(25 AUG 2015 – 6 OCT 2015). UTC(NIST) 1PPS UTC(NIST) 5MHz NIST receiver NB02 receiver 5MHz distribution amplifier 5MHz fiber link 1PPS Generator 1PPS.

Slides:



Advertisements
Similar presentations
A typical case of SD structure at high spin in 194Hg! sig_tot = 1barn Atarget = 186, thikness = 0.5mg/cm 2 beam intensity = 5pnA, N = which.
Advertisements

Traffic and routing. Network Queueing Model Packets are buffered in egress queues waiting for serialization on line Link capacity is C bps Average packet.
01/11/2002SNS Software Final Design Review1 V123S Event Link Encoder, Transmission System and PLL Receiver Thomas M. Kerner (BNL) SNS Global Controls.
GPSDO and Ruggedized Timing Products
April 30, 2014CLBv2, Vidyo Peter Jansweijer Nikhef Amsterdam Electronics- Technology KM3NeT CLBv2 1.
Pattern Generator Versatile Measuring Equipment Bit to bit customized signals, PRBS, PWM, specifics,... Digital Pulse Delay Generator 16 outputs TTL,
1 Loran Timing ILA – 36 th Convention and Technical Symposium Orlando, Fl., Oct Arthur Helwig Gerard Offermans Christian Farrow.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 3/15/2012OVSA Preliminary Design Review Meeting.
Dale E. Gary Professor, Physics, Center for Solar-Terrestrial Research New Jersey Institute of Technology 1 11/7/2011OVSA Technical Design Meeting.
1 Random Number Generator Dmitriy Solmonov W1-1 David Levitt W1-2 Jesse Guss W1-3 Sirisha Pillalamarri W1-4 Matt Russo W1-5 Design Manager – Thiago Hersan.
Status of the Optical Multiplexer Board 9U Prototype This poster presents the architecture and the status of the Optical Multiplexer Board (OMB) 9U for.
Empirical Bayes Estimate Spring Empirical Bayes Model For the EB method, a different weight is assigned to the prior distribution and standard estimate.
22-s02 27-s02 25-s04 20-s03 20-s06,7 28-s01 20-s04 22-s01 27-s01 20-s05.
Diurnal of Transatlantic TWSTFT The diurnal worsened with the chip-rate and bandwidth reductions using the T-11N satellite –2.5 MChip/s codes with 3.7.
WP06_AntennaIF. WP06_AntennaIF 3 principal modules switch amplifier (= ATA ‘PAM’) –includes attenuators (0-60 dB), power detector, and bias tee for the.
Updates on RF synchronization and fast trigger distribution A. Butterworth, H. Damerau, W. Hofle Acknowledgements: T. Bohl, S. Doebert, I. Kozsar, J. Molendijk,
International Comparisons of Network Time Protocol Servers Michael A. Lombardi, NIST, USA, Judah Levine, NIST, USA J. Mauricio Lopez.
1PPS Timing and Reference Distribution Subsystem Wes Grammer NRAO March 15-17, 2012EOVSA Preliminary Design Review1.
CNS Systems, Inc. Communication, Navigation and Surveillance © 2002 CNS Systems, Inc. GPS Receiver Test Bed at USNO Prepared for the 34th Annual Precise.
TRANSMISSION MEDIA’S BY KULA.
Jader Monari1 BEST receivers 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Jader Monari IRA -INAF- Bologna –Italy-
Characterization of Silicon Photomultipliers for beam loss monitors Lee Liverpool University weekly meeting.
September 22, 2005 ESF Workshop-Perugia 1 Virgo Control Electronic upgrade Annecy/Pisa/EGO B.Mours.
P. Denes Page 1 FPPA-Clock Clocks FPPA From CTRL To all FPPA ADC Clocks are received by CTRL chip and distributed as PECL signals to the FPPAs (in.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
JCOMM Observation Programmes Support Centre – Argo Information Centre January 2015 Argo Status Argo TC, M. Belbeoch.
Micro-Research Finland Oy Timing System with Two-Way Signaling cRIO-EVR Jukka Pietarinen EPICS Meeting Padova October 2008.
1 William Stallings Data and Computer Communications 7 th Edition Chapter 8 Multiplexing.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
Release 1415 PAN Enhancement Overview June 24, 2002.
Fast Zero Power File Number Here ®. ® Traditional CPLDs  CPLDs migrated from Bipolar to CMOS — Easier platform to design upon — Lower.
Fiber Laser for ERL Zach Ulibarri Mentor: Zhi Zhao.
