Magnetized Beam LDRD: Design Tasks February 19, 2016.

Slides:



Advertisements
Similar presentations
PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
Advertisements

HISTORY, EVOLUTION AND DESIGN OF THIN SEPTUM MAGNETS AT BNL Michael Mapes The 14 th ICFA mini-workshop on septa devices.
RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Solenoid Pressure Regulator Check Valve Hand-turn Valve Pipe Clamp L-Bracket Mounting Block Plastic Tubing AN Fitting AN T-Fitting Pressure Sensor Base.
Global Design Effort Compact Water Cooled Dump Resistor IRENG07 Wes Craddock September 19, 2007.
OLYMPUS Collaboration Meeting Cooling Water David Rodríguez Piñeiro Mainz University OLYMPUS Collaboration Meeting DESY
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
9 June 2006MICE CM-15 Fermilab1 Progress on the MICE Cooling Channel and Tracker Magnets since CM-14 Michael A. Green Lawrence Berkeley Laboratory.
TAGGER MAGNET DESIGN Presented by Tim Whitlatch Hall D Tagger Magnet Design Review July 10,
Chapter 11 Flange splice.
Overview of Phobos Magnet Designed by Harald Enge Built by Danfysik Technical summary: –“Double dipole” design –15.5 cm air gap –Max. 2 Tesla field –378.
LINAC LASER NOTCHER READINESS REVIEW August 5 th, 2014 Kevin Duel – Mechanical Support Engineer.
Preliminary studies for Muon shield modification to accommodate LCLS II Alev Ibrahimov December, 2010 BSY.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
SuperFRS Multiplett and Dipole Vacuum Interfaces Multiplett: Insulation vacuum: Insulation Vacuum Pumping flanges: Two CF flanges of the size DN160 must.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
INTER-LAKES BASES PRODUCTS. MODEL B-75 MACHINE BASE B-75 Model with panels and doors.
Robin Wines. Verbal agreement with BNL to acquire 48D48 magnet Contact at BNL indicates 4 of these magnets in storage BNL agrees to disassemble magnet.
Task7: NUSTAR2 - Design and Prototype Construction of a Radiation-Resistant Magnet C. Mühle GSI Task leader: G. Moritz /GSI.
BDS 11 Vacuum System for BDS [Completeness of RDR] Y. Suetsugu J. Noonan and P. Michelato Design principle Basic design Cost estimation.
Forum March 2003H.Taureg1 Magnetic Fields in ALICE Mapping and Monitoring.
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
1 Progress of IR Vacuum Chambers Chen Peng May 11,2007.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Beam Line Layout – Cooling Section There seems to be two options for energy measurement: at the 180 dipole and/or in a diagnostic branch at the end of.
Low Energy RHIC e - Cooling Meeting Minutes – 11/19/14 1. Cooling Section Magnets and Power Supplies –Most of power supplies will be from ERL (R. Lambiase).
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
1 MICE Beamline Installation, status & plans Contents: Upstream & Target, BPM Decay solenoid DSA, D2, Q4,5,6 cKOV support Q7,8,9 Open issues & concerns.
Harold G. Kirk Brookhaven National Laboratory High-Field Solenoids for a MC Final Cooling System AAC 2012 Austin, Texas June 11-15, 2012.
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
Proposed Conventional Sextupole for Installation at A0 Introduction (Dean Still) Reasons for installation- Reduce I in S6 feeddown sextupole circuit at.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
LARP Collaboration Meeting Racetrack Coil Fabrication
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
ATF2 Magnets ATF2 Magnets 14 Sep 2007Cherrill Spencer, SLAC. Cooling Solid Wire Sextupoles 1 Report of the effort to cool an old FFTB solid wire sextupole.
Update: Puck and Gun Magnet March 1, Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber.
Design Update Puck and Gun Magnet February 16, 2016.
Magnetized Beam Update (LDRD) JLEIC Collaboration Meeting March 29, 2016 Riad Suleiman and Matt Poelker.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
ESS DTL: Prototyping M.Comunian - F. Grespan – P. Mereu Lund– 10/04/2013F.Grespan.
LCWS11 WG4 Fully featured accelerating structure engineering design
Pull Force Measurements of the Magnetized Beam Solenoid
QXF Coil Fabrication & Tooling Reaction / Impregnation
Bunching system for SPES project
PIs: Riad Suleiman and Matt Poelker
Service channels between Tracker and PP1
LARP Phase II Secondary Collimator RC1
AEGIS Magnet System.
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
Barrel EMC assembling (EDMS DOCUMENT NUMBER /1)
by P. Musumeci and F.Tazzioli
EBTF Design Review Technical Meeting Group
Integration issues at IHEP
Status of ATF2 FD Magnets and Info on their FFTB supports & mover
SHMS Downstream Beamline Large SHMS/HMS Angles (Config-1)
The basic parts needed to make a flux capacitor are 8 high voltage capacitors (Vishay Cera-Mite 500 pf 15 KV capacitors with Y5U dielectric are suitable),
NEG-coated gun: Black R30 arc at 227kV, white R30 arc at 164 after refurbishing and second bake Carlos Wednesday, August 10, 2018.
LARP Phase II Secondary Collimator RC-1
LCLS Vacuum System Plans (July 07)
BGC Collaboration Meeting –
One Coil Gun Magnet February 2, 2016.
PIs: Riad Suleiman and Matt Poelker
Presentation transcript:

