benefits Reliability Integrated Grid: Benefit Cost Framework

41 © 2016 Electric Power Research Institute, Inc. All rights reserved. Integrated Grid: Bulk System Analysis 1 RESOURCE ADEQUCY 2 FLEXIBILITY 3 OPERATIONAL SIMULATION 4 TRANSMISSION PERFORMANCE 5 TRANSMISSION EXPANSION

42 © 2016 Electric Power Research Institute, Inc. All rights reserved. Flexibility Considerations & Metrics  Many Regions (Regulators + ISO+ Utilities) Considering Future Flexibility Needs Now –Planning and Operations time frame  Other systems experiencing similar needs (Renewables and/or Retirements) –Germany, Spain, New York, Hawaii etc.  New flexible resources now becoming deployable in the bulk system California Flexible Resource Adequacy Flexi-Ramp Market Product Long Term Procurement Plan Ireland Long Term Flexibility Incentives Oregon Integrated Resource Planning Process MISO Market Rule Changes to Incentivize Flexibility

43 © 2016 Electric Power Research Institute, Inc. All rights reserved. Industry Activities and Coordination – Flexibility Assessment  CES-21 flexibility metrics project (PG&E, SDG&E and others)  Northwest Power and Conservation Council 2014/2015 flexibility study  NERC Essential Reliability Services Task Force – Ramping  SPP Wind Integration Study – Ramping Task  Many others….