J. Mauricio Lopez R. 1, Michael A. Lombardi 2, N. Diaz-Mu ñ oz 1 and Eduardo de Carlos Lopez 1 1 Centro Nacional de Metrología (CENAM), Querétaro, Mexico.
Distributing UTC(NIST) to Industrial Time and Frequency Users Michael Lombardi NIST Time and Frequency Division Distributing UTC(NIST) to Industrial Time.
Why we need adjustable delay? The v1495 mezzanine card (A395A) have a signal transmission time about 6ns. But we need all the signals go into the look.
CASPER Packetised correlators Jason Manley CASPER workshop 2009.
1 Timing with loran Judah Levine Time and Frequency Division NIST/Boulder (303)
SPD Control Board 16th February SPD Control Board (VFE control and SPD multiplicity) VFE’s control (I2C communication: SDA,SCL; clock; reset/trigger.
Tools for Discovery CAEN solutions for Diamond Detectors June 24 th 2011, Viareggio Giuliano Mini.
Test of E906 PreAmp Prototype Da-Shung Su, Su-Yin Wang, Ting-Hua Chang, Wen-Chen Chang 2010/01/28.
S.Montebugnoli BEST 4 th SKADS Workshop, Lisbon, 2-3 October 2008 Stelio Montebugnoli IRA -INAF- Bologna –Italy- SKADS 4th -Lisbon- Oct 2-3, 2008.
W. Hofle LIU-SPS Meeting SPS BA2 Damper LS1 Progress and plans reported by W. Hofle LIU-SPS Meeting G. Kotzian T. Levens D. Valuch.
1 A.Tsirigotus Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch The NESTOR O.M.
OptoPIC Ultrafast Gated Camera. OptoPIC Features ● MHz Rep. Rate ● 200 ps – 1 ns Gating ● Single-Photon Sensitivity ● Integrated Delay Generator.
TDC in ACTEL FPGA Tom Sluijk Hans Verkooijen Albert Zwart Fabian Jansen.
Foreword…….. The receiver design is on hold in order to achieve the AAVS0 goals.
Timing for AP: introduction Javier Serrano AB-CO-HT 15 September 2006.
FADC Time Study EJ, HD 10/09. Purpose: to test Hai Dong’s firmware implementation of Indiana U. timing algorithm NOT meant to be a definitive study of.
ESS Timing System Prototype 2012 Miha Reščič, ICS
ProjectImpactResourcesDeadlineResourcesDeadline Forecast Plan Time Resources Risk 001xx 002xx 003xx 004xx 005xx 006xx 007xx TotalXX Example 1: Portfolio.
SLAC Aerial View. SLAC Timing System Specifications Blue Book: (~1968) - Resolution: 50 nSec - Jitter: 15 nSec - Main Trigger Line Waveform: + /
Precise measurement of physical link delay 802.1as, IEEE 802 plenary Lu Huang
JCOMM Observation Programmes Support Centre – Argo Information Centre November 2014 Argo Status Argo TC, M. Belbeoch.
Nd:YAG Solid Laser Xiangyu Zhou 20. Nov Yb fiber laser system on the ground Menlo 1030nm oscillator Grating stretcher (Transmission) SOA pulse.
1 Status Report on Time and Frequency Activities at NPL India A. Sen Gupta, A. Chatterjee, A. K. Suri, A. Agarwal, S. Panja, P. Arora, S. Yadav, P. Kandpal,
/14 Measurements and cross checks on OPERA timing equipments G. Sirri INFN Bologna On behalf of the OPERA Collaboration LNGS, 28 March 2012.
Vladimír Smotlacha, CESNET Alexander Kuna, IPE Time and Frequency Transfer in All-optical Network TNC 2011 Prague 17 May 2011.
V.Duk, INFN Perugia1 CHOD TDAQ status and rates Viacheslav Duk, INFN Perugia On behalf of the CHOD working group.


MULTIPLE PRODUCT ROADMAP
Crystal Oscillators Alex Fertelmes
Argo Status Argo TC, M. Belbeoch

Industry Capital Expenditures
Изразеното в настоящата презентация мнение обвързва единствено автора и не представлява официално становище на Комисията за финансов надзор Данил Джоргов.

Muon Port Card Latency, October 2015
Fiber Optic Transciever Buffer
Presentation transcript:

(25 AUG 2015 – 6 OCT 2015)

UTC(NIST) 1PPS UTC(NIST) 5MHz NIST receiver NB02 receiver 5MHz distribution amplifier 5MHz fiber link 1PPS Generator 1PPS distribution amplifier 1PPS 5MHz 1PPS 5MHz1PPS 5MHz distribution amplifier x2 1PPS Generator 10MHz distribution amplifier OPM7 O-trav 5MHz 10MHz 1PPS REFDLY NIST = ns REFDLY NB02 = ns NB01 receiver 1PPS Note: REFDLY is defined as the delay with respect to receiver’s internal reference. REFDLY OPM7 = ns REFDLY OPM8 = ns 5MHz REFDLY NB01 = ns NISS receiver 1PPS REFDLY NISS = ns (15331-