Magnetized Beam LDRD: Design Tasks February 19, 2016

Magnetized Gun 2 K 2 CsSb Preparation Chamber HV Chamber

Solenoid + Steel Puck 3 18” 7.5” 12” 6” 0.5” 9.0 cm Steel Puck Gun Table 8” 6.4 cm Moly 10” Cathode-Anode Gap

4 Update Cathode, Anode, and 10’’ flange in drawing Update Cathode, Anode, and 10’’ flange in drawing

Steel Puck 5 Molybdenum and Steel hybrid puck Use 1010 carbon steel New Puck Manipulator End Adapter

6 Steel Moly 6 mm 10 mm Design I Brazed – not screwed

7 Steel Stainless Steel 2 mm 10 mm Design II 2 mm 4 mm

8 Cut this part 2 mm

Solenoid 9 Not bakable – will be mounted on rails. To bake gun: push downstream out of oven and run LCW through. Move gate valve after beamline solenoid (in place of BPM). Move HV Chamber front foot upstream Bare coil – no cylindrical steel shield/return Procurement (with help from T. Hiatt): 1.Everson Tesla 2.Buckley Systems 3.Alpha Magnetics 4.JLab Machine shop

Solenoid Specs 10 One water cooled magnet coil Inside diameter 30 cm, round to 0.2 cm Outside diameter roundness: 0.5 cm Flatness, each side, 0.3 cm Eight double pancakes of 20 turns each using Luvata 6092 or equivalent copper conductor, 9 mm square with 6 mm round hole for water cooling. These may be soldered or bolted together as vendor prefers, see also potting options below. Vendor should propose input/output flags suitable for 450A. Eight parallel water cooling circuits, one per double pancake, with 37° flare JIC tube fittings. All eight water connections shall be located on the coil outer diameter within a 15 degree region of the assembly. Vendor shall provide a cooling water specification (flow rate and pressure) for each water circuit assuming 450A current and water inlet temperature of 35°C. Coil cross-section shall be less than 16 cm Z by 20 cm R. Vendor shall propose insulation system. Glass-epoxy with at least 110°C capability preferred. Potting may be done as a “bag job”. Tooling could also be built to pot four double pancakes as a coil half with four water circuits and two leads. Bolted jumper plate to electrically join the two halves shall be provided in this case. Or full depth tooling can be built. Power supply is 500A, 80V and we plan to operate at 450A and 72V.

11 Magnet Mounting Gun Table Rails Allow for small adjustments to center solenoid on beam

Design Tasks (prioritized) 12 1.Magnet Coil: I.Fit to 10’’ flange, laser ports, gun table II.Drawing for machine shop 2.HV Chamber: update cathode, anode 3.Beamline: draw up to 3 feet downstream 4.Magnet Mounting 5. Steel puck and puck manipulator

Magnet Timeline 13 1.Coil designed – by end of March 2.Coil procured – by end of April 3.Coil on site – by end of July 4.Coil mapped – in August 5. Coil installed – by end of August