DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.

Slides:



Advertisements
Similar presentations
CALICE meeting, Montreal, 10 th May 2006Václav Vrba, Institute of Physics, AS CR ECAL Si sensors status and plans May 2006 V.Vrba.
Advertisements

Vanel Jean-Charles LLR – IN2P3 08 / 12 / 2004 : Calice Meeting Desy ECAL prototype status Calice ECAL Prototype Status Silicon sensors : Production Reception.
Portland, October 20, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba* Institute of Physics, AS CR, Prague *for CALICE collaboration Silicon.
HH Dec 13Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
Optical Fiber Calibration System and Adaptive Power Supply Jiri Kvasnicka, Ivo Polak, Jaroslav Cvach Prague, Institute of Physics Gerald Eigen,
LCWS2010, Beijing, 2010 MAR29 Ivo Polák, FZU, Prague1 LED notched fibre system at AHCAL Calibration system for SiPM Ivo Polák 1.Notched fibre.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
Ivo Polák SiPM needs short optical pulses
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak Institute of Physics (FZU), Prague June 11, 2011TIPP 2011, Kvasnicka1 The.
ECFA, JUN10, 2008Ivo Polak, IPASCR, Prague1 Electronics part of AHCAL calibration system ECFA meeting at Warszawa.
Sep 13, 2007CALICE Collaboration Meeting Prague 1 Long term test of LED pulsing  Long LED system stability measurement  Aging of part of optical system.
EUDET, OCT8 - 10, 2007 Ivo Polak, IoP Prague1 A fast LED driver prototype for HCAL calibration EUDET annual meeting at Ecole Polytechnique, Palaisau.
External calibration system - QMB6 Distribution of light: Notched Fiber Calibration and Monitoring Board (CMB) 1-ch LED driver (QMB1) Calibration System.
Feb 20, 2009 CALICE meeting, Daegu, Korea QRL in Magnetic Field 1 QRLed Driver in Magnetic Field Jaroslav Zalesak Institute of Physics of the ASCR, Prague.
Optical calibration system for EUDET AHCAL module Jaroslav Cvach IPASCR 1.Calibration system for SiPM photodetectors 2.QRLED driver photoelectron spectra.
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka Institute of Physics, Prague June 11, 2011TIPP 2011, Chicago1 Under.
LED calibration systems for CALICE hadron calorimeter
ECAL silicon- tungsten status
Anatoli Konoplyannikov Design and integration of HV, LED monitoring and calibration system for HCAL Overview of the subsystems design High voltage.
Calibration UV LED system for CALICE scintillator based Tile Hadron Calorimeter Ivo Polák on behalf of the CALICE Collaboration Institute of Physics of.
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
LPNHE activities Contribution in the development of an assembly line for highly granular calorimeters with semiconductor readout Gluing robot system Metrology.
Hadron Calorimeter Felix Sefkow EUDET Annual Meeting October 20, 2006.
CALICE ANL, MAR18, 2008 Ivo Polak, IPASCR, Prague1 A fast LED driver prototype for HCAL calibration CALICE meeting at ANL, USA.
Light Calibration System (LCS) Temperature & Voltage Dependence Option 2: Optical system Option 2: LED driver Calibration of the Hadronic Calorimeter Prototype.
Munich, 18 Oct 2006J. Cvach, annual JRA31 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5.
Montpellier, November 12, 2003Vaclav Vrba, Institute of Physics, AS CR 1 Vaclav Vrba Institute of Physics, AS CR, Prague CALICE ECal Status Report.
1. DESY tests 2. Electronics developments 3. Optical developments 4. Outlook Casablanca J. Cvach, CALICE Coll. meeting.
ANL, MAR-2014Ivo Polák, FZU, Prague1 Activity on Compass 2 detector with Calibration at Prague Ivo Polák, on behalf of Prague’s group Compass.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
CALICE / Silicon PM activities Detector and readout electronics development Development of a system for mass production of AHCAL “HBU” scintillator/PCB.
LHCb HCAL PMT problems initial report 1 Yu. Guz. LHCb HCAL & ECAL 2 Yu. Guz PMTs of type HAMAMATSU R are used in both HCAL and ECAL. The detector.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
oct - 6Ivo Polák, FZU, Prague1 Calibration system for SiPM and LED notched fibre distributing system Ivo Polák, on behalf prague’s group
15 February 2007Dirk Wiedner / LHCb1 Radiation Monitors for LHCb.
LED calibration systems for CALICE hadron calorimeter Jiri Kvasnicka, Ivo Polak, Institute of Physics, Prague June 11, 2011TIPP 2011, Kvasnicka1 The CALICE.
Scintillator tile – SiPM development at ITEP Michael Danilov, ITEP CALICE Meeting, Casablanca, 23 Sep 2010.
Main HCAL, JUL1,2008Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers HCAL main meeting, DESY.
August DESY-HH VFCAL Report W. Lohmann, DESY Infrastructure for sensor diagnostics FE Electronics Development Sensor test facilities Laser Alignment.
The 2 nd SCECAL module for the Fermilab beam test - tentative idea - S. Uozumi (Shinshu) Jun GLDCAL meeting Next beam test will be held likely.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
2011 Sept 14-16Ivo Polák, FZU, Prague1 LED notched fibre distributing system QMB1 single LED slice Ivo Polák, on behalf prague’s group 1.QMB1.
Annual EUDET, OCT6,2008 Ivo Polak, IP_ASCR, Prague1 Calibration system with optical fibers for AHCAL EUDET annual meeting, NIKHEF 1.Introduction 2.QRLed.
Hadron Calorimeter Felix Sefkow EUDET Extended Steering Meeting September 11, 2006.
CDMS II Shielding To Installation To Construction From Design.
ILC/EUDET developments at LAL Scientific council 23/9/05 B. Bouquet, J. Fleury, C. de La Taille, G. Martin-Chassard LAL Orsay.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Front end electronics for the Tile HCAL prototype Felix Sefkow DESY CALICE Collaboration ECFA workshop Durham September 1, 2004.
SiW Electromagnetic Calorimeter - The EUDET Module Calorimeter R&D for the within the CALICE collaboration SiW Electromagnetic Calorimeter - The EUDET.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
Scintillator HCAL prototype commissioning and calibration J.Cvach Institute of Physics AS CR, Prague Calibration basics Test results Outlook LCWS 06.
JRA3 Institute of Physics ASCR Prague
LED notched fibre system short HBU0 party with QMB6
CALICE Silicon ECal Sensors Status and prospects
A fast LED driver prototype for HCAL calibration
EUDET JRA3, Activity Obninsk State University
CALICE meeting 2007 – Prague
WP02 PRR: Master Oscillator and RF Reference Distribution
ECAL project in the future 2-3 years
LED notched fibre system at AHCAL Calibration system for SiPM
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
A fast LED driver prototype for HCAL calibration
Scintillator HCal Prototype
Calice Tile-HCal and Tail-catcher/Muon Tracker
Presentation transcript:

DESY, 8 Dec 2005J. Cvach, prekick-off JRA3 JRA3 Institute of Physics ASCR Prague 1.ECAL, VFCAL (V. Vrba) 2.HCAL (J. Cvach) 3.Exchange in NA2 (travels 8.5 k€)

1. Prague group  Contribution for ATLAS Silicon laboratory (pixel detectors – inner detector) Scintilator laboratory (TileCal)  Physicists Delphi, ATLAS H1  CALICE from 2001

Tasks in EUDET & budget w/o overheads  Si sensor development for ECAL, VFCAL  Monitoring system for HCAL  Consumables k€ Si sensor development + production (34.6 k€) VME test stand (20 k€), calibration electronics (22.2 k€) computing (4.9 k€)  Personnel - 13 k€ for PhD students  Travels 4 k€  Contribution from the Institute Permanent staff – 67 ppm Travels (6.7 k€)

DET1DET1 DET2DET2 DET3DET3 DET4DET4 DET5DET5 DET6DET6 DET7DET7 DET8DET8 DET9DET9 Si wafers from Prague (G. Geyckin, ECFA workshop, Vienna, November 2005)  Wafers are of excellent quality. Very low leakage currents before gluing  Gluing procedure attacks passivation. Leakage currents increase by orders of magnitude after gluing, breakdown voltage drops Problem was not solved by chemical surface treatment or different gluing protocols (time, temperature). Under investigation!

Si wafers from Prague – cont. 10 newly processed wafers (ON semiconductors, Rožnov) before gluing:  low leakage current  stable breakdown voltage after gluing:  leakage current ×10  but breakdown voltage stable Recently, manufacturer tries to minimize damages from assembly and delivers sensors for prototypes.

HCAL - Calibration + Monitoring Board system (I. Polák in Vienna) CMB is provides  calibrated UV flashes to the scintillator tiles  optical feedback via PIN photodiode  sensing of temperature at scintillator planes and CMB  connection via CANbus to the detector Slow Control  setting enable, amplitude, pulse width of each LED  monitoring of temperature, voltages, …

HCAL plane

Lower part of CMB – PCB LED driver motive zoomed - 4-layer board 1.6mm thick - size 480 x 80 mm

Test stand  The stand in the scintillator lab is a combination of CAMAC and NIM modules  Equipment is 8-20 years old  We applied in institute to finance in the next year 10 VME modules + crate A scope TDS 3054B  The stand will be depreciated in 3 years by amount of 20 k€ from EUDET NIM CAMAC

What we intend to do in EUDET (2)  ECAL – to solve technical problems with assembly and deliver sensors for prototypes  VFCAL – using the solutions with sensors for ECAL deliver Si sensors for prototype: 1 tower = 20 wafers  HCAL – calibration electronics 2006: 40 (double)boards Later: new prototype version for simplified light distribution over the plane We expect new prototypes being developed every 2 nd year and produced the following year

Resources EUDET & others  Main contribution from EUDET - consumables  Upper table – our spending profile for consumables in EUDET  Lower table – funding needs given to WWS panel of LC - R&D program on HCAL  Similar table will be done also for ECAL, VFCAL  EUDET funding is important but minor source of total needs yearEquipmTravelsFTE k€25 k€2, , , , ,0 yearHCALECALVFCAL k€6 k€2 k€ ,551,94, E U D E T HCAL total - WWS